May 10, 1988
Director, Air and Waste Management Division U.S. Environmental Protection Agency, Region VI 1201 Elm Street Dallas, TX 75270
RE: NOTIFICATION OF DEMOLITION/RENOVATION
Dear Sir/Madam:
This letter is to notify you of our intention to dismantle the asbestos-cement pipe operations at our Denison, TX facility. The following is for your information:
1. Name and address of owner: J-M A/C Pipe Corporation, 1051 Sperry Road, Stockton, CA 95206
2. Description of the facility: The factory was built for and used for the manufacture of asbestos-cement pipes. The operation will be shut down permanently at the end of May, 1988. All related manufacturing equipments will be dismantled and removed from the plant. Production began in 1958. The floor space area of A/C operation is 116,800 sq.ft.
3. The asbestos insulated piping and asbestos insulated tanks are as
follows:
Pipe Size Linear Feet
Pipe Size Linear Feet
1"
3/4"
1" U" U"
2"
220 210 500 180 440 1947
3" 1042 4" 529 6" 1050 8" 310
10" 334 12" 335
Six autoclaves 175 11" long x 90" diameter; One condensate tank
6'3" long x 32 " diameter; One hot water tank 8'8" long x 44"
diameter; One condensate tank 4' long x 3' diameter; One
de-aerator tank 14' long x 6' diameter; and One flash tank
5'6" long x 3' diameter. The original plant drawings were used
to determine the above along with visual observations and
verifications.
.
4. Location of the facility: Hwy 75 North, Denison, Texas
5. Scheduled starting date:
.
Exact date is yet to be determined, but will be after May 31, 1988.
Scheduled completion date:
To be determined.
D 003647
Page 2
6. Nature of planned demolition/renovation and method to be used: Physical dismantling of manufacturing equipments. The dismantled equipments will then be packaged and shipped out of the country.
7. Procedures to be used: Will follow all procedures set by EPA and OSHA. In-house supervision will be provided to see that proper procedures are followed.
8. Name and location of the waste disposal site: On site waste disposal with permits to operate from governmental authority.
Should you have any further questions, please contact either the plant manager, Mr. Charles G. Stelchek, or me. Sincerely yours,
Dr. E. E. Wang, Manager Corporate Environmental Control cc: 1) Executive Director, Texas Air Control Board, Austin, TX
2) Mr. Melvin Lewis, Texas Air Control Board, Fort Worth, TX 3) Mr. Neil Young, Grayson County Agency, Sherman, TX 4) Mr. T. E. Lohman, J-M HQ, Stockton, CA 5) Mr. C. G. Stelchek, J-M Denison Plant, Denison, TX
D 003648