Document KzJQqeowxbXRm99dRaZ2B9Ga0
FILE NAME Packings and Gaskets PAG
DATE 2002
DOC PAG030
DOCUMENT DESCRIPTION Journal Article - Fiber Release During the Removal of Containing Gaskets - A Work Practice Simulation
Pa a rere ber
Applied Occupational and Environmental Hygiene
Volume 17 55 622002
Copyright '2002 Applied Industrial Hygiene 1047-322X 12.00 + .00
Fiber Release During the Removal of Containing Gaskets A Work
Practice Simulation
William E. Longo William B. Egeland Richard L. Hatfield and Larry R. Newton
Materials Analytical Services Inc. Suwanee Georgia
Work practice studies were conducted involving the removal of containing sheet gaskets from steam flanges These studies were performed to determine potential exposure levels to individuals who have worked
with these types of materials in the past and may still work
with these products today The work practices were conducted inside an exposure characterization laboratory ECL and were performed by scraping and wire brush-
ing containin 65g to 85 sheet gaskets from a number of used steam flanges Airborne asbestos levels were measured by phase contrast microsPcCMopanyd
transmission electron microscopy TEM for the person
nel and area air samples collected durthi e sntug dy These
workplace simulations showed substantial asbestos fiber re-
lease using scraping hand wire brushing and power wire
brushing techniques during the gasket removal process The
range of concentration was 2.1 to 31.0 fibers greater than
5 micrometers when measured by PCM These results con-
trasted with the few reported results in the published literature where lower airborne asbestos levels were reported
In these studies the airborne asbestos fiber levels measured
in many of the samples exceeded all current and histori-
calOccupational Safety and Health Administration OSHA
excursion limits 15 3m0inutes and some previous permissible exposure limits PEL based on eight timeweighted average TWA standards Also individuals who performed this type of work in the past may have had exposures higher than previously suspected The results demon strated that employees who remove dry containing gaskets with no localized ventilation should wear a full face
supplied air respirator with a HEPA escape canister and the work area should be designated a regulated area
Keywords Asbestos Gasket Removal Exposure
containing sheet gaskets have been used in almost every type of industry for the last 60 years These gaskets had
the ability to prevent leakage between different types of cou-
plings particularly elevated temperatuarnde pressure These
types of gaskets normally contained 70 percent to 80 percent chrysotile asbestos by weight In some cases crocidolite asbestos was used for special applications that is sealing flanges in acid lines The remaining asbestos component of the gasket was usually constructed of synthetic rubber material that consisted of either neoprene styrenc butadiene rubber SBR or a nitrile
Most companies replaced asbestos fibers in their gasket products with other nonmineral fibers in the late 1980s or early
1990s This coincided with the Environmental Protection
Agency's EPA 1989 ban on the manufacture importation pro-
cessing and distribution of these types of products However
the United States Fifth Circuit Court of Appeals vacated most
of the asbe bansat nd o Phas se Out Rule and remanded it bactko
EPA in October 1991. Although the court vacated and remanded most of the rule it left intact the portion that regulated asbestos products that were not being manufactured produced or imported when the rule was published in December 1989. Since containing sheet gaskets were still being imported into this country they were exempt from the ban and can still be manufactured purchased and used in the United States
Fowler recently described the problem with the use of these products when he demonstrated that the application of asbestos-
containing gaskets had the potential to release respirable
asbestos fibers well above current OSHA standards Fowler rec-
ommended that these products should not be used in today's industry and that only asbestos gaskets should be used in
their place
An issue that faces many former industrial workers is the past use of these types of gaskets Workers were not informed
in most cases that the products they were using had the potential to release elevated levels of respirable asbestos fibers Legal issues concerning past exposures pose this basic question Did
handling and performing maintenance activities on these gaskets
contribute to their asbestos exposure history Industrial hygienists must rely on a retrospective exposure assessment to make
55
56
W. E. LONGO ET AL
this determination In this approach the individual's work history is compared to the results of retrospective exposure assessment studies that replicate their work activities
A review of the reviewed literature found very few published studies involving exposure assessments during the dry
removal of asbestos sheet gaskets from flanges The stud-
ies of Cheng Millette and McKinery were somewhat limited in the information reported Millette used only a small number of flanges Cheng's work did not verify that all the gaskets contained asbestos Additionally there was only limited information provided in all three studies concerning the size and the history of the flanges used or the length of time required for the gasket removal process
The most comprehensive study to date was by Spence et al 10
However the authors used wetting to control the airborne release of asbestos fibers This limited the study's value for any retrospective exposure assessment since dust control methods were not used in the workplace historically
In contrast to the previous studies the goal of these new work practice studies was to estimate a worker's asbestos fiber exposure during the removal of containing sheet gaskets using common removal techniques such as scraping hand wire brushing and power wire brushing The studies were conducted on a large population of steam line flanges and valve assemblies The compilation of several studies discussed in this article allows a more accurate retrospective exposure assessment for individuals who worked with these products in the past and the assessment of potential exposure to workers who may be removing containing gaskets today using these same work practices
intensity lighting and videotaping techniques were used inside an exposure characterization laboratory ECL during the work practice studies to visually document the pathway of exposure during the gasket removal process and to help determine what activities produce the airborne asbestos dust
The methods and procedures described in this report can be applied to assessing past and present industrial hygiene exposures to other dusts fumes and fibers besides asbestos The videotaping of dust fume and fiber exposures under high-
intensity light can be used as a training tool in visualizing the
importance and effectiveness of engineering and administrative controls and respiratory protection
MATERIALS AND METHODS
A number of valve and flange assemblies were collected in 1994 from a paper mill powerhouse in Oregon and stored under ambient conditions in a protective environment until their use in these studies A sampling of these flange and valve assemblies was partially opened to confirm the presence of asbestos in the sheet gaskets using polarized light microscopy PLM prior to
the work practice study Any opened flanges were reassem-
bled and the outside surfaces of all the flanges were cleaned sand blasted and repainted Interviews with former machinists and
pipefitters determined that the most common techniques for removing gasket material tightly adhered to the flange surface were hand scraping hand wire brushing electric wire brushing
The work practice simulations were conducted inside an exposure characterization laboratory ECL that was constructed as a containment area to prevent the release of asbestos to the
outside environment The dimensions of this containment area
were 6.0m length x 4.5m width x 2.4m height The ECL also contained two viewing ports for videotaping purposes and had a decontamination area for contaminated clothing disposal an air lock for sample removal and showers to further control fugitive emissions
Fresh air was produced by a high efficiency particulate ab-
solute HEPA filtered negative air machine manufactured by Aramsco model 55011 and pulled through the ECL at a ventilation rate of 5.7 cubic meters per minute This unit was operated at an air exchange rate of five times per hour ACH during the work practice studies The air in the chamber was flushed between studies by increasing the fresh air ventilation to 28.3 cubic
meters per minute for a minimum of 24 hours At the end of the
first scraping and hand wire brushing study Study ) the ECL was completely decontaminated by HEPA vacuuming all dust and debris and then wet wiping Also all inside surfaces were repainted after the decontamination procedure
intensity lighting 700-1000 watts was used inside the chamber during videotaping of the work practice to document dust generated by various tasks and to observe pathways of exposure to respirable dust In previous studies the use of highintensity lighting was found to be an effective tool to display respirable airborne dust released from containing products during work activities The authors performed these studies wearing normal work clothes over disposable protective suits and were equipped with supplied air respiratory protection
with HEPA escape filters
Personal and area air samples were collected during the studies using nonconductive piece cassettes The cassettes contained mixed cellulose ester MCE filters that were
25 millimeters in diameter and had 0.8 micrometer pore size
These filters rested on a MCE backing filter 5.0 micrometer pores The personal and area air sampling pumps were calibrated before and after the completion of each study against a DryCal primary flow meter to air flow rates of two and ten liters per minute respectively volume sampling pumps Dawson 110 volt were used for collecting area air samples during the studies Four area samples were located in four equidistant quadrants at a distance of 2.1 meters from a work bench placed in the center of the ECL The area sample cassettes were placed on sampling stands at a height of 1.5 meters The four calibrated volume air sampling pumps were placed outside
the chamber and each pump was connected to an area air cassette
by Tygon tubing passing through the wall of the ECL The two investigators performing the studies were each fitted
with two calibrated personal GilAir air sampling pumps with the sampling cassettes attached to each shoulder and within their
FIBER RELEASE DURING REMOVAL OF ASBESTOS
57
breathing zones Background area samples were collected inside and outside the ECL before each study The air samples were collected in general accordance with the NIOSH 7400 method entitled Asbestos and Other Fibers by PCM Two air sampling cassettes were opened for 30 seconds inside the ECL to serve as personal field blanks at the end of each study
Surface morphology of new and used gasket material was examined using a Hitachi 800 field emission scanning electron microscope SEM Photomicrographs were taken of the gasket surfaces to document the degree of gasket degradation and the
relative amount of asbestos fibers present on the surface
Study Scraping and Hand Wire Brushing of Small Flange Assemblies
Seven small flange assemblies were used in this study The gaskets had outside diameters of approximately 69 mm and working widths of approximately 19 mm Gaskets were removed from one flange on the first four valve assemblies and then from two flanges on each side of the remaining three valve assemblies for a total of ten gaskets The flange assemblies were first opened
and then the gaskets were scraped using a stiff wide
putty knife Any residual gasket material that could not be removed from the flange faces by scraping was removed by hand wire brushing Some of the gaskets required repetitive scraping and wire brushing to remove the gasket and to polish the flange face The sheet gaskets were removed sequentially from each of the 10 flanges
One of the investigators in the ECL simulated the worker who did all of the gasket removal while the other acted as a helper The helper changed the area and personal air sample cassettes periodically throughout the study Each gasket was collected and retained for analysis to determine both asbestos content and matrix identification after removal The investigators were the ECL for 194 minutes All air sample cassettes in the ECL were exchanged every 15 to 30 minutes A total of seven sets of air samples were collected
Study Scraping and Hand Wire Brushing of Large Flange Assemblies
Four large flange assemblies were used for this study The outside diameter of these gaskets varied from 125 mm to 200mm and the gaskets were 19 mm to 25 mm wide The gaskets were removed and collected from the four flanges as described in Study 1. The investigators were in the ECL for 113 minutes All air sample cassettes in the ECL were exchanged every 15 to 30 minutes A total of five sets of air samples were taken during this work practice simulation
Study Power Wire Brushing of Large Flange Assembly An electric wire brush Skil electric drill 0.3 Hp with a
Columbian 10.2 cm crimped wire wheel was used during this study to remove gasket residue that could not be removed during the scraping and hand wire brushing of the first flange assembly
used in Study 2. The electric wire brush was also used to polish the flange face surfaces This study was conducted one day after Study 2. The ECL was not decontaminated between the studies The two flange surfaces were electric wire brushed until the gasket residue was visibly removed As previously described in Study , the two investigators were in the ECL performing the study
One person did the removal work while the other assisted as
the helper The residual gasket material was not retained since the bulk of the material was collected in Study 2. The investigators
were in the ECL for 42 minutes The air cassettes in the ECL
were exchanged every 10 minutes A total of four sets of air samples were taken during the electric wire brushing activity
All air filters collected were analyzed by PCM in general accordance with the NIOSH 7400 method using the A counting rules Additionally all air samples were prepared for TEM examination using the indirect preparation method The indirect TEM preparation method was chosen because filter overloading rendered the samples unsuitable for direct preparation despite frequent changing of the air sample cassettes Also the indirect TEM preparation method enabled data comparisons to other published and unpublished studies previously performed that also used the indirect TEM method The TEM air sam-
ples were then analyzed by a modified EPA Level II protocol
Cloth swatches from the work clothing worn by the investigators during the studies were analyzed by the recommended EPA method Surface dust samples were collected from the work table after each gasket removal study and analyzed according to
the ASTM protocol Background samples from the clothing
and the work table surface were also collected before each study was started The removed gaskets were analyzed for asbestos type and content by the standard PLM method
RESULTS
It was determined by PLM that the gaskets removed in these studies contained 65 percent to 85 percent chrysotile asbestos Table ) Table II and Table III respectively illustrate the PCM and TEM results for Study 1. The worker in Study 1 had a peak exposure level of 10.1 fibers per cubic centimeter cc and an hour TWA exposure of 1.5 cc The area air samples were voided after the completion of Study 1 when it was determined that the sampling lines into the ECL were obstructed The
Studies
Study 1 Study 2 Study 3
TABLE I
PLM analysis of removed gaskets
Number of
gaskets analyzed
10 4 1
Asbestos type
Chrysotile Chrysotile Chrysotile
Concentration of asbestos in
volume percent
65-80 75-85
85
58
W. E. LONGO ET AL
TABLE II
Study Scraping and hand wire brushing small flanges PCM airborne exposure levels fibers greater than 5 micrometers
Sample type
No. of air
samples analyzed
Range cc
Sample time weighed average cc
hr TWA
cc
Background
4
0.0
0.0
Worker
14
1.5-10.1
3.7
Assistant
14
1.2-4.2
2.4
Area samplesA
36
A 1.5 1.0
_
Total sampling time = 194 minutes The sampling lines into the ECL were obstructed voiding the area air samples in this study
results for Study 2 are shown in Tables IV and V. The worker in this study had a peak exposure level of 24.0 cc and an
hour TWA of 3.6 cc Table VI and Table VII list results
for Study 3. The peak exposure level found while power wire brushing was 31.0 cc and the calculated hour TWA was 2.3 cc The results for the surface dust samples taken from the work table and the fabric samples are shown in Table VIII All PCM and TEM data in the tables are expressed for comparison purposes as fibers per cubic centimeter cc greater than 5.0 micrometers in length
DISCUSSION
The asbestos concentrations measured in these studies were
higher on average than other previously published studies for
similar work practices It is believed that the higher concen-
trations found in these studies were due largely to the gaskets adhering more tightly to the flanges Tightly adhered gaskets require higher for removal As described by Fowler the
friability of the product is always relative to the energy applied
Only two of the fourteen gaskets removed could have been described as easily detached The other twelve required extensive effort on one or both of the flange faces Machinists pipefitters steamfitters and others commonly described sheet gaskets as tightly adhering to flange surfaces and requiring substantial work to remove the gasket material Unfortunately the various conditions and the amount of adhesion of the gaskets in the pre-
viously published studies were not reported The adhesion
of gasket materials generally has been related to its length in
TABLE III
Study Scraping and hand wire brushing small flanges TEM airborne exposure levels asbestos fibers greater than 5 micrometers
Sample type
No. of air
samples analyzed
Background
4
Worker
. 14
Assistant
14
Total sampling time - 194 minutes
Range fibers
0.0 29.9-144.2
2.2-29.5
service and the conditions of service such as temperature and
pressure The high temperature steam flanges used in this study were from a steam powerhouse that operated for a number of
years The last steamfitter who maintained the steam system in-
dicated that gasket replacement was rare due to infrequent plant downtime and few leaks Gaskets that could be easily removed would not be expected to produce airborne levels comparable to what was found in these studies None of the previous studies described the level of difficulty of removing the gaskets from the flange surfaces
The air samples collected were analyzed by both PCM and TEM during the gasket removal activities in these studies The two basic types of sample preparation for TEM air analysis are the direct and indirect 15,16,21-23 Some scientists have
suggested that the indirect sample preparation method particularly the sonication step causes large complex asbestos struc-
tures such as fiber bundles and clusters to break up and bias
fiber counts to higher concentrations However studies performed by the EPA and others have shown that this criticism is not valid and that the indirect technique is an acceptable method
to analyze overloaded air samples
The overloading of other particulates on an air filter will ob-
scure fibers that are collected This condition can lead to the
undercounting of asbestos fibers if a direct preparation method
is used Controlling the particulate loading on a filter can be dif-
ficult when the disturbance of materials generates large amounts of both fibrous and nonfibrous airborne particulates The general approach to reduce or eliminate overloading conditions is to alter flow rates and sampling times However particulate loading can be controlled by using the indirect preparation method without compromising sampling times The overloading problem can also affect the direct examination of air filter samples by PCM NIOSH 7400 method This was noted in Study 1 The asbestos air concentrations measured by PCM in Study 1 decreased as the study progressed This would not be consistent with the continued activities that took place inside the ECL during the study This effect was due to particulate overloading on the filters However according to the TEM data from Study 1
the asbestos fiber concentrations tended to increase as the work
progressed The sampling times for Studies 2 and 3 reduced
in an effort to minimize overloading on the PCM air samples
FIBER RELEASE DURING REMOVAL OF ASBESTOS
59
TABLE IV
Study Scraping and hand wire brushing large flanges PCM airborne exposure levels fibers greater than 5 micrometers
Sample type
No. of air
samples analyzed
Range cc
Sample weighted average cc
hr TWA
cc
Background
4
Worker
10
Assistant
10
Area samplesA
24
0.0 9.3-24.0 5.2-15.7 2.1-8.4
Total sampling time = 113 minutes ATWA not calculated for area or bystander samples
0.0 15.3 8.8
A 3.6 2.0
_
However any further reduction in the sampling time would have had an impact on the work activities Therefore the sampling
times were not decreased any further
The current OSHA asbestos exposure standards are based on the NIOSH 7400 method This method measures only fibers longer than 5 micrometers in length and greater than
0.25 micrometerisn width However these fiber dimensions
were not implemented by OSHA with regard to health issues The minimum dimensions were implemented solely due to the
fiber resolution limitations of the PCM technique OSHA has long recognized that PCM is not specific or able to
resolve fibers that are less than 0.25 micrometers in width The
TEM analysis performed in these studies augmented the PCM measurements by obtaining more complete and accurate mea-
surements of the airborne asbestos concentrations
A comparison of the air data collected from the PCM and TEM analyses showed fiber concentrations approximately 30 times greater in the TEM analysis The differences between TEM and PCM measurements have been recognized by others and are primarily due to the resolution limitations of the opti-
cal microscope The deficiencies of PCM measurements
are especially acute when products such as sheet gasket materials that contain high percentages of chrysotile fibers are the
source of the airborne fibers It has been shown that free res-
pirable chrysotile fibers are released when containing products are abraded in some manner
Work by the EPA demonstrated that single chrysotile fibers
have an average diameter of between 0.03 and 0.07 micro-
TABLE V
Scraping and hand brushing large flanges TEM airborne exposure levels asbestos fibers greater than 5 micrometers
Sample type
No. of air
samples analyzed
Background Worker Assistant
Area samples
4
14
14
"
24
Total sampling time = 113 minutes
Range fibers
0.0 199.6-842.7
13.6-101.0 3.3-108.8
meters This average diameter is approximately five times below the resolution of a phase contrast microscope Therefore single chrysotile fibers cannot be seen or counted using the PCM method irrespective of their lengths Because of the inherent errors in PCM analysis it was suggested by the director of the
Health Effects Institute for Asbestos Research that OSHA should
consider changing to TEM air sample analyses for occupational workplace compliance to adequately protect workers health
An SEM examination of the sheet gaskets was performed to better understand the relationship between the physical activity
of removal and the measured asbestos air levels found in this
study Generally sheet gaskets are comprised of approximately 70 percent chrysotile asbestos bundles in a synthetic rubber matrix The SEM micrograph Figure ) shows large bundles of asbestos protruding from the matrix of new sheet gasket material Any minimal disturbance or abrasion of these bundles can release asbestos fibers into the air Another problem with asbestos gaskets is that the synthetic rubber matrix begins to deteriorate after installation In most cases installed sheet gaskets are subjected to high temperature and pressure that will increase the rate of thermal decomposition of the rubber matrix This produces linking of the polymer molecules The linking process increases the gasket material's friability by causing the rubber matrix to degrade and become brittle
A comparison of the surface of a new gasket Figure ) to that of a used gasket removed from one of the flanges in Study 2 Figure 2 demonstrates how the rubber matrix material is degraded This degradation provides more opportunity for the release of asbestos fibers during the removal process The fiber concentrations measured in Study 2 were higher than those measured in Study 1 even though more gaskets were removed in the first study Factors believed to lead to these results were as follows 1 The total gasket surface area removed in Study 2 was much larger than in Study 1 2 The gaskets in Study 2
were observed to be more friable and more deteriorated and
3 All the gaskets in Study 2 tore apart and remained adhered or attachetdo both of the flange faces when the flanges were
opened electric powered drill equipped with a wire brush was used
to remove some residual gasket material from two flange faces in Study 3. The resulting exposures during the work activities
60
W. LONGO ET AL
TABLE VI
Study Power wire brushing PCM airborne exposure levels fibers greater than 5 micrometers
Sample type
No. of air
samples analyzed
Range
cc
Sample weighted average cc
Background
Worker Assistant Area samplesA
4
0.09-0.12
7
14.9-31.0
8
12.8-21.2
16
7.6-15.7
Total sampling time = 42 minutes ATWA not calculated for area or bystander samples
0.11 21.8 15.9
_
hr TWA
cc
A 2.3 2.0
were higher even though the residual gasket material was far less than the gasket materials removed in Study 1 and Study 2 It was observed in Study 3 that the mechanical action gener-
ated from the power wire brush tore loose more asbestos fibers
and propelled them greater distances into the air This observation supported the higher asbestos air concentrations of the area samples measured in Study 3 compared to those measured in Study 2. The results from the surface dust and fabric samples Table VIII showed that the surface asbestos levels measured can be classified as highly contaminated and pose additional exposure problems to the worker throughout the workday Addi-
tional asbestos exposure can occur to both the worker and other
family members if the clothes are worn away from the job or taken home
CONCLUSIONS AND RECOMMENDATIONS
These studies as well as the other studies previously discussed demonstrate that there can be wide variability in airborne asbestos fiber levels generated during the removal of asbestoscontaining gaskets from flanges The variability of fiber levels released is most likely dependent on the condition of the asbestos gasket the size of the gasket surface area and the method of removal The condition to which a gasket is subjected determines the degree of adhesion of the gasket to the flange surface and the friability of the gasket This impacts the amount of energy required to remove the gasket and release asbestos fibers The determining factors that seem to affect the condition of the gasket
TABLE VII
Study Power wire brushing TEM airborne exposure levels asbestos fibers greater than 5 micrometers
Sample type
Background Worker Assistant
Area samples
No. of air
samples analyzed
4 7 8
.
16
Range
0.0-0.2 877.1-1636.1
60.4-364.4 56.9-801.9
Total sampling time - 42 minutes
are length of service temperature and pressure conditions and composition of the gasket matrix
Our data show that dry removal methods typically used by machinists and pipefitters past and present result in significant airborne asbestos fiber exposures For retrospective asbestos exposure assessments the exposures measured by PCM in Studies 1 2 and 3 exceed all historical OSHA excursion limits and some
previous permissible exposure limits PEL based on an eight-
hour TWA The exposures also far exceed current OSHA levels
Therefore former machinists and pipefitters that performed this type of work as part of their job activities would have had significant airborne asbestos exposures when removing tightly adhered gaskets on flange surfaces
Under normal lighting airborne dust is invisible even though
the asbestos levels measured are above OSHA excursion limits
Therefore an individual removing containing gaskets will be unaware of any airborne exposure problems under normal working conditions intensity lighting Tyndall Effect was used by the investigators in these studies to observe exposure mechanisms for workers performing normal work activities The Tyndall Effect documented fiber release mechanisms and the pathways of exposure to the individuals removing the gaskets Tyndall lighting is an alternative technique that industrial hygienists can use to check potential airborne dust emissions in the workplace The Tyndall lighting technique can visually demonstrate to workers and employers if there is a need for air sampling additional ventilation respiratory protection and special work practices
There are still significant numbers of asbestos gaskets currently being used in the United States OSHA classifies the
TABLE VIII TEM fabric and surface dust contamination levels
Studies
Study 1
Study 2 Study 3
Fabric
981 thousand 3.2 million
19.3 million
Surface fibers
8.5 million 27.8 million 57.4 million
All background control samples and field blanks analyzed were below the analytical detection limit
FIBER RELEASE DURING REMOVAL OF ASBESTOS
61
&
9
#
' +
8
6
@
FIGURE 1
Scanning electron micrograph of the surface of a new containing gasket Both the chrysotile fibers and
polymer matrix are visible Magnification 1000
FIGURE 2
Scanning electron micrograph of the surface of a used containing gasket The majority of the material present is only chrysotile asbestos Magnification 1000
removal of containing gaskets as Class II work of short duration This specification by OSHA only addresses a single gasket removal project However interviews with pipefitters and machinists indicate that only removing one gasket at a time was not a typical occurrence Under current OSHA regulations the removal of containing gaskets requires the use of a glove bag and wetting methods to contain the release of asbestos fibers into the workplace Unfortunately the glove bag and wetting methods are not always practical in an actual workplace due to production and maintenance schedule pressures and the difficulty in wetting a rubber based
gasket The results of these studies indicate that employers need to de-
termine if containing gaskets are present in their equipment The employer must immediately comply with OSHA's Class II provisions by implementing a safe operating procedure that includes employee training monitoring containment and good work practices The following actions are recommended if containing gaskets are removed without a glove bag and wetting 1 A negative pressure en-
closure should be used 2 The enclosure should have a HEPA filtering blower system 3 A HEPA vacuum cleaner and wetting agents should be used and 4 The worker should wear
respirator appropriate for the airborne asbestos concentrations generated by the activities
The data presented here demonstrate that the work surfaces in these studies as well as the clothing worn by the investigators were highly contaminated with asbestos fibers An asbestoscontaminated workplace can lead to additional asbestos exposures The disturbance of the dust around the work area by other work activities and housekeeping activities will entrain asbestos fibers into the air The wearing changing and washing of the contaminated clothing can also lead to asbestos exposures for both a worker and family members
REFERENCES
1. Bowler W.J Hows and Whys of Packing of Gaskets Paper Trade Journal Oct. 1965
2.2. Garlock Industrial Products Catalog 1969 3. Klinger Compressed Gasket Materials Catalog 1983
4. 4. Crane Packing Company Catalog 60 1954 5. Environmental Protection Agency EPA 40 CFR Part 763 Asbestos Manufacture Importation Processing and Distribution in Commerce Prohibitions Final Rule Title 40 Code of Federal Regulations Part 763 Fed Reg 132 July 1989
62
W. E. LONGO ET AL
6. Fowler D.P Exposure to Asbestos Arising from Bandsaw-
ing Gasket Material Appl Occup Environ Hyg 404-
408 2000
7. Cheng R.T McDermott H.J Exposure to Asbestos from As-
bestos Gaskets Appl Occup Environ Hyg 588
5911991
8. McKinery W.N Moore R.W Evaluation of Airborne Asbestos
Fiber Levels During Removal and Insulation of Valve Gaskets and
Packing Amer Indus Hyg Assoc J 531-532 1992
9. Millette J.R Mount M.D Hays S.M Releasability of Asbestos
Fibers from Asbestos Containing Gaskets Environ Choices
Supp 10-15 1995
10. Spence S.K Rocchi P.S.J Exposure to Asbestos Fibers During
Gasket Removal Ann Occup Hyg 583
5818996
11. Environmental Protection Agency EPA Method for the Determi-
nation of Asbestos in Bulk Building Materials R93-116
EPA Washington DC 1993
12. Chambers D.T Dust Control Development In Asbestos
S. Chissick R. Derricott Eds vol 2 Properties Applications and
Hazards pp 193 21J1ohn Wiley & Sons New York 1983
13. Selikoff I.J Insulation Hygiene Progress Report 4 Winter
1971
14. National Institute for Occupational Safety and Health NIOSH
Asbestos and Other Fibers by PCMMethod 7400. NIOSH Man-
ual of Analytical Methods 4th ed DHHS NIOSH Publ No. 94-
113 NIOSH Cincinnati OH 1994
15. American Society for Testing Materials ASTM Standard Test
Method for Microvacuum Sampling and Indirect Analysis of
Dust by Transmission Electron Microscopy for Asbestos Struc-
ture Number Concentration D5755-95 ASTM 1995
16. Keyes D.L Chesson .; Ewing W.M et al Exposure to Air-
borne Asbestos Associated with Simulated Cable Installation
Above a Suspended Ceiling Amer Indus Hyg Assoc J 479
484 1991
17. Keyes D.L Ewing W. M Hayes M.S et al Baseline Studies of
Asbestos Exposure During Operations and Maintenance Activities
Appl Occup Environ Hyg 853
8610994
18. Ewing W.M Chesson .; Dawson T.A et al Asbestos Expo-
sure During and Following Cable Installation in the Vicinity of
Fireproofing Environ Choices Supp 23-18 1993
19. Environmental Protection Agency EPA Methodology for the
Measurement of Airbome Asbestos by Electron Microscopy EPA
Draft Report Contract No. 68-02-3266 EPA Washington DC
1984 20. Chatfield E.J Analytical Protocol for Determination of Asbestos
Contamination of Clothing and Other Fabrics Microscope 221222 1990
21. Environmental Protection Agency EPA Containing Materials in Schools Interim Transmission Electron Microscopy Methods Title 40. Code of Federal Regulations Part 763 Subpart E Appendix A 1987
22. Environmental Protection Agency EPA Electron Microscope
Measurement of Airborne Concentrations 2-77-178
EPA Washington DC 1978
23. International Organization for Standardization ISO Ambient Air Determination of Asbestos Fibers Transfer Transmission
Electron Microscopy Method ISO 13794. ISO 1999
24. Sahle W Laszlo .: Airborne Inorganic Fibre Level Monitoring by
Transmission Electron Microscopy TEM Comparison of Direct and Indirect Sample Transfer Methods Ann Occup Hyg 29 44 1996
25. Lee R. .; Dagenhaut T..V;Dunmyre G.R et al Effect of Indirect
Sample Preparation Procedures on the Apparent Concentration of Asbestos in Settled Dusts Environ Sci Technol 29 1728-1738
1996
26. Environmental Protection Agency EPA Comparison of Airbome Asbestos Levels Determined by Transmission Electron
Microscopy TEM Using Direct and Indirect Transfer Techniques
EPA 5-89-004 EPAWashington DC 1990
27. Crankshaw O.S Perkins L.R Beard M.E Quantitative Eval-
uation of the Relative Effectiveness of Various Methods for the
Analysis of Asbestos in Settled Dust Environ Choices
Supp 6-12 1996
28. Hatfield R.L Krewer J.A Longo W.E A Study of the Re-
producibility of the Micro Technique as a Tool for the
Assessment of Surface Contamination in Buildings with Asbestos-
Containing Materials In Advances in Environmental Measure-
ment Methods for Asbestos M.E. Beard H.L. Rook Eds pp 301-
312. American Society for Testing Materials 2000
29. Occupational Safety and Health Administration OSHA Oc-
cupational Exposure to Asbestos Tremolite Anthophyllite and
Actinolite Final Rules Federal Register 119 p 22680 1986
30. Snyder J.G Virta R.L Segreti J.M Evaluation of the Phase
Contrast Microscopy Method for the Detection of Fibrous and
Other Elongated Mineral Particulates by Comparison with a STEM
Technique Amer Indus Hyg Assoc J 471
4717987
31. Maccoui A Menichini E Paoletti L A Comparison of Light
Microscopy and Transmission Electron Microscopy Results in the
Evaluation of the Occupational Exposure to Airborne Chrysotile
Fibers Ann Occup Hyg 321
3311984
32. Environmental Protection Agency EPA Environmental Release
of Asbestos from Commercial Product Shaping EPA 1600
85/044 Cincinnati OH 1985 33. Communication between Mr. Archibald Cox Chairman Board of
Directors for the Health Effects Institute Asbestos Research and
Mr. David Zeigler Acting Assistant Secretary the Occupational Safety and Health Administration August 1993 34. Sommer J.G Rubber Molding Methods In Handbook of Polymer Science & Technology N.P. Cheremisinoff Ed vol 3 Applications and Processing Operations pp 311 37M2arcell Decker New York 1989
35. Millette J.R Hays S.M Settled Asbestos Dust Sampling and Analysis Lewis Publishers CRC Press Boca Roton FL 1994
36. Occupational Safety and Health Administration OSHA Asbestos Construction Standard Title 29 Code of Federal Regulations Part 1926. 1101. General Industry Standard Title 29 Code of Federal Regulations Part 1910.1001 1999