Document KzzR10ydEKLJRRowzvmkzm26

I tlMTHRIMAL CORRESPONDENCE UNION CARBIDE CORPORATION TECHNICAL CENTER P.O. BOX 8361, SOUTH CHARLESTON. WV 253D3 TdINbTMH. E. Rucker Dw3Dn 512/2009 Location Area Copy to B< H> Avashia, M.D. - 512/23 J. W. Barna - 2009/6 W. L. Browning - 2009 R. E. Coyner - 2009 C. P. Maxwell - 701/2 B. R. McMakin - 2009 Date June 12, 1987 0n9",aCl''9 Depc- EM&TS - HS&EA Area Industrial Hygiene Sub,ecc Asbestos Exposure Monitoring A' Attached are the results of asbestos exposure monitoring for three days on insulators at the Institute Plant while removing asbestos on a 3-inch steam line and a 4-inch product line at the #1 dock area in an enclosure. The area enclosed was 5.5 x 6.5 x 200 feet or 7150 ft^. HEPA exhaust was 120,000 ft^ per hour which is equivalent to 16 air changes per hour. The area enclosed was along the roadway and the dike wall between the #1 and #2 docks. The area was barricaded while enclosure was in place. Seven out of eight personal exposure samples exceeded the 0.2 fiber/cc permissible exposure level standard and the eighth exceeded the 0.1 fiber/cc action level standard. We encourage you to use supplied air respirators as much as possible in the asbestos abatement procedures. Please communicate to your employees the need for the utmost care and precaution while removing asbestos. Employees wore two pair of coveralls, headcovers, boots, gloves and AO R57-A half-face HEPA cartridge respirators. No street clothes were worn. They showered before lunch and at the end of the workday before leaving plant. UCC 024443 ASBESTOS EXPOSURE MONITORING -2- June 12, 1987 Please inform S. R. Erskine, B. J. Agosti, P. K. Snodgrass and C. B. Clendenin of their exposure monitoring results as soon as possible. Have them sign and date this report and return to M. A. Patel at Building 701-330. If you have any questions or if we can be of further assistance, please call us on extension 4779 or 3750. WORK BY: APPROVED BY: Attachment VES:HJK:MAP:rab 2384P Manhar Ik-. Patel UCC 024444