team Generating Units
Boiler Settings for Riley Steam Generating Units ate designed, engineered and fabricated ^ourc permanent air and gas tightness at all ratings and pressures. Materials used and ggtfexh fabrication employed are selected to meet the maximum in operating requirements j |,, keep maintenance costs at a minimum.
Low R.idiit i o r. Loss Adequate thickness of top quality insulating
materials used in Riley Settings insure against radiation loss and provide cool external surfaces. Modern in Apc^r.'nc:
Riley is a leader in establishing trends in functional setting design. The appealing, trim appearance of Riley Settings inspires good house keeping and maintenance practices among oper ating personnel.
900,000#/hr., 1300 PSIG, 950 F Riley Steam Generating Unit in. (tailed ol Columbia l> Southern Ohio Electric Co., Columbui, Ohio
3
Co
-V'.ndjrd Roof Design Roof sections of Riley Steel Clad In*
sulated Settings rest directly upon the roof tubes of the boilers. The standard roof section utilizes a layer of heavy interlock ing or "T" tile, covered with a layer of high temperature block insulation, and a layer of mineral wool felt compressed by the steel roof casing.
Penthouse Roof Design With some boiler designs, a portion or
all of the boiler roof cubes are enclosed within a penthouse enclosure of double panel insulated construction. When roof rubes are of tangent spacing, expanded metal is tack welded to cubing to secure an adequate thickness of plastic refractory* Roof at side wall junctions is sealed shown at right with refractory tile secured to roof tubes by studs and anchor rods. When roof rubes are on wide spacing, interlocking or "T" tile are used. The die are held in position by expanded metal which, in turn, is secured by anchor rod assemblies welded to studs attached to roof tubes on approximately 18" centers. An adequate thickness of plastic refractory is applied over the tile, anchor rods and expanded metal to assure permanent gas dghtness.
f
jf RILEY steel clad Insulated settings for !^ibe supported and
iteel supported units
TJ;;-
^ ror Tangent bos
With tube supported units, when 3i/4" O.D. tubes are tan gent spaced on 3 5/16" centers, expanded metal is tack welded to the outside of the waterwall rubes to secure the high tem perature plastic refractory; high temperature block insula tion is then applied followed by mineral wool felt which is compressed between the block insulation and steel casing. Sturdv tube anchor assemblies maintain permanent tube align ment and spacing. With struc tural steel supported units, con necting plates (A) are slotted to allow for expansion of set ting walls.
Waiis rot Wide Spaced Tubes
When tubes are spaced on other than tangent spacing, the 3l/j" O.D. tubes are backed with heavy interlocking tile. High temperature block insula tion is then applied and mineral wool felt is compressed between block insulation and steel cas ing. Tube anchor assemblies bolted to buckstav members keep tubes aligned, and pro vide support for refractory.
With structural steel sup ported units connecting plates or angle brackets o" are slotted for expansion.
5
Refractory Supports
Refractory and insulation used in ] Settings are sectionally supported a] secured to prevent shifting or settling .1 voids and hot spots arc thus eliminate Heat-resisting tile support brackets, shown, are bolted to reinforced buckstai]
Single Header Hopper Bottom Units
The from and rear slopes of the hopper *c lower side w
Single Header Hopper Bottom Units anSf"" are covered
cinuation of the front and rear furnace wiufvin|; tile with
are covered with the same materials as
-uigles hole
walls; plastic refractory or interlockings! ^ 'ide wall n
backed by a layer of block insulation with^'n^U tubes. I
wool felt compressed between the blodcflV411^ back of til
tion and steel casing. Steel lugs or bofl ' mineral wool
heads welded to cubes secure buckstays and^^ *`l casing.
6
1:1
rl
/ ;up:;v,. . j:dc Y^Jlis The side walls of extra wide steam generators are structural steel supported and spaced away from tubes to allow clearance between the side walls and boiler or waterwall tubes for longitudinal expansion of drums and headers. Tile support brackets and anchors are bolted to reinforced buckstays and structural uprights. The complete assembly is imbedded in insulation and covered by steel panels.
lower side walls of the hopper s-iMin nre covered with cored inter' 'ile with retainer bolts and ^r*m -ingles holding those portions 4 'hi >idi* wall not secured by side *cr\\aii tubes. Block insulation is eM^Med back of tile and is secured by v m,neral wool felt compressed by
wie casing.
`f
Casing panels are of hcjsj No. 10 gUg' place and are fabricated with flanges oa ill sides. Continuous pressure tight weld panel flanges and joints throughout the setting assures permanent atr and gas ti Panel assemblies arc fastened and postripclamps prior to welding. Sturdy flats I
between the horizontal buckstays reinfo' vertical panel joints. Careful shop fabmakes installation quick, easy and accurat
. tu. u.ci'i b\ these tabulations Rile, if .ulcquateh insulated against r.icliut. throughout the setting, unit r sustained .md comfortable out^ .-v ; _ uuiperaturcs arc assured. Tight . Ul lointa present air infiltration and ^ or combustion gas and dust.
FURNACE SIDE WALL
A TUBE SPACING 3V lo A'i."
Outside Casing Temp.
105 F
B TUBE SPACING 41to 61V
no f
Heat Loss BTU/Sq.Ft./Hr.
104.2
122
FURNACE SIDE WALL fl* Fs; -fmperature Ovti'de Casing Temperature
c Tubes Spaced on 6" Centers
1600 F
2000 F
2200 F
103 F
109 F
111 F
D Tubes Spaced on 8'/a" Centers
1600 F
2000 F
2200 F
104 F
110 F
1 12 F
Figures are based on 70 F room temperature and 10 MPH air current.
H37.IH?Ain<l
9
< Jsinj; nni|H muff rt.idin^s shorn) ibosi wire dhuinci! fruni .1 JiS.OOO lbs pir hum KiIt \ Sii-.tm (.iiur.inn^ l nil installed in .1 pulp ,iml p.i|ur mill lutaitd in chi' nonhcjst.
9
Wherever insulated casing joins headers in Riley tube supported and steel supported units, special metal to metal seals are employed to prevent leakage of gas and air.
Header flats are welded to waterwall headers prior to stress relieving. Scaling plates have slotted holes positioned 90 to the slotted holes in the header flats to permit free expansion movement. An asbestos gasket is used between seal place and header flat to complete the gas -ir ' > tight connection. No stresses are imposed on casing or setting materials by expansion of pressure parts.
Such header seals arc not required with units for pressurized furnace operation. Equal expansion of the casing and pressure parts at equal temperature eliminates the use of header seals. Panel flanges are attached directly to header flats by continuous seal welding.
When specified, removable insulated cover plates are provided for headers. The cover plates, in easy to handle sizes, are insulated with asbestos millboard attached on inside of cover. Anchor pins arc used to secure the cover plates in posicion.
Drum End Seals
jl cml supported Riley units (above), drum effectively seal against gas leakage and air Seal rings and clamps are designed for
m lateral jnd longitudinal drum movement. Seal cements with insulated retaining rings arc m pnM'ion at drum ends. Clamp segments
Med ct> c.iwng sandwich the seal ring between steel ind damp segments. As shown in illustration
- Ivrwccn outside of the drum and insulation mao|; ru\g is packed with strands of asbestos rope - irtn j permanent seal. The insulation retainer
iiwi jnchor\ lacing wire used to secure the drum A hejvy clearance ring, welded to inside
- supports setting insulation and refractory.
With tube supported Riley units lbelow), a cir cular band is attached at drum ends by continuous welding prior to final stress relieving of drum. The band provides a base for field welding rhe seal ring segments. As shown in illustration (below), an asbestos gasket is used between the seal ring and steel casing. Closely spaced tap bolts secure insulation retaining clips, steel casing and gasket to the seal ring. Since expansion of pressure parts and setting with Riley tube supported units is equalized, a per manent seal at drum ends is maintained.
This is one of two 165,000#/hr, 975 Psig, 975 F Riley Steom Generating Units in stalled for Howaiion Commercial and Sugar Co., Maui, T. H. A third Riley Unit will have a capacity of 200,000pounds per hour.
Here is a 250,000#/hr. 1000 Psig, 830 F Riley Steam Generating Unit installed for Gaylord Container Corp., Bogalusa, Louisiana. Three other Riley Units are in operation at this plant.
View of a- 125,000#/hr. 725 Psig, 830 F Riley Steam Generating Unit installed for Superior Water, Light and Power Co., Supe rior, Wisconsin.
|41 Li EV }4ll *2{/eat&e v
Outdoor Settings
Kile' outdoor type steam generating
jnii' trK 111 Successful operation in various jtm.iu1" throughout the world. They include all ,jp.icmcs and methods of firing. Advanced opermn*: and maintenance procedures together with nlcx^u.uc protection of auxiliaries assure efficient x-rfomunce and smooth functioning of the
n -I.i u. The design and construction of Riley
indoor setting* are suitable tor outdoor installa tions with but small additional *.ost to prowdc fur drainage and disposal of ram water.
When necessarv, because of plant location, an enclosure is installed n\cr the firing aisle to protect operating personnel. Building costs arcreduced to a minimum or eliminated entireh.
One of two l,23<7*!i00#/hr. 2125 Psig, 1005/1005 p Riley Reheat Steam Generating Units installed for Houston lighting and Power Co., Houston, Teios. Nine other Riley Units are in operation for Houston lighting & Power Co.
p Here is a 425,000#/hr. 1375 Psig, 960 F Riley ^Steom Generating Unit installed for Southern .^'Nevada^Power Co., Las Vegas, Nevoda. *
Settings for Pressurized
Furnaces
Riley Settings constructed for pressurized fur nace operation are equipped with strong hori zontal structural steel bands encircling the vertical wails. They are designed to withstand maximum possible internal pressures without deflection. Structural channels welded to furnace wall tubes provide supports for pressure skin casing panels. Filler rods arc used to insure good contact between tubes and casing supporting channels.
The furnace wall rubes are externally covered by heavy gauge expanded,^'*tal1 tack welded to rubes, supporting a special high heat conducting refractory to fill all voids between tubes and pres sure skin casing and to insure intimate contact and equal heating of casing. The casing panels of No. 10 gauge steel are welded along their flanges to each other and to the supporting channels. Note: Pressure skin casing is not welded or otherwise attached directly to tubes.
Following completion, to check for complete tightness of pressure skin casing and welding of casing /cunts, the entire setting is subjected to a pneumatic pressure test equal to maximum fan pressure. The external insulation consisting of two layers of block, metal reinforced pUster and weather protecting coating or lagging is then applied.
Where setting wall tubes are of wider than tangent spacing they are finned and backed by special shapes of refractory tile between tubes and skin casing.
In sections of Riley units where cubes are wide spaced, finned tubes are used to secure and retain setting tile. Casing and insulation material used for this area are the same as used with furnace walls.
When so specified, metal lagging is applied to the setting for outdoor installations. If metal lagging is used, the coats of insulating cement and emulsion are omitted.
14
Paastie
jottings
For Indoor and Outdoor Units
n-tnm:* for indoor or outdoor service are
JfuJ constructed for heavy duty service
_Kt bttlr "f nn maintenance other than periodic
t'('-iicd furnace waterwalls have studs n> ihe tubes oti ii^--ontal and vertical
n ,,f .tpproximately eighteen inches. The #rf coxcred with expanded metal tack welded p iH of the tubes, Light weight castable ^jlliUT,,r iim>hcd to a smooth flat surface is
io the outside face of the tubes and is block insulation; then, another sheet
.tpimlul metal is applied. Large size washers -mi nuts are used with the studs to secure fe sink insulation which is covered with insulat* -i MiUir I'he finish coat of insulating plaster * -mi hii in panels to complete the setting.
% hrn wide cube spacing of boiler and furnace *.. i* employed with this type of setting, studs " 'tided to the tubes on horizontal and vertical ""m of approximately eighteen inches. Inter-
iiic i5 [hen secured with large size washers '|Hcd nuts. A layer of block insulation covered i laser of mineral wool felt is secured with nfunded metal by washers and speed nuts. A
coat of insulation plaster is applied over the niunded metal and is covered with a finish coat * `^lacing cement scored off in panels.
(,n units for out-of-door service a tack coat of 's applied over the insulating plaster; this
ihin tenered with glassfab and a finish coat u mastic
15
0
A PARTIAL LIST OF RILEY STEAM GENERATING UNIT INSTALLATIONS
The Flmtkote Co.. Little ferry. N. J Cetinese Corp. ol America.. Rock Hil', S C Central Louisiana Electric Cl.. Baldwin, la Kennecott Copper Corp., Hayden. Arizona Swift t Company, i SI Louis, Illinois U. S. Rubber Co.. Misnawaka, Indiana Utah Power l light Co . Salt Lane City, Utah Bendix Aviation Corp., Soutti Bend. Indiana The Rath Packini Co.. Waterloo, Iowa Gaylord Container Corp., Boga'usa. La Central Illinois light Co., E Peoria. Illinois SL Croix Paper Co., Wood'and. Me. Bird l Sons. Inc. E Walpole. Mass. Carbide 1 Carbon Chemicals Co. Texas City. Texas The Champion Paper & Fibre Co.. Canlon. N C. Houston Lighting & Power Co., Houston, Texas Utah-ldaho Sugar Co.. Moses Lake, Wash Campbell Soup Co., Chicago, Illinois United Slates Steel Corp., Chicago, Illinois MontanaOakota Utilities Co., Mandan. N. D Northern Paper Mills, Green Bay, Wise Dow Chemical Co., Freeport, Texas Republic Steel Corp., Cleveland, Ohio
lowa-lllmois Gas t Electric Co. owa City. Iowa Carbide l Carbon Chemicals Co., Whiling. Indiana Louisiana Power & Light Co., Sterlmgton, La Goodyear Tire l Rubber Co., Gacsden. Ala Esso Standard Oil Co.. Bayway. N J Western Electric Co., Chicago, Illinois Public Service Co. of Indiana, New Albany, Indiana Kellogg Company, Battle Creek. Mich Columbia Southern Chemical Co..
New Martinsville, W. Va.
Philadelphia Electric Co.. Philadelphia. Pa Cities Service Co., East Chicago. Indiana Hooker Electrochemical Co.. Tacoma. Wash Alhs-Chalmers Mfg. Co, Milwaukee Wise Texas Electric Service Co., Fort Worth, Texas Commercial Solvents Corp., Sterhngton. La. White Pine Capper Co., White Pme, Mich Waldorf Paper Products Co., SI. Paul, Minn Rayomer Incorporated, Hoquiam, Wash Continental Can Co., Hopewell, Va Rock Hill Printing 1 Finishing Co.. Rock Hill, S C Oallas Power 1 Light Co., Oalias, Texas Acme Steel Co., Rwerdale, Illinois National Brewing Co., Baltimore. Md American Viscose Curp., Marcus Hook, Pa The Carloch Packing Co., Palmyra. N Y Southern Nevada Power Co., Las Vegas, Nev. Owens-Corning Fiberglas Corp., Newark, Ohio Pure Oil Co., Heath, Ohio Cluett-Peabody l Co., Inc., Waterford, N. Y. tones l Laughlm Steel Corp.. Pittsburgh, Pa Com Belt Power Coop., Humboldt, Iowa Standard Oil Co., ol Cal., Richmond, Cal.
Colorado Fuel 1 Iron Co., Pueblo, Colo Winchester Repeating Arms Co., New Haven, Conn Northern Slates Power Co.. Granite Falls, Minn Whippany Paper Board Co., Whippany, N J Beechnut Packing Co.. Canajorhane, N Y E. I du Poit de Nemours t Co., Niagara Falls, N South Carolina Electric l Gas Co.. Charleston, S 1. S. Abercrombie, Sweeney, Texas The Ohio Oil Co., Robinson, Illinois
RILEY
WORCESTER, MASSACHUSETTS
Soles Olticei Worcester, New York, Philadelphia, Buffalo, Pittsburgh, Cleveland, Detroit, Chicogo, Cincinnati, Chorlotle, New Orleans, Ationla. St Louis, Kansas City. St Paul, Houston. Denver (Englewood i
Salt Lake City, Los Angeles, Son Francisco, Portland Seattle
Printed in U- S. A. 5M 5 57