Document LJNbVbGp41Z9Kjn3Qzwnr001X
ASARCO
f O 1 - REVISED t/2
fUNT jom no.
APPROPRIATION mo*
.V\Oj
PACC 1
OF 1
PURCHASE ORDER
OATEl
FEBRUARY 1, 1973
AMERICAN SMELTING ANO REFINING COMPANY
o*oe* no. "DUMMY" 1 3 H-0 3 0 0
PURCHASING DEPARTMENT
RCQUIII TION NO*
320 BROADWAY, NEW YORK. N.Y. I0CO5
EP-5
To: SOUTHWESTERN INDUSTRIAL CONTRACTORS & RIGGERS, INC.
(Original not to be mailed out. For record purposes only.) _______
date required AT destination;
____________________AS ARRANGED
SHIPPING INTERVAL PROMISED
SELLER WILL SNIP CFOAC!
AS ARRANGED
point or shipment
TERMS
AS ARRANGED
F.O.*. POINT
FIN*L OESTINATION-RlEASC NOTE CONSIGNMENT BELOW
EL PASO, TEXAS
3021
CONSIGNMENT . SELLER WILL SHIP TO
AMERICAN SMELTING & REFINING CO. EL PASO'IPLANT EL PASO,I TEXAS
RENDER SILLS AS RER ATTACHED SHIRRING INSTRUCTIONS
quantity
ITEM NO.
unit Price
THIS PURCHASE ORDER ENTERED INTO W: & RIGGERS, IN 1611, EL PASO,! TO COVER INSTAl^,. ACCORDA>`CIT?fTH `` REFER
5D TO RECORD AGREEMENT ?RN INDUSTRIAL CONTRACTOR
FT AVENUE, P.0. BOX $48 ^TED JANUARY 18, 1973
/ENTILATION SYSTEM IN ICATIONS AND DRAWINGS
613,441.
~ 1 IETH
\~^*v IMPORTANT This order is not binding on p urckater unless the attached acknowledgment card is signed by an authorised acenl oT setter and returned promptly (o purchaser. FOR PURCHASING DEPARTMENT USE ONLY
TVD$613,441.0(Qrhprcn 601
Pr 206
DISTRIBUTION: 3-Plant
ASARCO ELP 0000243
1 V QUOTATION
SOUTHWESTERN
INDUSTRIAL CONTRACTORS AND RIGGERS, INC.
t ao,- a* M'Ti-ai-<.
1730 Itmll Avt.
" ...
F.O.IU11
. El Paso, Texas 79948 " ...
..v. .l/'f'>.'>
4-:
ASARCO - El Paso Smelting Works
HATC
15 January 1973
p. o. Bor mi
. ..
.....
' ...............
El
Paso,
*. -...t*'
t-csv --T r 1
Texas .-79999 :
-
. " li*
' ''
pro.ifct El Paso J;:-s Ho. '
" '' 567,' 577, 578 and 579
Attn: Mr. R. 0^.`Covington
,,, .... ......
' El'paso, Texas
\
We propose to furnish labor, equipment and materials for a complete"..
installation of the four jobs as shown in revised specifications and the
drawing list shown as Appendix 3 to the specifications as follows:
\v -
.*.** *
3.2.1 Lump sum cost
`'
$ 6l3,44l.QQ
"Ify
3.2.2 Completion time after bag house delivery 5 months
. \'i'
3.2.3 First construction time in field February 1, 1973
-:V
3.2.4 Cost breakdown:
'.
56761 56762
$ 15,158.00 91,539.00
.
56763 57701 57702 57703 57801 57802 57803 57804 57805 57901 57902 57903
26,075.00 8,679.00
55,039-00 12,275.00 137,000.00 10,562.00 40,456.00 27,565.00 27,626.00 14,417.00 28,179.00 12,071.00
. * *' i V ^ J '.'4 -c
3* 9 J*_
,*
f
_ -!*.<* * . j{\
...
-
' *a * * \;J' ' .:... >*-
\r
normal conditions of acceptance, sale and payment ARE STATED on reverse sioe of this quotation. ASARCO ELP 0000244
QUOTATION CONrD
-?:*
page__1_of_1_
datf
15 January 1973
El Paso Jobs No. PtOJECT 567. 577. 578 and 570.
4. l/l6" thick asbestos gaskets to be installed only on the pressure duct.
5. Electrical wiring which is not associated with this job and that must be rerouted for access to be rerouted by others.
6. ASARCO furnished baghouses to be factory assembled compartments (all internals factory installed). Insulation on ICA Bag House to be factory applied.
7. We have added one overhead door on the south end of the unloading enclosure.
8. Kiln ventilation alternate adds the cost for . installing two dampers with controls on the inlet side of the Kiln Ventilation Bag House.
9.
Electrical feeders to the substation to be rerouted as reviewed with ASARCO Engineering. PVC coated conduit to be used along spray chamber.
...
v*S:
v'V
A.
: :* * *. .
ASARCO ELP 0000245
QUOTATION CONT'D
''
` page_L_of_?--
date project
15 January 1973
El Paso Jobs No. 567, 577, 578 and 579
LOCATION
El Paso, Texas
10. We will use conduit hubs at all "J" boxes in lieu of specified lock nuts and bushings.
.11 We have added one ground well at flue rack steel conduit support.
.12 We are quoting on specified wire. If we are remitted" . to use an "or equal" brand we can effect a saving. .
`
-!,V
''i
13. Demolition includes only the following items thaaft. are not shown on the drawings:
. r*.
L.. !'V
a. Pole and existing power lines that interfere with deleading bag house.
b. Walls and ruof Of old Germanium Plant
c. Steel and wood leading ramps that interfere with 75 T. bin.
'7** - yV. -T
d. Wood tank that interferes with track loading bag house.
e. Two filter presses
f. Old trough type heat exchanger
g. Tank on platform and metal storage building that interfere with new belt conveyor.
h. Existing elevated concrete walkway that interferes with Matte Tap Bag House.
i. Existing flue at Matte Tap Ventilation to permit installation of new flue.
j. Existing hoppers in existing Cadmium Bag House. .
14. We have added a manual four way air valve to actuate the'
cylinder on the belt conveyor flop gate.
'
' _'V
15. Due consideration has been given to coordinating construction \;
work with operational requirements.
Respectfully submitted,
GRH:iz
ASARCO ELP 0000246
June 27, 1972 El Paso, Texas
Mr. Lee C. Travis, General Manager Western Department Salt Lake City, Utah___________________
APPLICATION FOR PROPERTY'APPROPRIATION LOW LEVEL EMISSION CONTROL INSTALLATIONS
EL PASO PLANT NO. 567 - $521,000_________
An appropriation approval in principle, P-2150, in the amount of $42-4,000 was granted by the Board of Directors on March 28, 1972. The items con tained in that appropriation approval had been discussed with the Vice Presi dent on his visit here on March 17.
Estimates had been compiled by the Engineering Department to determine the cost that would be necessary for the appropriations. Unfortunately, the matte ventilation system has been revised by Central Engineering, and the revised system requires an expenditure of $111,000 more than the original design. This increase is because of recommendations by the Fume Recovery Depart ment. The original design would discharge into the up-takes and a portion into the R&R flue system. The Fume Recovery Department calculated that the system would decrease the draft to such an extent as to prohibit utilizing complete gas availability. The new design incorporates a baghouse which will filter the fume and discharge into the preheaters, as well as the same volume as present into the up-takes. Surveys by the Environmental Science section indicate that smoke around the reverb when tapping matte contains sufficient quantities of lead that, at times, it may exceed the standards set by OSHA.
The estimate on the replacement of the blast furnace baghouse stacks has been increased by $15,000 over that discussed in March, The increase is a result of a closer inspection of the stacks when measurements were taken and it was discovered that the breeching between the stacks and the baghouse is corroded to such an extent as to require changing. The breeching and the stacks will be fabricated steel which will be insulated on the outside and coated on the inside to prevent corrosion in the future. This baghouse has been in operation 1941, and this is the first replacement of the stacks in that baghouse.
ASARCO ELP 0000247