Document L6vXQOVQrj24QwMBKaLm0R13

inter-office memo TENNECO CHEMICALS, INC. TO Distribution At F ROM P. Scheiner At Burlington Subject WATER STRIPPER MEETING IN FLEMINGTON ESR - 1005 Date March 3, 1977 Copy TO D. C. Coldiron J. K. Jacob J. P. Sandstedt ^ E. V. Schenke C. G. Thompson File ESR - 1005 A meeting was held in Flemington on March 2, 1977 to discuss the proposed design for the Water Stripper, Attending the meeting were the following: J. T. Sweeney W, Fogelsanger R. Fanter W. Hughes E. Schwartz P. Scheiner 1. W, Hughes presented a Process Flowsheet (SK-1) for review, 2. Feed storage requirements can be substantially reduced due to the elimination of the water fill technique for vessel entry. W. Hughes to reevaluate feed storage requirements. 3. The feed filtration problem was discussed at length. The potential for PVA formation could have a major impact on unit performance. R. Fanter is to collect water samples for evaluation. 4. The source of cooling water for the overhead condenser was discussed. Mr. Sweeney stated that well water may not be available. Mr. Hughes will determine the net effect of using river water for cooling. 5. The Stripper will utilize approximately 250 #/HR of steam. No interest was expressed in using flash steam for, this service. 6. The Water Stripper Design will include a new Vacuum Pump (approximately 2 HP) and a new Booster Compressor. Mr. Sweeney stated that no addi tional capacity is available in the existing recovery compressors. 7. A nitrogen blanketing system will be used for the existing Barometric Tank and any new vinyl acetate receiver to be installed. This blanketing system will vent to the suction side of the new Vacuum Pump. 8. Mr. Hughes will review the possibility of eliminating the overhead receivers by dropping condensate directly to the existing Barometric Tank. 9. Another meeting will be set-up for next week to review the modified design. PS/ib P. Scheiner COLORITE 018268 C.AJM Aft T nn c Chemicals CAPITAL APPROPRIATION REQUEST SUMMARY business' group p^rs & Plastic^OCAT|QN Burlington, N. J. TITLE EPA/OSHA SEALS FOR PUMPS CAR NO 1 . TYPE 01 DIV. responsibility ASSET ACCT. AUTHORIZATION IS REQUESTED TO EXPEND NEW FIXED CAPITAL OF S 92,500.00 FOR: retrofit of existing 21 pumps on MVC service with approved double mechanical seals. Included is the pressurization equipt. and elec, warning & shut-down system. Please refer to attachments Tor further FINANCIAL SUMMARY AUTHORIZATION AMOUNT ITWOUSAND DOLLARS) FIRST YEAR AT CAPACITY REQUEST BUDGET ___ MtfS.10___; IS FIXED ASSETS $92.5 NET SALES - UNITS ( NOT APP jICABLE WORKING CAPITAL NIL " S/UNIT OTHER ASSETS NIL -DOLLARS NET OPERATING INCOME IBEFQRE TAXES) CASH FLOW . TOTAL NEW CAPITAL TRANSFERRED ASSETS TOTAL PROJECT CAPITAL $92.5 NIL $92.5 BREAKEVEN VOLUME NOT APP -ICABLE RETIRED ASSETS. CAJXR. NO. CADR ATTACHED QyES QnO fEXPLAIN) OTHER THAN R|K AVERAGE ROI, % PROFITABILITY NEW CAPITAL INCLUDING TRANSFERS NOT APPL [CABLE BUDGET TIME SCHEDULE MONTHS AFTER FINAL APPROVAL START OF EXPENDITURE COMPLETION OF EXPENDITURES. Mob Mob LEAVi BLAN DCF. % IN SERVICE DATE Mob PAYOUT, YRS PROJECT LIFE.Yrs 10 YfB STRATEGY PRODUCT t iur N/A RATI MR RETURN ON NET ASSETS EMPLOYED: BEFORE PROJECT* '%AFTER PROJECT . llAT CAPACITY) DIVISION APPROVALS DATE scT EPA " 01 POLLUTION 04 SAFETY/HEALTH 02 IHSURAHCE 05 % REPLACEMENT 03 A REPAIR OS PROJECT TYPE DEFENSIVE/ NON PROFIT COST REDUCTION NSW PRODUCT 07 08 OS EXPANSION 9# OTHi RAD ENKROV dticrlU STAFF REVIEW DATE CORPORATE APPROVALS date v.p./general manager DIRECTOR - FINANCE DIRECTOR-ENGINEERING DIRECTOR - PROJECTS president EXEC. VICE PRESIDENT BUSINESS DIRECTOR MGR.-GENERAL ENGINEERING VICE PRESIDENT DIRECTOR'MARKETING INDUSTRIAL HYGIENE VICE PRESIDENT DIRECTOR- OPERATIONS ENVIRONMENTAL PROTECT. j; *.4^=*=;----------- 3/7/77 WORKS/PLANT MANAGER p.R.ScaritO safety a loss ll C 3/7/77 prevent. A.C.SiegpJr\ ' * energy ' - 3/7/77 PREPARED By N. J. Quist project coordinator VICE PRESIDENT DIRECTORBUDGETS DIRECTOR-CORP. PLANNING 90-2513 8 -76 COLORITE 018269 C-A.R. Oat. 3/7/77 DIVISION/ BUSINESS GROUP ENVIRONMENTAL PROTECTION, ENERGY CONSERVATION osha; safety, loss prevention.toxic SUBSTANCES Polymers & Plastics LOCATION Burlington, N.J. title EPA/OSHA SEALS FOR PUMPS CAPITAL APPRO. No. Define the implications of each requirement altar discussing them with tha appropriate Division/Corporate Manager of aach discipline. ENVIRONMENTAL PROTECTION ENERGY CONSERVATION This project prevents loss of vinyl chloride into the atmosphere. This does not apply to this project. OSHA, SAFETY, LOSS PREVENTION This project is solely for the purpose of complying with regulations governing release of VCM to the environment, and the exposure of personnel to VCM. TOXIC SUBSTANCES Vinyl chloride. COLORITE 018270 C A C.A.R. 8 DIVISION / BUSINESS GROUP Tenneco Chemicals INVESTMENT & DEPRECIATION DETAILS Polymers & Plastics LOCATION Burlington, N.J. DATE 3/7/77 titi P EPA/OSHA SEALS FOR PUMPS ____________ CAPITAL APPROP. No. FIXED ASSETS: LAND LAND IMPROVEMENTS LEASEHOLD IMPROVEMENTS BUILDINGS MACHINERY & EQUIPMENT (MFG.) POLLUTION FACILITIES TRANSPORTATION EQUIPMENT OFFICE FURNITURE & EQUIPMENT LABORATORY FURNITURE & EQUIPMENT OTHER TOTAL NEW FIXED ASSETS TRANSFERRED ASSETS TOTAL PROJECT CAPITAL RETIREMENTS NEW CAPITAL (THOUSAND DOLLARS) DEPRECIATION RATE. % ANNUAL DEPRECIATION 00 $92.5 10 $9.25 $92.5 NIL $92.5 GROSS BOOK VALUE 0.0 10 $9.25 10 - $9.25 DEPRECIATION RATE. % ANNUAL DEPRECIATION 0.0 NET ANNUAL DEPRECIATION (A) - (B) $9.25 1st. Qtr. (THOUSAND DOLLARS) FIXED & WORKING CAPITAL EXPENDITURE ANALYSIS FIRST YEAR 2nd Yr. 3rd Yr. 4th Yr. 2nd. Qtr. 3rd. Qtr. 4th. Qtr. TOTAL 19iS_ 19____ 19____ TOTAL ACCOUNTS RECEIVABLE INVENTORIES LESS ACCOUNTS PAYABLE 0 15 30 TOTAL WORKING CAPITAL 00 TOTAL FIXED ADDITIONS 0 15 30 TOTAL FIXED & WORKING CAPITAL 000 CUMULATIVE 0 15 45 40 85 7.5 0 00 00 40 85 7.5 0 00 00 85 85 92.5 0 0 92.5 00 0 92.5 00 0 92.5 COLORITE 018271 90>2S22 9-76 f'14 tknnkco organ]cs 6 roj.YiT.KS divisio:; viscaxaly.y, i---' jer.scy su:r-r.rg- sheet TITLE, EPA/OSHA SEALS FOR POMPS 1 1 ITEM DESCRIPTION 1. Seal Assemblies 2. Pressure Pots UNIT COST $850 $180 SULCON- EST'D. --Ii&CI_____ _U5Q3____ 3. Nitrogen Regulators M . ... $125____ 4. Nitrogen Bottle Deposit 5. Pipe Fittings __________ JJS____ $ 80 6. Pressure Switch $140 7. T.iauid Level Sensor $180 8. Alarm-Shutdown Readout ,200__ 9. Mech. Labor 16MH x $18.75 -S3SQ____ 10. Shop O/Haul LAB. 8 x $10 .. $ 80 111. Misc. Elec. Fittings -$150 112. Conduit & Wire $250 13. Replacement Pump Parts__________________ Not Incl ided ,14. Elec. Labor $750 15. SDare Seals & Parts Land or Site Cost Freight & Allowances Construction Equipment for Job Hand Tools & Materials for Job i------ Security ServicesLegal Services Outside Technical Services (Drafting Sales Tax 5% on $53,000 Insurance State & Local Permits Temporary Office Help Office Materials 20 M/Davs ) $145 Engineering ($ 120/dsy/man) Travel A Subsistance Interest Escalation 1AM + Sub-contracts EST'D. * . EST'D. -jfri'AL $17,850 $ 3.780 -$ 2.625 $ 525 $ 1,680 J_2J>40 $ -3-780 $ 4.200 $ 3.360 $ 1.680 $ 3.150 $ 5.250 $15,750 S 5,000 $ 2.900 $ 2.650 SUB-TOTAL: CONTINGENCY: 20Z $77,120 * $15,380 SUB-TOTAL: OVERHEAD: GRAND TOTAL: ESTIVATE NO - REVISION HO il L * *' i Ii *A-LiM---- 3t,,--Quiet------------------------------- ------ REMARKS: 3/3/77 F A EH///XT. NO.: Cl ASS: (X) B -t] 07, - 57, +25*/. -107, $92,500 -- $92,500 COLORITE 018272 t" XKO. 0^ r DATE date SUBJECT,. LYRICAL.........^aCRttz.lVIAi-iL. sheet no. ... ..... FOR .......... OSH A SEALS JOB NO. OF ALARM tt n START-STOP BUTTON o o MOTOR CONTROL 1_ ^ -j T I I LOW I PRESS. SWITCH i Il il I "^fLE1 LVOWEL Ii i SWITCH I I i i I \ NITROGE BOTTLE Mv'C PUMP COLORXTE 018273 CAPITAL APPROPRIATIONS REQUEST TITLE: EPA/OSHA SEALS FOR PUMPS March 7, 1977 I. NEED FOR PROJECT The existing pumps handling vinyl chloride in liquid form are fitted with mechanical seals of the "single" design. The normal leakage through single seals ranges between 100 & l.OOOppm, whereas the OSHA limit is lOppm. To achieve this low level, the pumps must be retrofitted with "double" mechanical seals, complete with pressured barrier fluid supplied by an individual pressure pot. II. SCOPE OF PROJECT A total of 21 pumps require retrofit, using seals that have been tested and approved by Engineering for compliance with the OSHA limits. The following list of pumps is covered: Item it Description Quantity 41202 Mononar Transfer--Goulds 1 41206 Monomer Transfer--Goulds 1 41205 Vaporizer Feed--Peerles 1 41207 Vaporizer Feed--Goulds 1 41306 Copolymer Reactor Charge--Goulds 2 41340 41103 41335 Copoly. Recovered Monomer Recirc.-- Goulds Copoly. Recovered Monomer Charge-- Goulds PVC Recovered Monomer Charge--Goulds 1 1 1 41323 Plast. Recovered Monomer Charge-- Goulds 1 41329 PVC Monomer Charge--Goulds 1 41326 Plast. "A" Fume Scrubber--Goulds 1 41828 Plast. "B" Fume Scrubber--Goulds 1 41804 Homogenization Feed "A"--Goulds 1 41805 Homogenizing "A"--Si-Hi 3 41825 Homogenization Feed "B"--Goulds 1 41826 Homogenizing "B"--Sl-Hi 3 COLORITE 018274 CAR*. EPA/OSHA SEALS FOR PUMPS Page 2 March 7, 1977 II. III. IV. V. SCOPE OF PROJECT (Continued) In addition to the new seals themselves, the following auxiliaries form part of the installation: (1) Pressure pot, approx. 3 gallon capacity for use with glycol/ glycerine/water barrier fluid and nitrogen pad. (2) Nitrogen bottle w/regulator, or equivalent supply, to apply controlled pressure to the pressure pot. (3) Pressure switch and liquid level sensor, both mounted on the pressure pot, to shut down the pump in event of loss of either nitrogen pressure or barrier fluid level. (4) Alarm system tied to the pressure switch and to the liquid level sensor above, to alert the operators to the failure or impending failure, and thus minimize the number and size of monomer releases from failed seals. The alarm will be in the form of a running light and located in the operators* area. ALTERNATIVES No alternative to the use of double seals is known at this time. PROJECT POSTPONABLE NO. PROJECT TIMING Compliance with VCM Regulations require that purchasing of the retrofit seals begin on April 1, 1977, and that the project be complete on February 1, 1978. N. J. Quist NJQ:pjd 3/7/77 COLORITE 018275