Document Kzy4D4Dw8Oy0bGOv24Bqz6YQx

Ann iston J. T. Bell J. L. Corder A. G. Hill G. L. Jessee L. C. Lahman J. C. Landwehr H. E. Schulte W. F. Taffee General Offices H. C. Carder D. Danna (5) M. W. Farrar P. B. Hodges F. J. Holzapfel D. B. Hosmer R. E. Howard W. K. Johnson C. F. Luecke W. R. Richard W. R. Robirds C. W. Roos J. R. Savage J. E. Smith J. A. Stephens South Second St. P. 0. DeGanno Other Locations A. H. Forsten Alvin, Texas D. w. Jackson - W.G.K. COMPANY CONFIDENTIAL Anniston Plant TECHNICAL SERVICES DEPARTMENT MONTHLY REPORT Summary AUGUST 1970 Month COST IMPROVEMENT RESULTS Est. Act. Target % of Target $40,355 $53,015 76% YTD $558,347 $497,605 112% Organic Division The Aroclor Process Sump was put into service on 8/12/70 bettering the revised startup date of 9/1/70 by almost three weeks and the original date (10/15/70) by two months. The initial phase of the Aroclor waste effluent carbon treatment studies is complete. In the 13 day pilot run, initial concentrations of 1000 - 8000 ppb Aroclor in waste water were reduced to a range of 0-15 ppb upon passing through the series of 1" diameter packed carbon beds at an average flow rate of 25 cc/min. Over 99% of Aroclor removal occurred in the 6" deep carbon prefilter. This unusual re duction is believed to be due to the filtration of solids on which Aroclor was adsorbed. The study is presently being divided into two phases: (1) feasibility studies for con tinuous solids (with Aroclor) removal from limestone pit effluent, and (2) carbon adsorption from the clear stream at the Aroclor sump. Redesigning of Aroclor chlorinator spargers will give better chlorine distribution, resulting in reduction of free chlorine in the off gas. This is a potential cost improvement of $31,000 in chlorine usage and is an integral part of AroclorHC1 pollution abatement. 0SW 014938 *n -i: ' CONFIDENTIAL INFORMATION "This document contains confidential intormetion which is the property of Monsonto Compeny. Only those portions of the document reinvent to e duly ewthoriied individuei's need to know mey be excerpted for him. The report must not be sent outside the Compeny without written epprovei end the euthorixed recipient is eccounteble for its sefe keeping, excerpting or otherwise disclosing of its contents end for its proper dlsposel. The docu- ment remeins the property of Monsento Compeny end shell be returned within two months to its euthor, except upon tpeciel euthorixetion to hold for e longer period." * STLCOPCB4003314 > Organic Division - continued 2. The joint Research-PR&D study on Montar 9 is progressing on schedule. Twelve gallons of M-9, distilled by Organic Research, were used to prepare samples of high quaterphenyl (up to 50%) material hydrogenated 30%, to 100%. These samples will be used for market evaluation. EDC is 9-25-70. The low color 5460 plant test is scheduled for the week of 9/7/70. This test is aimed at reducing the color to 1.25 NPA. The delayed-promoter injection phase of the Polyphenyl Pilot Studies has been delayed by a burned-out reactor heater and then a coked reactor. The new reactor has now been installed and was started up on 8/31. Construction for the expansion of HB-40 (CEA 1482) is approximately two weeks ahead of schedule with startup tentatively scheduled the week of November 16. Revised design and estimate for Bulk Plasticizer Terminal was reviewed with J. E. Smith. The following HC1 recovery improvement work has been completed or is in progress. 1. Pressure by-pass loop installed by CED on CEA 2080 was relocated, calibrated and is presently working well, eliminating sewering of acid through this line. 2. Drain taps were installed on carbon towers to allow batch pretreating of fresh charges to eliminate iron. Previously total production was sewered during pre treatment. An HC1 fume collection/scrubbing system for docks and storage tanks has been pro posed. The project will significantly reduce water load to sewer and subsequent treatment for PCB removal. PNP had a very good production month (1,862,860#) with excellent on-stream time (93.7%). Agricultural Division Tests of Process Amendments "Chlorination in the Presence of Acetone" and "Hydrocarbon Dilution of Still Residue" was restarted on 8/10/70. The residue hold tank temperature was maintained at 60-70C., compared to 50-60C. normally. Revised operating conditions were not successful in preventing residue from precipitating from the diesel fuel. Higher temperatures apparently caused the formation of some very large balls in the hold tank and the test was stopped. The "Hydrocarbon Dilution" amendment was then tested independently. Results to date indicate increased yields and that the diesel fuel is a good residue pump-out aid. No problems have been experienced in the hold tank or in burning the residue as yet. Experimental operation of #1 Parathion intermediate still verified predictions from process analysis of higher yields from controlling the profile of steam input with time. An average improvement of 200# per batch was achieved, worth $35,000 on methyl parathion at 1971 rates. DSW 014939 STLCOPCB4003315 ) 3 Quality Control The Plant Quality Score was 87.9, up 1.9 from July, with a YTD score of 86.0 against a target of 95.0. Improved Aroclor 1242 uniformity and PNP quality were proved. Pollution Control Monsanto has been dropped as a defendant in the class action suit by Bass Anglers Sportsman Society against over 200 industries in the State of Alabama. Aroclor in plant effluent showed a sharp increase in August, concurrent with high solids out of the limestone pit. Work has begun on an interim HC1 neutralization facility so that the existing pit can be decontaminated and improved without interruption in waste water treatment. :kd DSW OM'*0 STLCOPCB4003316 ) 4. PLANT LABORATORIES ANALYTICAL AND QUALITY CONTROL - S. 0. Kemp Complaint Report Quality Number ATL-18-P NY-51-P Material Muriatic Acid Santowax R Customer F. H. Ross Raybestos-Manhattan Reasoi Assay Lumps YTD Quality Complaints/100 Shipments 0.32 Target 0.20 DSW 01494i STLCOPCB4003317 ) 5. COMMUNITY RELATIONS, PERSONNEL, RECRUITING AND DEVELOPMENT Community Relations ! J. C. Landwehr attended the Air Water Resources Sub Committee meeting in Birmingham, Alabama on August 14. 2. Dr. Lowell Taylor and Group from Auburn University visited to discuss recruiting and Co-Op program with Auburn University on August 19. Personnel Development 1. S. 0. Kemp spent August 27 and 28 in St. Louis on special training for PCB analysis on Aroclor 5460 with E. M. Emery at Organic Research. 2. J. T. Bell and J. L. Brown attended Coaching and Appraisal course at Holiday Inn - Oxford on August 13 and 14. 3. T. W. Lawrence transferred from Technical Services to position of Plant Safety Engineer on August 31, 1970. Visitors 1. J. E. Smith, St. Louis, visited concerning Bulk Plasticizers Terminal - August 4 and 5. 2. J. R. Savage, St. Louis, visited to review Cost Standards - August 17. DSW 014942 STLCOPCB4003318 ) 1970 DISTRIBUTION OF TIME BY TECHNICAL SERVICE EXISTING PRODUCT TECHNOLOGY IMPROVEMENT NEW PRODUCT EVALUATIONS MAJOR PROJECT SUPPORT PROCESS CONTROL IMPROVEMENT . PROJECT DESIGN PROCESS MAINTENANCE 30 20 10 10 0 TECHNOLOGY AND TECHNICAL SUPPORT TECHNICAL MANPOWER PLANT IMPROVEMENT PROGRAM REAL ESTATE MANAGEMENT 10 0 nc<TJ sdx) uns 2 <a ><T1j nc3 3 O3' < cu C0O) 4oJ o z>0 aaj a DSW 014943 STLCOPCB4003319 ) ORGANIC DIVISION 1970TSD COST IMPROVEMENT FUNCTIONAL FLUIDS TAR EST ACT JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Disposal of Licuid Montar "3 Aroclor Still New Burners TAR EST ACT TAR EST ACT 1500 600 600 108Q Q a 1080 .0 C 1500 500 500 1080 0 0 1080 0 0 1080 1080 1080 0 ' ---- O' 0 1080 1080 1080 #2 Still Entrainment Separator - 1242 Distillatio ! Productivity TAR EST ACT TAR EST ACT 3000 3000 -0 0 isod c 1500 100 1500 1500 1000 1520 1500 2565 125tn0o0a' 150C 1500 1500 c 100 1000 1520 2565 1500 TAR EST ACT TAR PLASTICIZERS EST ACT Flaking & Drum ming Facilities Headcount Solid Aroclor Instrumentation TAR EST ACT TAR EST ACT TAR Sandvik Belt EST ACT Add Tray Strip ping Sections to TAR EST Santowax ACT TAR Cl2 Bulk Handling Facilit . les EST ACT Solid Aroclor Expansion TAR EST ACT Chlorinator Sack Pressure TAR EST ACT 3000 3000 3000 ?.nno 3500 3500 3000 2000 1000 1000 3000 2000 1000 TOM 3000 2000 1000 1000 3750 0 3750 3750 3750 3750 3750 3750 0 ------- O' f" a O' 0 00 3750 2250 2250 2250 2250 2250 00 0 4580 4530 4580 4580 4580 4580 4580 C 00 00 000 0 4580 2000 2000 2000 3550 1950 3440 . 3550 3050 344C 30000 5000C 4950C 5000C 1000C 36000 24000 20000 17900 5190C 5590C 1050C 38500 23500 24700 30000 360 360 360 3750 2250 4580j 1 1 360 TAR EST ACT TAR EST ACT TAR EST ACT TAR -- --......... EST -- a n i z. a L.L ACT STLCOPCB4003320 ) ' ORGANIC DIVISION 1970 TSDCOST IMPROVEMENT FUNCTIONAL FLUIDS & PLASTICIZERS TAR EST ACT JAN FEB' MAR APR MAY JUN JUL AUG SEP OCT NOV DEC (AFF ECTIN 3 BOT I BUS] NESS GROUP S) Aroclor Ware house Reduced Headcount TAR __LQQQ- 1000 EST 1000 1000 ACT 1000 1000 1000 10Q0 1000 Improved Santowax Yield TAR EST ACT 4000 4000 4000 4000 4.QQ.Q 4000 5900 2800 5800 4000 97C 663C 4450 2800 5800 4000 97C 4Q0Q 4Q0Q HB-40 Reduce Nickel Catalyst Usaqe Substitution of Santowax C for TAR EST ACT TAR EST 1160 700 700 700 700 1330 - 525 1230 425 1335 525 2080 ' 565 700 0 ( 700 C 700 20Q0cj 2000( Santowax R ACT TAR EST ACT GENERAL CHEMICALS TAR EST ACT (BIP HENYL PNP HCl 1 , Biphenvl Cool TAR ing Water EST Treatment ACT PNP TAR Modify Acidifies ' EST Dump valve Svste m ACT Install Entrain ment Separator Prndnctinn Optimize Reactoi Variables-PNP TAR EST ACT TAR EST ACT TAR Re-use Well Water EST ACT 600 670 670 3150 520 520 600 680 680 600 ._600_ 580 600 580 600 625 625 600 600 67C 440 675 440 62E 625 625 625 600 290 29C 625 625 625 625 625 625 625 625 625 5500 5500 5500 5500 00 0 5500 5500' 3150 3150 1277 2164 3016 2164 463f 4630 12: 1604 12' ' 1605 4630 4630 0 1525 0 1525 4630 1780 463 0 4630 5Q0 4630 _.5QQ 4630 : S0Q ) l Untargeted PNCB Heel Credits HC1 HCT Catch Tank & Coalescer 150 M Gallon Storage Tank TAR EST ACT TAR EST ACT TAR EST ACT 5700 2500 2500 4300 4300 4300 2275 563 3078 1650 920 2275 563 3078 1650 920 5700 5700 5700 5700 7560 9000 1030C 6545 7560 9000 1030C 6545 4300 "4T00 4300 4300 4300 4300 4300 4300 4300 4300 4300 4300 4300 4300 4300 410 410 550 HCl Instrumentation TAR EST ACT TAR 1875 4000 1230C 4000 1230C 1875 1875 1875 1875 1875 1975 1875 3440 6500 3940 8160 3440 6500 3940 -1975, EST ACT TAR ---- - - -- EST ACT -- DSW --[_ 014945 _ 1---------- !---------- ---------- STLCOPCB4003321 ) ORGANIC DIVISION 1970 TSD COST IMPROVEMENT PLANT WIDE Improve Plant Power Factor Central Air Compressor Chlorine Plant Shutdown RTN Cooling Water to Tower Cooling Con veyor - P;^5 Total Organic Month - M $ Total Organic YTD - M $ JAN TAR FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC EST ACT TAR EST ACT TAR 950 EST ACT 900 940 TAR EST ACT TAR 19900 EST 19900 ACT 19900 950 333 914 950 "STS' 840 950 "790 790 19900 19900 19900 19900 19900 19900 19900 19900 19900 950 "S77 810 9950 9950 9950 950 "STS 845 1000 1000 1000 TAR EST ACT 25 25 25 25 25 TAR EST ACT TAR EST ACT TAR EST ACT TAR EST ACT 40.6 36.291 36.33 40.6 36.29 36.33 72.1 947 54 99.86 112.7 130.9 136.2 96.88 58.07 44.62 27.97 34.12 30.52 30.88 103.6 70.39 74.61 FO:5S- TOITT T77SS 109.1 70.89 77.98 42.22 35.03 209.6 267.6 312.3 340.2 374.3 404.9 435.7 239.8 31377 390.8 [437.7 467.7 510.0 245.3 316.2 394.1 437.3 472.4 64.68 500.4 51.68 552.1 51.68 603.8 DSW 014946 STLCOPCB4003322 ) AG DIVISION 1970 TSD COST IMPROVEMENT PARATHTDNS TAR EST JAN - FEB MAR APR .1 MAY JUN JUL AUG 1 SEP OCT NOV ACT Replace #3 Chlorinator TAR EST ACT 4860 4860 3500 2340 3500 0 0 3500 0 0 3500 0 Improve Cl_Still Yields TAR EST ACT 3000 0 0 3000 0 .0 3000 0 0 3000 0 3000 3000 Increase Chlor- TAR inator Coolings EST 8500 8500 0 8500 ACT Acetone Recovery Chlorine Unloading TAR EST ACT TAR EST ACT 2800 1957 1957 2250 3634 3634 2800 1069 1069 2250 4237 4237 2800 1225 1225 2250 3350 3350 2800 1935 1935 3200 1406 1406 2800 130 130 3200 3431^ 3433 2800 715 715 3200 2430 2430 2300 0 q 3200 1750 1750 2300 0 3200 2710 2300 2800 28010! Optimize Methyl TAR 3000 3000 3000 1500 PNP/PCT Ratio EST ACT 00 00 00 0 Optimize Ethyl PNP/PCT Ratio TAR EST ACT 500 0 0 750 2641 2641 750 0 0 500 Change Cooling TAR 200 200 200 H-0 - Item 737 EST 310 230 270 ACT 310 230 270 Untargeted: Plant Test - TAR EST ACT 2430 5270 2430 5270 TAR EST ACT Total AG Month M $ TAR EST ACT 5.75 5.90 5.90 6.0 8.17 8.17 6.0 4.85 4.85 6.0 10.63 10.62 15.5 11.2 11.2 15.5 3.15 3.15 15.5 1.75 1.75 22.5 14.3 2T7T 14.3 3.3 Total AG YTD M $ TAR EST ACT 5.75 11.75 17.75 23.75 39.25 54.75 5.90 14.06 18.92 29.55 tiuitj' 43.87 5.90 14.08 18.92 29.55 40.73 43.87 70.25 92.75 107 .1 121.4 45.62 48.33 45.62 124.7 TAR EST ACT Total Plant Month M $ TAR 46.35 78.1 102.9 64.07 60.12 43.47 EST 42.19 102.8 108.5 SI".'02 ' 85.79 46.72 ACT 42.23 108.0 113.9 81.52 89.15 45.36 49.62 53.02 45.13 3 2.08' 40.36 36.78 73.98 54.98 Total Plant YTD M $ TAR 46.35 124.5 227.3 291.4 EST 42.19 145.0 258.8 345.3 ACT 42.23 150.3 264.2 345.8 351.5 395.0 444.S_ 497.6 542.8 621.8 431.5 481.6 513.3 558.3 434.9 481.2 518.0 676.7 DEC dl 125. 52.1 723. DSW 014947 STLCOPCB4003323