Document LJDJqv7kJLONXoBkrGVrkMMjw

To: C. W. Harrison From: W. H. Meyer WHM-177-78 June 30, 1978 Third Quarter 1978 Work Plans Laboratory Chemical P. E. Hime G. D. Boyd J. Chervenka T. N. Dowdy H. A. Ducote K. G. Gallimore R. S. Hahn M. D. Harvey J. R. Higgins J. M. Hodges M. A. John B. C. Kerr C. W. Lee D. E. Lockwood Dr. C. E. Loeffler Dr. R. P. L'owry W. W. Massey A. G. McGehee J. T. McMahon R. A Mickelson J. C. Rubiano J. M. Sawyer G. R. Scholz W. L. Sharp R. W. Swanbeck H. H. Thigpen O. Towery J. L. Trumbley P. J. Volpe DISTRIBUTION Plastics J. L. Merian A. C. Abshier C. A. Amond W. C. Beyer R. L. Bunkley E. Munoz K. A. Rose C. S. Schmaltz CCCTC G. J. Fisher W. E. Heinz Dr. C. C. Hobbs W. J. Humphrey W. T. McNair Dr. D. R. Napier W. E. Taylor Central Files (2) J. N. Gann J. W. Dunn J. M. Ramey Dr. Tom Golson J. E. Sanborn W. H. Tuke F. B. McAndrews DR. F. Zitomer - Bay City - Clear Lake New York - New York - Bayport Terminal - Pampa - Summit - Summit File: 7i< 004135 CELANESE CHEMICAL COMPANY Chemcel Plant Bishop, Texas To: C. W. Harrison From: W. H. Meyer WHM-177-78 June 30, 1978 Third Quarter 1978 Work Plans Laboratory Attached are the third quarter 1978 work plans for the Laboratory. The schedules cover work plans for each chemist in the Special Problems Area, the Analytical Section work plans, and the Quality Assurance work pitas. It should be noted that product quality problems, low unit efficiencies-ane?' other unit problems will reduce time spent on cost reduction (development): projects. Additional progress should be possible as new chemists come on board in third quarter. WHM/as Attached Report 004136 AREAS I AND.IV Group Leader - G. D. Boyd Methanol Oxidation, Formaldehyde Blending J. D. Presley _____________ Objective______ Raw Materials Savings (Reduce Catalyst Usuage) Energy Conservation Raw Materials Savings (Increase Unit Efficiency) Plans 1. Sample for Iron in the air across MO-II and MO-III air filters in the third quarter and issue a report in the fourth quarter. Completion of this Objective will be dependent upon time needed for Unit Support. ^ 2. Continue MO Catalyst Screening study as needed and samples are r-_- available. 3. MO Catalyst Reuse - Issue report finalizing Lab evaluation of catalyst washing by end of third quarter. 1. ' MS II Crude to MO - Issue report for first Plant Trial.early in third quarter and plan for second Plant Trial with modifications to prevent first trial problems. 1. Reduce Methylal Formation in MO Distillation Column - Issue recommen dations for Plant Trial and conduct trial during third quarter if feasible. 004137 WHM-177-78 Objective MOB MOB -2- June 30, 1978 ! Plans 2. MO Efficiency Improvements with Trace Amounts Of Halogenated Hydrocarbons - Begin Lab study of AMR effect and issue Status Report by end of third quarter. Completion of this Objective will be dependent on amount of time needed for Unit Support. 3. Conduct a brief study in MO-I and determine possible efficiency improvements. A report will be co authored with Process Engineering. Completion of this Objective is wholly dependent on the run duration of Maintain daily contact with MO Units and Blending Unit and provide' Technical support as needed. Follow-up on recommendation to install Metalose Assition system down stream of anion beds as required. Utilities, BOD S. G. Smith, G. R. Stasney Objective Support Unit Expansion (Cost Reduction) Plans Anaerobic-Aerobic Laboratory Pilot Study - Study operation and feasibility of two-stage anaerobic-aerobic treatment of Bishop effluent. Plans are to: 1. increase loading to the Lab Anaerobic Unit to 0.5 pounds COD/ft^/ day. 004138 WHM-177-78 Objective Support Unit Expansion (Cost Reduction) MOB -3- June 30, 1978 Plans________________________________ ____ 2. line out the Unit on feed including Oxo effluent stream and Nylon waste water, and 3. begin sludge settling ability tests for clarifier design studies, by end of third quarter; 4. follow-up on installation of Process controller, 5. review preliminary objectives with Process Engineering and modify as needed. Aerobic Treatment of Bishop Nylon Unit Effluent - Determine the aerobic treat- - ability of Nylon effluent at varies Food/Biomass ratios. ` Determine if increased loadings of^ Aerobic system with Nylon waste water ' (loadings higher than projected) are i possible. Complete by middle of third quarter and issue report. Maintain contact with BOD Unit and provide technical support as needed. Make Plant tour of Vernon to study their anaerobic system. Attend Process design meeting on anaerobic filter in Pampa during the third quarter. _____________ Objective_______ Define Employee Exposure to Benzene OSHA Monitoring J. M. Jackson Plans Complete area and personnel monitoring in MO-IV, and Maintenance. Report data by end of third quarter. 004139 r WHM-177-78 _____________ Objective_______ Define Employee Exposure to Formaldehyde Define Employee Exposure to Asbestos Define Base Case Employee Exposure 4- June 30, 1978 _________ I Plans i Complete establishing Formaldehyde Exposure Zone La the To I and SH I area to define employee exposure areas early in quarter. Complete transfer of Plastics monitoring to Plastics Company Environmental Health Chemist. Emphasize Formaldehyde monitoring to provide information for SOCMA study. Monitor Maintenance employees during insulation removal as required. Continue work on Phase I and Phas^II monitoring. " AREA III Group Leader - H. H. Thigpen 1,3-Butylene Glycol L. Mayerle, R, G. Hilbrich Objective ______________________________ ____________________ Plans Energy Conservation _v Conduct a plant test of base steam 1,3-BG product rather than vapor sidestream after necessary unit modifications are complete. Late third quarter completion. Cost Reduction Recover BG from V-778 residue. Begin evaluation of potential recovery schemes in middle third quarter. 004140 WHM-177-78 __________ Objective Energy Conservation MOB MOB -5- June 30, 1978 __ Plans Provide analytical support as needed for the Process Engineering Project to replace steam jets with vacuum pumps. Late in third quarter. Maintain frequent contact with unit and provide technical support as needed. Evaluate feasibility of burning V-778, V-747 residues along with T-225 OH and T-202 OH in boilers and make recommen dations . _____________ Objective Cost Reduction Energy Conservation Pentaerythritol R. G. Hilbrich, L. Mayerle Plans Remove crystallization inhibitors from "A: Crystallizer feed or T-286 residue to increase efficiency of the "A" Crystallization step. Begin Lab oratory work in late 'June or early July. Project may carry over into fourth quarter. Support Process Engineering project to recover energy from "A" evaporator steam jet. Begin work in mid-third quarter to develop a process to clean up the resulting condensate and/or identify where it can be used without clean up. 004141 WHM-177-78 MOB Obiective MOB Energy Conservation Raw Materials Savings MOB -6- June 30, 1978 1 !Plans i Complete particulates sampling during Tech production to provide data for the air emissions survey. Maintain frequent contact with units to provide technical support as needed. Develop data for an economic evaluation of the proposed Tech. Center TMP purification systems to indicate if full scale piloting is justified. Final documentation by August 1, 1978. Reduce Formaldehyde losses in the lkp reaction system. Continue spot deter minations of the Methanol production in the reactors. Determine cause(s) if Methanol production is higher than normal. Maintain contact with unit to provide technical support as heeded. Diacetone Alcohol M. E. Harris Obj ective_____________________ DAA Raw Materials Savings V ____________________ Plans Provide analytical coverage for the next plant run using Goodyear Acetone scheduled for late June or early July. Document results along with a comparison of Dow vs Goodyear Acetone by August 1, 1978. 004142 WHM-177-78 ___________ Obi ective_____ DAA Raw Material Savings MOB MOB -7- June 30, 1978 Plans Reduce Acetone losses to Mesityl Oxide by adding water to the reactor feed the first few days after catalyst regeneration. Schedule Plant trial late in third quarter or early fourth quarter. Identify an unknown component recently discovered in DAA product at relatively high levels-. Determine how to control its production in the unit. Complete by September 15, 1978. Maintain frequent contact with jin^-and provide technical support as needed. Esters, Methylal Paraform Formcels M. E. Harris, R. G. Hilbrich Objective___________________________________ ____________________ Plans Cost Reduction Provide a method of automatically controlling reflux on the acetate reactor column (T-268) by correlating conductivity of the overhead water phase with acid content. Issue final report in July. Cost Reduction - 1 Assist in obtaining microprocesser control of the Ester Unit by providing 004143 i WHM-177-78 Objective Cost Reduction- .Energy Conservation Energy Conservation MOB -8- June 30, 1978 ! Plans laboratory cross check of the unit analyzer as required. Test the Formaldehyde made from MS Crude for suitability as Paraform feedstock. If unsuitable, assist in determining the source and identity of the contaminants responsible. Issue final report in early July. Sufficiently define the alternate n-Butyl Acetate Process to allow a reasonably accurate estimate of the economic potential early July. Assist as needed in the second attempt to start up the new Ester Unit Reactor Column (T-343). Provide vapor, liquid equilibrium data to indicate the proper operating composition ranges in the reaction kettle. Complete documentation by August 1, 1978. Maintain frequent contact with the units and provide technical support as needed. 004144 WHM-;77-78 -9- June 30, 1978 AREA II Senior Chemists - F. R. Dow and A. J. Bacon Methanol Synthesis II F. R. Dow Objective___________________________________ ____________________ Plans MOB (Support MS II Turnaround) Provide analytical support for Lurgi GL-122 oxidation, ICI-51-2 reduction and/or process analyzer back-up. Provide technical support as needed. MOB (Cost Reduction) Continue the non-routine monitor^ of incoming natural gas for composition BTU and sulfur concentration. MOB (Crude Methanol composition and Purification Tower Profiles) Profile A and B train purification towers for component distribution after MS II turnaround. The data will help determine optimum flows for sidestream drawoffs. MOB Maintain daily contract with the unit and provide technical support as needed HOB Objective Oxo, Butanol, Propanol A. J. Bacon______ Plans Support Oxo shutdown. Document Run IV Rh Accounting. 004145 WHM-177-78 -10- June 30, 1978 Objective_________ _________ MOB (Cost Reduction) _______________ j Plans Continue suppcjrt of CRC and Tech Center analytical work on Oxo reactor accountability. Raw Materials Savings (Cost Reduction) Purchase equipment for and begin activity testing on Oxo catalyst hydrocarbon extraction phases. File RFPA on this work. Raw Materials Savings (Cost Reduction) Carry out a heavy ends balance through Butyraldehyde purification. Pursue efficiency loss ideas in this area with Process Engineering. MOB (Raw Materials Savings) Support MEA reclaimer and inhibitor studies. Support BuOH material balance. MOB Maintain daily contact with the units and provide technical support as needed. MAINTENANCE OF TECHNOLOGY Staff Chemist - B. C. Kerr Objective_____________________ Maintenance of Technology ____________________ Plans 1. Continue program for abstracting technical reports and preparation of abstract cards. 2. Complete survey of abstract card users for suggestions concerning methods for improving the Maintenance of Technology program at Chemcel. 004146 WHM-177-78 -11- June 30, 1978 Objective MOB (Provide statistically accurate operations data to support Unit standard operating procedures.) _Plans 1. Issue report on statistical data obtained for Oxo Butyraldehyde Unit operations. 2. Compile the necessary data for a statistical evaluation of Butanol Unit operations. MOB (Cost Reduction) Provide technical support, as a Staff Chemist, as needed. Note: Depending upon the nature of suggestions and criticisms received during survey of the Maintenance of Technology program, it may be necessary to delete time to designing and implementing changes in the present system. : ANALYTICAL SECTION Group Leader - A. G. McGehee Objective MOB (Cost Reduction-Support of Lab Projects) Plans . 1. Continue analytical support of Laboratory Pilot Anerobic/aerobic stu dies and Rhodium Loss Accountability Program. 2. Implement method change on TMP moisture analysis to direct titration procedure (new Metrohm KF apparatus has facilities for handling solids) and develop precision data. 004147 WHM-177-78 Oblective -12- June 30, 1978 ; i 3. Determine viable solution to problem analyst^ of Iron (ppm) in Caustic Treated Formcel.^ Determine reliable chemical method technique or determine reliable accurate AA method of analysis. MOB (Support Plant Operations) MOB (Review QC Organization) Continue Group readiness and ability to contribute to day to day trouble shooting of Plant process and quality problems. Continue communication efforts through Unit Chemists. Investigate/evaluate various method of assumption of routine. Descriptive write-up by 8-78 and initiate trial 1 * in late third quarter. MOB (TDWR-EPA Compliance) Complete and implement revised and expanded EPA Quality Control Program in third quarter. Includes 10% spike and duplicate samples plus record keeping. Safety V 1. Continue emphasis on Laboratory safety and attendance at general > Safety Meetings. 2. Coordinate Vent Hood upgrading with Engineering. Estimated start in third quarter with completion in 30 days MOB (Maintain Analytical Technology) 1. Continue in process review and update of Chemcel GC methods. Twelve methods are under review. Expect to 004148 WHM-177-78 -13- June 30, 1978 Objective__________________ _________________ felans complete four by end of third quarter. 2. Complete precision data work on heavy metals by^AA. 3. Provide manpower as needed to Ditch and BOD outfall correlation study (TOC, COD, TOD). Expect completion by end of third quarter with report issued. MOB (Training) Continue Job rotation and cross section training with one rotation scheduled for 9-78 and one cross training scheduled for 7-78. MOB (Support Labs Effective Service to Plant) Support Plastics move to their netf Lab. Complete investigation and make final recommendations on Lab GC computer by 9-30-78. This includes - letter of rational. QUALITY ASSURANCE H. A. Ducote Objective_____________________ MOB (Maintain Quality of> Plant Products) ___________________ Plans Maintain -0.15Z legitiamte complaints during third quarter. 004149 WHM-177-78 _____________ Objective MOB (Cost Reduction) MOB (Cost Reduction) -1A- June 30, 1978 Plans Review quality control procedures on at least A products and make recommendations by end of third quarter. Review quality control organization and make recommendations for improvement by end of third quarter. i 004150