Document Kzm1eM2NpVN50OO8XeJ994Ea2

(conoco) Interoffice Communication to J. A. DeBernardi From D. A. Pruitt Date May 14, 1981 subject Muriatic Acid Carbon Bed Economics Attached is a summary of the economics for installation of a carbon bed to remove the green coloration from the plant's muriatic acid stream,and sell the muriatic acid to Reagent Chemical for 35% of market value. For the base case, which assumed current production rates for the first 1% years and expansion rates for the remainder of the project life, a DCF rate of return of 90.6% was calculated. It was assumed that muriatic acid would only be produced when burning light ends and that the entire plant light ends production will be incinerated, based on 1980 production for present rates ( a conservative estimate), and based on the expansion design material balance for expanded rates. Capital costs for the project were estimated to be $146,000. This includes the price of a new carbon bed vessel and the required piping for operation and carbon regeneration. Several sensitivities were calculated to determine the effects of possible variances on the project. As can be seen in the attached Project Economics Sensitivity Analysis, the project provides a high DCF rate of return even for the worst cases. Regeneration costs and carbon replacement have very little effect on the overall project economics, while capital costs, revenues, light ends prices, and the plant expansion show a much greater effect. Calculations show that if light ends prices increased to greater than 4.4U per pound, acid could not be economically concentrated while in cinerating light ends. The sale of light ends to another customer (such as PPG) which would not require Conoco to pay transportation charges would drastically reduce the profits from muriatic acid sales. With no light ends incineration, an acid concentration of at least 16% from HC1 Absorber C-901 must be maintained to make acid concentration and sales economical. One other factor which would have a very significant impact on the carbon bed installation would be the sale of "as is" acid. Reagent has contacted Conoco and reported that they may have a market for 27% HC1 with much less restrictive quality specifications than the 31.5% HC1. If 27% acid can be sold with no carbon bed cleanup requirement, a minimum price of 1.15^ per pound ($23/ton or approximately 14% of market value) on a dry HC1 basis would result in economics equally attractive to the base case for the carbon bed project. Also, the risks involved with 27% HC1 sales would be much lower than those with a carbon bed and 31.5% HC1 sales. Therefore, it appears that the sale of 27% HC1 with no cleanup is much more attractive if a price of at least $23 per ton can be obtained. CCR 000067121 J. A. DeBernardi Page 2 Please contact me if there are any questions or comments concerning the economics of muriatic acid sales. David A. Pruitt Process Engineer br cc + attachment JWW-MLA-GLF-PLF-HLH-DLD-PE Mike Eagen - Houston CCR 000067122 MURIATIC ACID CARBON BED PROJECT ECONOMICS SENSITIVITY ANALYSIS Base Case : Capital Commitment: $146,000 Discounted Payout Period: 2.5 years DCF Return:: 90.6% Possible Variances Minus Plus % DCF Return Impaired To Improved T + 50% +100% - 20% +100% 6 mo. -30% +20% -50% 2 yr. Capital Commitment(1) Capital Commitment(1) Revenue(2) Light Ends Valued at Sale Price(3) Regeneration Costs(4) Carbon Replacement Frequency(5) No Expansion(6) 66.5 53.0 72.5 34.7 76.3 87.8 67.8 118.8 107.3 97.0 92.3 Notes: 1) Capital Commitment - +50% and -30% reflect the range of the less than budget quality estimate. +100% relfects a large contingency factor. 2) Revenue - +20% and -20% reflect possible fluctuations in cost savings. 3) Light Ends Valued at Sale Price - Variance reflects the possibility that light ends be sold with no transportation costs. 4) Regeneration - This variance reflects the effect of changes in regeneration costs. 5) Carbon Replacement Frequency - This variance reflects the possibility that carbon replacement will not occur once a year. 6) No Expansion - This variance reflects muriatic acid production rates based on current light ends production for the life of the project. CCR 000067123 MURIATIC ACID CARBON BED PROJECT ECONOMIC BASIS Capital Cost 1) The capital cost of $146,000 is based on a budget estimate taken from a 1980 definitive estimate. The budget estimate contains added cost of $15,000 for a new carbon bed rather than the used Reagent bed and $9,000 for new steam piping. The estimate was escalated at 12%%. Revenues 1) Cost Savings Revenues are the difference between operating costs when light ends are incinerated and acid is sold, and operating costs for acid neutralization. Current acid production rates are assumed for 1% years, while expansion rates are assumed for the remainder of the project life. Muriatic acid prices are from M. C. Eagen and all costs are from the March, 1981 IPA. All prices and costs are escalated at the rates used in the 1981 Capital Budget. (See Tables 1, 2, and 3 attached) Costs 1) Regeneration Regeneration frequency is assumed to be after 80 bed volumes of acid have been treated based on laboratory tests. This frequency is approximately every 2 weeks before expansion and every 4% days after expansion. Costs are based on 20,000 lbs. of 50 psig steam, 20,500 lbs. (three bed volumes) of muriatic acid, and 22,440 gallons (10 bed volumes) of process water. Costs are escalated at 12% per year. 2) Carbon Replacement Replacement of carbon is assumed yearly and costs are escalated at 12%. 3) Maintenance 4% of construction capital for the first year of operation (plant experience and escalated at 8% per year. 4) Insurance and Taxes 2% of construction capital for the first year of operation (plant experience and escalated at 7% per year. Other 1) Engineering and Startup 5% of construction capital (plant experience) 2) Salvage Value cCR 00006712** 5% of construction capital (plant experience). TABLE I -- Revenue and Cost Summary for Muriatic Acid (Hourly Basis) Item Muriatic Acid Anhydrous HC1 Light Ends Natural Gas Water Limestone Electricity Caustic Unit 4/Unit Lb. 2.8 Lb. 5.5682 Lb. 0.7500 MSCF 320.7841 M Gal. 14.3125 Lb. 0.7279 KWH 2.9260 Lb. 10.4223 CASE I Neutralize HC1 Revenue Quantity (Cost)$ CASE II Bum LE & Concentrate Revenue Quantity (Cost)$ 0 0 1535 $42.98 0 (0) 362 (20.16) 0 (0) 943 (7.07) 10.4 (33.36) 6.954 (22.31) 0 (0) 0.420 (0.06) 1014 (7.38) 0 (0) 10.44 (0.31) 26.48 (0.77) 8 (0.83) 0 (0) Margin ($41.88) ($7.39) Cost Savings = ($7.39) -($41.88) = $34.49/Hr. 0000bTl25 CCR TABLE 2 -- Revenue and Cost Summary for Muriatic Acid After Expansion (Hourly Basis) Item Muriatic Acid Anhydrous HC1 Light Ends Natural Gas Water Limestone Electricity Caustic Unit 4/Unit Lb. 2.8 Lb. 5.5682 Lb. 0.7500 MSCF 320.7841 M Gal. 14.3125 Lb. 0.7279 KWH 2.9260 Lb. 10.4223 CASE I Neutralize HC1 Revenue Quantity f Cost)$ CASE II Bum LE & Concentrate Revenue Quantity (Cost)$ 0 0 2135 $59.78 0 (0) 504 (28.13) 0 (0) 1135 (8.51) 10,4 (33.36) 6.252 (20.06) 0 (0) 0.420 (0.06) 1521 (11.07) 0 (0) 10.44 (0.31) 26.48 (0.77) 12 (1.25) 0 (0) Margin ($45.99) $2.25 Cost Savings - $2.25 - ($45.99)= $48.24/Hr. CCR 000067X26 TABLE 3 -- Yearly Cost Savings for Muriatic Acid Sales Case Existinq Plant Expanded Plant Light Ends Production MM Lbs./Yr. 5.025 9.080 Operation Time Hrs./Yr. 5,329 8,000 Total Cost Savings SM/Yr. 184 386 CCR 000067127 Jr*#-*1 n MUKIA'IIC ACIU CAKHUri BEU , BAbE C'AbE r CaLUULAiTuN UP PPJJECT ECUNUMICb (MS) ! PROJECT rtAH KhVbUULb Cub T bA'/I.MUb -2 -I 2 3 4 6 o 1 8 9 10 184.0 301.0 432.0 467.0 484.0 612.0 641.0 673.0 COo.O o4 1 .0 Cub l o MAlH J LNANCh liibUKAiiCb AOJ TAXEb nboLni:i<A i 1 UiJ CAr/8U.< ilfcr' LACeMtW 1 obt'iibC IA 1 I Uw-ClU 5 THU Cl' IOM iUiAL' <C Uo 10 CAP ITA L b.a 2.9 14.3 8.0 1 9.3 DO. 7 6.3 3.1 42.1 9.0 33.7 94.2 6.8 3.3 86.2 10.0 2o. 6 131 .9 7.4 3.6 96.4 1 1 .2 22.1 1 39.7 7.9 3.8 107.0 12.6 17./ 1 49.0 8.6 4.1 120.0 14.1 13.3 160.0 9.3 4.4 134.0 16.8 6.0 lo9.4 10.0 4.7 1 60.0 1 /. / 0.0 1 82.4 10.3 6.0 108.0 19.8 0.0 203.0 11./ 8.4 1 68 .0 22 .2 U.O 22 1.2 1AXA8LL IilCUMc UCU/<lu i AX 11< Vl:b J Mbil T 1 AX CPbUlT AI- i Li( IaX lolCUMc 133.3 04.0 14.6 83.9 200.a 99.2 U.O 10/. 6 300. 1 144.0 0.0 tbo. 1 317.3 162.3 0.0 166.0 ' 336.0 loo.d 0.0 174.2 362.0 103.9 0.0 183.0 371.6 1 (8.4 0.0 193.2 390.6 1 87.0 0.0 2 03.1 402.4 lo3.1 0.0 2 U9.2 4 13.b 1 6b.o 0.0 218.2 Ur'bHA 1 IOC CAbil PLUm 103.4 141 .3 182.6 187.1 191.9 196.3 1 99.2 203.1 209.2 218.2 I h V b o 1 .i L H i CUIbiKUCTIuii CAPITAL ( , APi'Eh TAX bTArti'JP 0.0) ( 146,0) ( 3,8) 6ALVAUH VALuh-CU,'J6'i KUCXI ON CAPITAL /.3 NbT CAbil rLUn ( 0.0)( 149.8) 103.4 141.3 182.6 187. 1 191 .9 196.3 199.2 203.1 209.2 222.8 DCP HhTUM = DlbCGuiuLl> PAYGOT PEHlGD, YEAHS* 90.056 2.0 OCR 0 0 0 0 6 7 1 2 8