Document LJb7LLbL2OdgVnkvd0L24oqng

I^ANT MANAGER'S SAFETY BOAR MINUTES OF MEETING January 17, 1979 cc: P.E. BruDaker G.E. Sma11 Present: J W. Bostick J. E. Clark G. A. Danner G. W. Daues w. C. Fuller J. A. Glass R. A. Hernandez R. C. Martini M. L. Owens C. M. McCullough D. W. Metten G. T. Ryan H. M. Ca,cy (for Trafto n) w. H. Triplett 1. REVIEW OF STATISTICS TEXAS CITY SAFETY PERFORMANCE SUMMARY 'December 1978 TOTAL INJURY CASES 1977 1978 MTD YTD MTD - YTD 22 501 21 295 RECORDABLE CASES 1977 ____ 1 97S ) MTD YTD MTD YTD (a) INJURIES WITHOUT LOST WORK DAYS (Medical Treatment Only) 1 30 3 :o (b) LOST WORKDAYS CASES 0 80 6 **B. RESTRICTED ACTIVITY 0 40 3 **B, DAYS AWAY FROM WORK CASES 0 40 3 (c) FATALITIES 0 60 0 *TOTAL RECORDABLE CASES 1 *A+B+C = TOTAL RECORDABLE INJURIES **B..+ B = (B) TOTAL LOST WORKDAY CASES 44 3 36 INJURY RATES PER 200,000 MANHOURS 1977 MTD YTD DECEMBE . 19 78 YTD 197S MTD YTD MCIC TIR - TOTAL INJURY RATE RIR - RECORDABLE INJURY RATE TLWR - TOTAL LOST WORKDAY CASE RATE DAWR - DAYS AWAY FROM WORK CASE RATE 15.81 0.72 '0 0 17.74 2.59 0.47 0.24 15.35 2.19 0 0 17.10 2 . 09 0.35 0.17 2.1" .6 . 30 ) TLWR TARGET: 1:45 (1/2 CHEM. IND . AVG.) SC 002747 STG 2402067 LAM003954 PMSB Minutes - 1/11 r** f Page 2 !v> . COMMENTS ON STATISTICS -- Glass The above statistics show lower rates in all categories and becomes the new record best year. A review of the charts shows continuing rising trends in Chemical Contact and Lift/Push/Pull categories. Individual departments with rising trends were also highlighted. 3. OLD BUSINESS a. Emergency Procedure Manuals -- Glass It is essentially complete with the exceptions of revisions necessary because of staffing and changes in assignments. b. Plant-Wide System Survey -- Triplett (b-1) Following a survey of the plant-wide alarm system, lists of problem areas were developed and repair orders were issued. Some revisions have been made and the system will be tested early this year. An Emergency Procedure Plan test was targeted for January; however, a number of revisions in staffing are underway, and a critique of the changes made since the last test is needed prior to scheduling another test. Tentative date is now expected sometime in February. Cyanide Area Alarms -- Triplett (b-2) A series of preliminary testsof the audible alarms is scheduled to determine the proper placement of horns in cyanide pro ducing areas on January 18 or 19. These audible alarms will be used in conjunction with flashing lights on the periphery of cyanide producing units to notify persons of an alarm condition within the unit so that they can remain outside the unit until the condition is corrected. In event that the condition could impact on areas outside the unit, the general plant alarm would be sounded. It is anticipated that a plant-wide publicity and education program would be used prior to puting this alarm system into actual operation. Target date is now set for the end of February. c. Respiratory Protection on Fit Testing -- Ryan The P-Bulletin for Repiratory Protection on Fit Testing is now in for typing. It will not be distributed until an ap proved training program is ready for plant-wide use. The training program is being prepared in Loss Prevention and Safety. It is expected to be completed by the first of February. d. 1978 Safety and Property Protection Survey -- Glass The Safety and Property Protection Survey and assignments were made for each recommendation listed in the survey and reported as follows: SC 002748 STG 2402068 LAM003955 PMS3 Minutes 1/1O 9 Page 5 Recommendation Number 73-1 73-2 73-3 78-4 73-5 78-6 73-7 73-8 78-9 78-10 78-11 78-12 73-13 7 S - 14 73-15 7 S -16 76-9 76-12 77-4 77-5 77-9 77-11 Title Improperly Threaded Nuts Electrical Switchgear Pro tection Eyewash Stations Gas Cylinders --1 - HCN Storage Tanks Wind Breaks HCL Unloading Fire Protection Audits Cylinders Scrap Pallets ACY Unit Emergency Diesel Shutdown Chocks and Derails EB Dehydro Unit Alley HDPE Finish Area Foot Protection Program Cylinder Storage Area Stores and Receiving Sprinkler Maintenance Stores Lactic Acid Overhead Pipe Racks Responsibility M. McCullough W. C. Fuller SAC J. A. Glass J. G. Trafton SAC W. C. Fuller J. A. Glass J. A. Glass SHAC G. A. Danner J. G. Trafton C. M. McCullough G. A. Danner M. L. Owens J. E. Clark G. W. Daues SAC , G._ A. Danner G. A. Danner J. G. Trafton J. G. Trafton/ W. C. Fuller SC 002749 STG 2402069 LAM003956 PMSB Minutes - 1/079 Page 4 4. Report of the Safety Advisory Committee (SAC) -- Rvan a. Riding Bicycles Through Operating Units - SHAC is checking on plant practices in operating units before reporting back to SAC SAC was asked to consider also the problem of control on the number and use of bicyles in the plant. b. Tech-Facts, No. 51, Control of Water Treatment Processes The committee reviewed the recommendations of this TechFact and appropriate corrective action and response is in progress. This is considered a normal Utilities responsi bility (W. C. Fuller). Fulfillment of the recommendations will be a part of the responsibility of the new Utilities Technology Group now being formed. c. Lighting Inside Tanks Vessels - A review of this item resulted in the conclusion that we must conform with OSHA and use only twelve (12) voTjts inside tanks, except where this is not adequate to provide the necessary power or pro tection. A special permit to use ground-fault interrupters, (GFI's) must be used. This decision will be highlighted in a bulletin to be issued by SHAC. d. Tank Content Signs - The request to paint signs on the outside of tanks showing the contents was found to create more problems than the advantage of having the tanks labeled since many tanks have multiple uses and the contents change. SHAC will respond to this suggestion that came from the Hourly Safety Committee (HSC). e. Ladder Inspection Procedure - This was approved for issue. 5 Report of Safety and Housekeeping Action Committee (SHAC) -Triplett/Hernandez a. Fire Entry Permit Procedure - SHAC review of the Procedure Bulletin has now written revealed several opinions and mis understandings which could result in lack of uniform appli cation of the procedure on a plant-wide basis. : SHAC has scheduled a review of the procedure with the committee of authors to resolve the problems. It is anticipated that the bulletin will be revised and reissued. b. Plant Breathing Air Analyzer - The analyzer now monitoring contaminated concentrations in the plant breathing air is on line and in operation in the final development stage. It is currently being used as a good data source. .Theinstrument has not been turned over to the instrument group for maintenance. Allowable limits of contamination and appropriate action steps in case of excursion have not yet been established. Plant wide publicity will be given to this instrument and its use when the instrument and plan STG 2402071 SC 002751 LAM003958 i'M53 Minutes - l/y^79 Page 5 are ready to use. c. Procedure for Using Hoses within the Plant - A proposed P-Builetin on the use of hoses has been forwarded to SAC for review and comments prior to circulation for aDproval by PMSB. d. Joint Meeting of 1978-79 SHAC - An all-day meeting of the two SHAC! Committees were held to review plant safety pro gram needs. Several programs were ,reviewed and are currently being evaluated. A proposal for the plant-wide program is expected to be reviewed either in a special called meeting or at the next scheduled meeting of the PMSB on February 21. 6. Review of Incidents The following incidents were reviewed although the reports have not yet been issued: a. Fire in Polyethylene Mixer'Area (35F) b. Owens-Corning Insulator Incident (Dept. 55) c. Recordable Injury to. Boilermaker/Laceration to knee d. Muriatic Acid Spill (Dept. 13) e. Benzene Tank Overflow (Dept. 13) f. Condensate Tank Floating Roof-Drain Valve Failure (Dept. 10) 7. Other Significant Events a. Decatur Fire Report - A report of a major fire in the Monsanto Decatur, Alabama, plant has been received. The causes of the fire evolved around a failure of an AN pump and associated piping. The conflagration was so intense that it caused the rupture of a 650# steam header which shutdown major portion of the Decatur plant for over a week. A detailed report is being circulated in AN and Maintenance in an attempt to learn from the Decatur experience. 8. Contractor Safety - McCullough McCullough reported that there were several indicators of improved contractor safety performance which he would circulate to mem bers of the PMSB. 9. Removal of Unused Pipes from Pipe Racks Metten, Danner and Glass will review this problem and have a comment at the next meeting of the PMSB. 0. Duplicate Emergency Radio System McCullough will review status at the next meeting. SC 002752 STG 2402072 LAM003959 "MSE Minutes - l/l/^'7 9 Page 6 11. Glove Problems Department 35F is issuing non-slip work gloves for use in handling bags of polyethylene pellets. These gloves offer no protection against exposure to chemicals; however, they are also useful in certain maintenance operations involving use of sharp-edged objects such as--tower trays, sheet metal, tray clips, and other special items. Department .55F plans to stamp their gloves " 55 Pack Out" and limit their use and application. Maintenance Superintendents are responsible for controlling the use of their gloves to the specific applications where this type of hand pro tection is needed. Loss Prevention and Safety will monitor the use of these gloves on a piant-wide basis to determine the effectiveness of the control measures being employed and will comment on the hazards of improper use and chemical exposures encountered when misused. 12. Galveston County Disaster Preparedness Council - Daues County Judge, Ray Holbrook, and'the University of Texas Medical Branch in Galveston are organizing this council to improve the handling of large numbers of injuries of the type experienced in the Galveston Grain Elevator Explosion and Fire. They are currently making a survey of available equipment and personnel within Galveston County that could be mobilized in case of an extreme emergency. Greg Daues will keep-us posted on the activi ties of this group as the program develops. JAG/je J. A. Glass k SC 002753 STG 2^02073 UAM003960