EPA REGION 5 Enforcement and Compliance Assurance Division INSPECTION REPORT
Inspection Entry Date/Time Inspection Exit Date/Time Weather Media Statute(s)/Program(s) Type of Inspection
09/06/2023 12:22 PM (CT)
Announced: Yes
09/06/2023 03:45 PM (CT)
Access: Granted
Cloudy/rain
Water
Clean Water Act, NPDES, WWTP
Compliance Evaluation Inspection (CEI)
Permittee Name Facility Names
Facility Physical Address City, State, Zip Code County Facility GPS Coordinates Mailing Address (If different)
City, State, Zip Code
Forest County Potawatomi Community 1) Crandon Recirculating Sand Filter/Stone Lake WWTP; and 2) Carter
Wastewater Treatment Facility
1) Hwy 8 East; 2) Hwy 32 S 1) Crandon, WI; 2) Carter, WI Forest County 1) 45.56948, -88.85437499; 2) 45.40145833, -88.62622499 Forest County Potawatomi Community P.O. Box 340 5416 Everybody's Road Crandon, WI 54520
FRS ID
1) 110010884221; 2) 110070628400
Permit Number(s) (If Applicable) 1) WI0058424; 2) WI0058432
SIC and/or NAICS
4952
Regulatory Representatives Participating in Inspection:
Title
Name
Inspector
Ray Cullen
Organization EPA REGION 5
Lead Inspector: Dean Maraldo
Supervisor Review: Ryan Bahr
[Signature] DINO MARALDO
Digitally signed by DINO MARALDO Date: 2023.09.22 09:01:50 -05'00'
EPA REGION 5
maraldo.dean@epa.gov
(312) 353-2098
[Signature]
Digitally signed by RYAN
RYAN BAHR Date: 2023.09.27 BAHR
18:11:30 -05'00'
EPA REGION 5
bahr.ryan@epa.gov
1 of 33
Stone Lake WWTP and Carter WWTF Inspection Date: 09/06/2023
SECTION I - INTRODUCTION
Site Entry and Inspection Objectives
I, EPA Region 5 Lead Inspector, Dean Maraldo, arrived at the Forest County Potawatomi Community ("FCPC") Utilities office near the Crandon Recirculating Sand Filter/Stone Lake Wastewater Treatment Plant ("Stone Lake WWTP"), located at Hwy 8 East, Crandon, WI 54520, at 12:22 PM (CT) on 09/06/2023 for an announced inspection. I, along with EPA Region 5 inspector Ray Cullen, presented our inspector credentials to Nate Guldan and informed them that this was a EPA Region 5 inspection to determine compliance as authorized by Clean Water Act (CWA) Section 308 and implementing regulations. This report is based on information supplied by representatives of the Forest County Potawatomi Community, owners and operators of the Stone Lake WWTP and Carter Wastewater Treatment Facility ("Carter WWTF"), direct observations made by EPA Region 5 inspectors, records and reports maintained by the permittee and other information including: photographs taken by EPA Region 5 inspectors, physical evidence collected by the EPA Region 5 inspectors, verbal or written statements made by information supplied by Stone Lake WWTP and Carter WWTF representatives during or subsequent to the on-site inspections, and materials, processes, data, photographs, or documents shown, demonstrated, or submitted to the EPA Region 5 inspectors by Stone Lake WWTP and Carter WWTF representatives during or subsequent to the on-site inspections. In addition, information gathered prior to or subsequent to the inspections from a review of EPA and/or public records may be included in this report.
Attendees
Organization
Attendee Name
EPA Region 5 EPA Region 5 FCPC
Dean Maraldo Ray Cullen Nate Guldan
FCPC FCPC Indian Health Service
Aaron Loomis Bruce Johnson Shane Hoffman
FCPC
Jennifer Spencer
Title Lead Inspector
Present in Opening Conf.
Yes
Inspector
Yes
Public Works Division Yes Administrator
Attorney
Yes
Utility Manager
Yes
Wisconsin Tribal Utility Yes Consultant
Water and Sewer
Yes
Manager
Present in Closing Conf. Yes Yes Yes
Yes Yes Yes
Yes
Facility/Site Description
I began by reviewing the facility description provided in the current permits (excerpts below) for Stone Lake WWTP and Carter WWTF, and the Facility representatives confirmed the information as described below. Changes to the permit descriptions were made by Bruce Johnson (Utility Manager) and indicated in bold below.
Permit Fact Sheet Facility Description for the Carter WWTF:
The applicant recently constructed a new wastewater treatment system as described below to replace its existing lagoon facility.
The system is designed to treat 0.06 mgd of domestic wastewater. The discharge uses the same outfall as the replaced lagoon facility and is continuous to a wetland from Outfall 001 on the Reservation. The facility was placed into operation in June 2019.
2 of 33
Stone Lake WWTP and Carter WWTF
Inspection Date: 09/06/2023
The FCPC Carter Wastewater Treatment Facility (WWTF) provides wastewater treatment services to the local community and the Casino. Lift Station #1 transfers flows from the sanitary sewer system to the WWTF via 8-inch sanitary force main to the WWTF Headworks where influent flow is measured with a magnetic flow meter.
The Head works consists of a combination fine screen and grit classifier unit with a capacity of 0.4 mgd (error, should be 0.7 million gallons per day "MGD"). The screenings and grit are discharged into separate dumpsters for disposal. An influent composite sampler samples the influent wastewater immediately after screening.
Septage from the Carter area is hauled to the WWTF site. A Septage Receiving Station with a magnetic flow meter to record septage volume and to facilitate metering of flows into the treatment process.
After screening and grit removal, the wastewater flows by gravity through an 8-inch pipe to the aeration splitter box. Stop gates allow influent wastewater to be channeled into any of the three (3) aeration basins.
At startup, only one (1) of the aeration basins will be in service while at design capacity, two (2) aeration basins will be used. The third aeration basin can be used in the event the other basins need to be serviced.
The aeration basins are designed with anoxic and aerobic zones. Three (3) pH adjustment chemical feed skids and one (1) Phosphorus removal chemical feed skid is provided.
Following aeration, the wastewater flows into one (1) of two (2) final clarifiers (only using one clarifier right now, one on standby). Only one (1) clarifier is required to be on-line at any given time; the second unit is provided as a backup for maintenance purposes. Following clarification, effluent flows to an Ultraviolet (UV) disinfection unit. The UV disinfection system has a design average flow of 275 gpm and a peak flow of 350 gpm.
After UV disinfection, effluent is discharged to the current outfall by gravity incorporating a series of manholes. Spill plates are provided in each of the manholes to increase Dissolved Oxygen (D.O.) levels in the effluent prior to discharge.
Jennifer Spencer added that there are two lift stations in Carter WWTF collection system.
Permit Fact Sheet Facility Description for the Stone Lake WWTP:
The application and plans indicate that the permittee owns and operates a 0.07 mgd wastewater treatment plant using a recirculating sand filter.
Wastewater is collected via two lift stations, twelve effluent pumps, and several thousand feet of gravity sewer and force main.
The Stone Lake Wastewater Facility Modifications provided for Septic Receiving, Phosphorus removal and UV disinfection. The project also redirected influent wastewater to be screened prior to further treatment with the existing Recirculating Sand Filter.
To accomplish this, the project included a new metal building with wastewater treatment equipment and exterior site improvements. In addition, the project
included converting the existing Controls Building to storage and adding controls to tie the Main Lift Station Controls to the Septage Receiving. The Recirculating Sand Filter stayed in
3 of 33
Stone Lake WWTP and Carter WWTF Inspection Date: 09/06/2023
place as-is. The discharge is continuous to a wetland from outfall 001 on the Reservation. The sludge from this facility is transported to the new Carter Wastewater Treatment
Facility for dewatering with the Carter sludge. Final disposal is to a municipal solid waste landfill.
Facility/Site Information
Next, I asked some background questions. Unless noted otherwise, Bruce Johnson (Utility Manager) provided the responses in the table below.
Have any bypasses or overflows happened at the plant or in the collection system in the last year?
Industrial Users Are there any plans for renovation or additional equipment to allow for increased wastewater flow? Is there currently any portion of the treatment train that is nonoperational? Do you accept waste from septage haulers? Operation schedule?
How do you manage your biosolids? Responsible official WWTP Design Capacity & Average Daily Flow
WWTP Approx. # of residents served
Contributing (or shared) Jurisdictions Do you use in-house laboratory analyses? CBI concerns?
Stone Lake WWTP: Yes, this past spring due to snow melt. Actiflow system (phosphorus treatment) couldn't keep up, had to bypass (did not result in effluent limit exceedances). Carter WWTF: No. No, for both facilities. Stone Lake WWTP: early stages of plant design for new plant (activated sludge plant). Carter WWTF: No. No, for both facilities (response provided by Jennifer Spencer).
No, for both facilities.
7am-5pm, Monday-Thursday, then operators on call (response provided by Jennifer Spencer). Landfill disposal. Bruce Johnson, for both facilities. Stone Lake WWTP: Design ~ 62,000 gallons per day ("GPD"). Carter WWTF: ~ 72,000 GPD. Average flow of 20,000-25,000 GPD for both facilities. Stone Lake WWTP: 156 connections. Carter WWTF: 68 connections. None, for both facilities. No, except pH and dissolved oxygen ("DO"), for both facilities (response provided by Jennifer Spencer). No.
4 of 33
Stone Lake WWTP and Carter WWTF Inspection Date: 09/06/2023
Locations Location/Area Opening Conference/Interview Non-DMR Reporting Effluent Limit Exceedance Review Self Monitoring O&M Flow Monitoring SSOs Pretreatment Physical Inspection Stone Lake WWTP Physical Inspection Carter WWTF Closing Conference
Description
FCPC Utilities office near the Stone Lake WTTP
Stone Lake WTTP Carter WWTF FCPC Utilities office near the Stone Lake WTTP
SECTION II - OBSERVATIONS
Location: Interview/Non-DMR Reporting
Observation #: DM1-OB-001
Date: 09/06/2023
Unless noted otherwise, Bruce Johnson (Utility Manager) provided the responses (in bold) below.
Stone Lake WWTP: 1. Operation & Maintenance Plan Report submitted by January 31, 2023 (Part l.D.3.b)? Yes. 2. Mercury Minimization Program Status Report submitted by January 31, 2023 (Part I.D.4)? Yes. 3. Phosphorus Operational Evaluation Report submitted by June 30, 2020 (Part I.D.7)? Yes. 4. *Wetland Monitoring* submitted by August 31, 2021 and, biannually thereafter (Part 1.D.9)? Yes. 5. Wetland Mussel Study submitted by October 1 annually (Part I.D.10)? Yes.
Carter WWTF: 1. Phosphorus Operational Evaluation Report submitted by June 30, 2020 (Part 1.D.3) ? Yes. 2. Mercury Minimization Program Status Report submitted by January 31, 2023 ( Part 1.D.4)? Yes. 3. Operation & Maintenance Plan Report submitted by January 31, 2023 (Part l.D.5.b)? Yes. 4. *Wetland Monitoring* submitted by August 31, 2021 and biannually thereafter (Part I.D.9)? Yes. 5. Wetland Mussel Study submitted by October 1 annually (Part I.D.10)? Yes.
*Additional Ammonia N monitoring conducted between May 15 and June 15, and report submitted every other year beginning in 2021? Yes.
Are the records and reports maintained by the permittee for at least 3 years? Yes.
Location: Interview/Effluent Limit Exceedance Review
Observation #: DM1-OB-002
Date: 09/06/2023
Unless noted otherwise, Bruce Johnson (Utility Manager) provided the responses (in bold) below. See summary of effluent limit exceedances from October 2020 to June 2023 in Appendix 2 - Document Log).
5 of 33
Stone Lake WWTP and Carter WWTF Inspection Date: 09/06/2023
Stone Lake WWTP: E.coli Effluent Limit Exceedances: May 2023, June 2023: due to UV system computer circuit board issue. UV system repaired and placed back in service in the first week of August 2023. Also, had E.coli violations in July 2023. No issues in since UV system was placed back online in August (response provided by Jennifer Spencer).
May 2022 E.coli Effluent Limit Exceedance: Due to UV bulb issue (response provided by Nate Guldan).
Carter WWTF: April 2023 Carbonaceous Biochemical Oxygen Demand ("CBOD") Effluent Limit Exceedance: based on my review of the April 2023 Discharge Monitoring Report ("DMR"), the CBOD effluent limit exceedance appears to be data entry error (reported >5 mg/l, should have been reported as 5 mg/l).
Have all exceedances of daily effluent limits been orally reported to EPA within 24 hours: Yes.
Location: Interview/Self Monitoring
Observation #: DM1-OB-003
Date: 09/06/2023
Unless noted otherwise, Bruce Johnson (Utility Manager) provided the responses (in bold) below.
Stone Lake WWTP: Are the influent and effluent sampling locations as specified in permit and representative of the waste stream? Yes, influent samples collected before the fine screen (response provided by Jennifer Spencer). Effluent samples collected right after UV disinfection.
How are effluent composite samples collected? Autosampler, time-based.
Are composite samples cooled to <4C to properly preserve them during the compositing period? Yes. Are temperature results recorded? Yes (response provided by Jennifer Spencer).
Are all grab samples cooled with ice, gel packs or refrigerated to <6C from the time of collection until analysis including shipping time? Yes.
Carter WWTF: Are the influent and effluent sampling locations as specified in permit and representative of the waste stream? Yes, influent samples collected before screen; effluent samples collected before after UV disinfection, before aeration steps.
How are effluent composite samples collected? Autosampler, time-based.
Are composite samples cooled to <4C to properly preserve them during the compositing period? Yes. Are temperature results recorded? Yes.
Are all grab samples cooled with ice, gel packs or refrigerated to <6C from the time of collection until analysis including shipping time, if applicable? Yes.
I reviewed laboratory sampling/bench sheets and observed that they include flow, pH, and DO information, including the dates, times, and location of sampling. However, the sheets do not include the time of analysis and name(s) of persons collecting and analyzing samples.
6 of 33
Stone Lake WWTP and Carter WWTF Inspection Date: 09/06/2023
Location: Interview/O&M
Observation #: DM1-OB-004
Date: 09/06/2023
Unless noted otherwise, Bruce Johnson (Utility Manager) provided the responses (in bold) below.
Stone Lake WWTP: Are all treatment units operable? Yes (response provided by Jennifer Spencer).
Does a maintenance record system exist and include: As-built drawings - Yes. Maintenance history - Yes (response provided by Jennifer Spencer). Maintenance costs - Yes. Records of equipment repair and timely return to service - Yes. SOP for operation and maintenance of each item of major equipment - Yes, bound copies of all major equipment and sampling procedures. Operation and maintenance manual is available - Yes.
Are qualified operating staff employed to carry out the operations at the facility? Yes, three certified operators for wastewater, and two in training.
Is sludge wasted from treatment system at proper time intervals to maintain process efficiency? Yes, once every two months.
On a regular basis, do operators monitor the key operating parameters and conducting the necessary adjustments to meet the limits of the Permit? Yes, operators conduct routine visual assessments and test for sludge characteristics, such as mixed liquor and suspended solids.
Does the wastewater treatment facility have an alarm system for all essential equipment? Yes, SCADA with many alarms, including high and low tank levels, and power outage (response provided by Jennifer Spencer).
Are alarms sent to qualified personnel who can respond immediately to remedy the problem? Yes, via email or call to on-call operator, then a call chain (to Jennifer Spencer and Nate Guldan; response provided by Jennifer Spencer).
Are routine and preventive maintenance scheduled performed and recorded? Working on routine and preventive maintenance process improvement and recording. Implementing new work order process (response provided by Jennifer Spencer).
Does the facility maintain written procedures for responding to emergencies such as power failures, floods, fires, and other natural disasters? Yes (response provided by Jennifer Spencer).
Is a logbook kept which documents all plant activities on a daily basis? Yes, use many log sheets for different stations. Also use some notebooks (response provided by Jennifer Spencer). See Appendix 2 - Document Log, pages 26-28, for examples of log sheets.
Does the facility maintain an inventory of spare parts, either at the facility or close by, sufficient to keep all of its treatment units operational? Not yet, to be implemented with new work order system.
Does the facility have standby power for all treatment units? Yes, generator at the plant, and a portable generator for lift station 2. Lift station 1 has backup generator.
Collection System Info: Miles of conveyance: 11,650 feet of force main; 46,700 feet of gravity sewers.
7 of 33
Stone Lake WWTP and Carter WWTF Inspection Date: 09/06/2023
Number of lift stations: 2. Residents served: About 150 connections, not sure about the number of residents.
Carter WWTF: Are all treatment units operable? Yes (response provided by Jennifer Spencer).
Does a maintenance record system exist and include: As-built drawings - Yes. Maintenance history - Yes (response provided by Jennifer Spencer). Maintenance costs - Yes. Records of equipment repair and timely return to service - Yes. SOP for operation and maintenance of each item of major equipment - Yes, bound copies of all major equipment and sampling procedures. Operation and maintenance manual is available - Yes.
Are qualified operating staff employed to carry out the operations at the facility? Yes, three certified operators for wastewater, and two in training.
On a regular basis, do operators monitor the key operating parameters and conducting the necessary adjustments to meet the limits of the Permit? Yes, operators conduct routine visual assessments and test for sludge characteristics, such as mixed liquor and suspended solids.
Does the wastewater treatment facility have an alarm system for all essential equipment? Yes, SCADA with many alarms, including high and low tank levels, and power outage (response provided by Jennifer Spencer).
Are alarms sent to qualified personnel who can respond immediately to remedy the problem? Yes, via email or call to on-call operator, then to call chain (to Jennifer Spencer and Nate Guldan; response provided by Jennifer Spencer).
Are routine and preventive maintenance scheduled performed and recorded? Working on routine and preventive maintenance process improvement and recording. Implementing new work order process (response provided by Jennifer Spencer).
Does the facility maintain written procedures for responding to emergencies such as power failures, floods, fires, and other natural disasters? Yes (response provided by Jennifer Spencer).
Is a logbook kept which documents all plant activities on a daily basis? Yes, use many log sheets for different stations. Also use some notebooks (response provided by Jennifer Spencer). See Appendix 2 - Document Log, for examples of log sheets.
Does the facility maintain an inventory of spare parts, either at the facility or close by, sufficient to keep all of its treatment units operational? Not yet, to be implemented with new work order system.
Does the facility have standby power for all treatment units? Yes, backup generator at the plant, one of two lift stations has a backup generator, the other needs a portable generator (Lift Station#2 only serves a few houses).
Collection System Info: Miles of conveyance: 29,548 feet of force main; 49,558 feet of gravity sewers. Number of lift stations: 2. Residence served: About 68 connections, not sure about the number of residents.
8 of 33
Stone Lake WWTP and Carter WWTF Inspection Date: 09/06/2023
Location: Interview/Flow Monitoring
Observation #: DM1-OB-005
Date: 09/06/2023
Unless noted otherwise, Bruce Johnson (Utility Manager) provided the responses (in bold) below.
Stone Lake WWTP: What type of influent meter is used? mag meter. What type of effluent meter is used? mag meter.
Are influent and effluent flow measuring devices professionally calibrated, at least once per year? Yes, annually in September (response provided by Jennifer Spencer).
Carter WWTF: What type of influent meter is used? mag meter. What type of effluent meter is used? mag meter.
Are influent and effluent flow measuring devices professionally calibrated, at least once per year? Yes, annually in September (response provided by Jennifer Spencer).
Location: Interview/SSOs
Observation #: DM1-OB-006
Date: 09/06/2023
Bruce Johnson (Utility Manager) provided the responses (in bold) below. See Appendix 2 - Document Log, for SSO notification procedures.
Stone Lake WWTP: Have there been any backups or overflows in the sanitary sewer collection system, including pump stations, manholes and piping since the last inspection? No.
Basement backup complaints over the last year? No, other than issues with the individual septic systems.
Carter WWTF: Have there been any backups or overflows in the sanitary sewer collection system, including pump stations, manholes and piping since the last inspection? No.
Basement backup complaints over the last year? No.
Location: Interview/Pretreatment
Observation #: DM1-OB-007
Date: 09/06/2023
Bruce Johnson (Utility Manager) provided the responses (in bold) below.
Stone Lake WWTP: Any industrial users? No.
Carter WWTF: Any industrial users? No.
9 of 33
Stone Lake WWTP and Carter WWTF Inspection Date: 09/06/2023
Location: Physical Inspection of Carter WWTF
Observation #: DM1-OB-008
Date: 09/06/2023
Weather: rainy
Carter WWTF: Physical inspection observations are documented in the Photo Log (see Appendix 1). The physical inspection started: 2:15 PM (CT) and ended: 2:48 PM (CT). The final outfall was not accessible for observation. After the physical inspection of the Carter WWTF, we returned to the Stone Lake WWTP to conduct the physical inspection of the Stone Lake WWTP.
Photo(s)
1.FCPC0302.JPG 2.FCPC0303.JPG 3.FCPC0304.JPG 4.FCPC0305.JPG 5.FCPC0306.JPG 6.FCPC0307.JPG 7.FCPC0308.JPG 8.FCPC0309.JPG 9.FCPC0310.JPG 10.FCPC0311.JPG
Location: Physical Inspection of Stone Lake WWTP
Observation #: DM1-OB-009
Date: 09/06/2023
Weather: rainy
Stone Lake WWTP: Physical inspection observations are documented in the Photo Log (see Appendix 1). The physical inspection started at: 3:10 PM (CT) and ended at: 3:30 PM (CT). The final outfall was not accessible for observation. After the physical inspection of the Stone Lake WWTP, we returned to FCPC Utilities office for the closing conference.
Photo(s)
1. FCPC0314.JPG 2. FCPC0315.JPG 3. FCPC0316.JPG 4. FCPC0317.JPG 5. FCPC0318.JPG 6. FCPC0319.JPG 7. FCPC0320.JPG 8. FCPC0321.JPG 9. FCPC0322.JPG 10. FCPC0323.JPG
SECTION III - SAMPLING ACTIVITIES AND ANALYTICAL RESULTS No sampling was conducted.
10 of 33
Stone Lake WWTP and Carter WWTF Inspection Date: 09/06/2023
SECTION IV - AREAS OF CONCERN
Preliminary Areas of Concern may not be in sequential order. The presentation of Areas of Concern does not constitute a formal compliance determination or violation.
AOC Reference #: DM1-OB-002
Location: Interview/Effluent Limit Exceedance Review
Regulation and/or Permit Requirement
Permit Part I.A. - Final Effluent Limitations and Monitoring Requirements.
AOC:
Stone Lake WWTP:
E.coli Effluent Limit Exceedances: May 2023, June 2023: due to UV system computer circuit board issue. UV system repaired and placed back in service in the first week of August. Also, had E.coli violations in July 2023. No issues in since UV system was placed back online in August.
Carter WWTF:
April 2023 CBOD Effluent Limit Exceedance: based on review of the April 2023 DMR, the CBOD effluent limit exceedance appears to be data entry error (reported >5 mg/l, should have been reported as 5 mg/l).
AOC Reference #: DM1-OB-003
Location: Interview/Self Monitoring
Regulation and/or Permit Requirement
Permit Part II.B.1. - Proper O&M. Proper operation and maintenance also include adequate laboratory controls and appropriate quality assurance procedures.
AOC:
Stone Lake WWTP and Carter WWTF:
Laboratory sampling/bench sheets do not include the time of analysis and name(s) of persons collecting and analyzing samples (see Appendix 2 - Document Log, pages 26-28, for examples).
AOC Reference #: DM1-OB-004
Location: Interview/O&M
Regulation and/or Permit Requirement
1) Permit Part I.D.3.a.G.- Inventory and assessment of fixed assets. 2) Permit Part I.D.3.b.B.- Description of inspections and maintenance activities conducted and
corrective actions taken during the previous year.
AOC:
Stone Lake WWTP and Carter WWTF:
1) Facility does not maintain an inventory of spare parts.
2) Facility does not have a system to record routine and preventive maintenance performed.
11 of 33
Stone Lake WWTP and Carter WWTF Inspection Date: 09/06/2023 SECTION V - CLOSING CONFERENCE AND FOLLOW UP Closing Conference I began the closing conference with FCPC personnel at 03:30 PM (CT) on 09/06/2023. During the closing conference, I discussed the preliminary observations and Areas of Concern identified during the inspection and summarized above. Preliminary Areas of Concern have not yet been evaluated for a formal compliance determination. I reviewed the timing for completing the inspection report and went over the documents received during the inspection (See Appendix 2 - Document Log). I received copies of records requested prior to the inspection. I asked if there were any questions before concluding the inspection. FCPC representatives asked for an appropriate contact at EPA to discuss permit issues. I referred them to the EPA Region 5 Permits Program and provided contact information. With no further questions, we concluded the inspection at 03:45 PM (CT). Follow Up No follow up was required after exiting the facility on 09/06/2023. Communication Log No additional information received by EPA Region 5 after exiting the Facility on 09/06/2023.
SECTION VI - LIST OF APPENDICES 1. Photo Log 2. Document Log
12 of 33
Stone Lake WWTP and Carter WWTF Inspection Date: 09/06/2023
APPENDIX 1: PHOTO LOG
Influent Autosampler (ISCO)
09/06/2023 02:18 PM
No CBI
Physical Inspection Carter WWTF
Noted thermometer with heat sink.
No PII
FCPC0302.JPG Photographer: Dean Maraldo Geographic coordinates not available
Headworks - Vortex screen
09/06/2023 02:18 PM
No CBI
Physical Inspection Carter WWTF
No PII
FCPC0303.JPG Photographer: Dean Maraldo Geographic coordinates not available
13 of 33
Stone Lake WWTP and Carter WWTF Inspection Date: 09/06/2023
Aeration Basin (Northern basin)
FCPC0304.JPG
09/06/2023 02:20 PM
No CBI
No PII Photographer: Dean Maraldo
Physical Inspection Carter WWTF
Geographic coordinates not available
One of three aeration basins (only one needed at time of inspection, based on flows)
Sludge digestor
09/06/2023 02:21 PM
No CBI
Physical Inspection Carter WWTF
One of two digestors.
No PII
FCPC0305.JPG Photographer: Dean Maraldo 45.40133833, -88.62643666
14 of 33
Stone Lake WWTP and Carter WWTF Inspection Date: 09/06/2023
Aeration blowers
09/06/2023 02:22 PM
No CBI
No PII
Physical Inspection Carter WWTF
Blowers (4) for aeration basins and digestors.
FCPC0306.JPG Photographer: Dean Maraldo 45.40133166, -88.62624166
Clarifier
FCPC0307.JPG
09/06/2023 02:23 PM
No CBI
No PII Photographer: Dean Maraldo
Physical Inspection Carter WWTF
45.40145833, -88.62622499
One of two clarifiers. Only one clarifier in use at the time of inspection, based on flows.
15 of 33
Stone Lake WWTP and Carter WWTF Inspection Date: 09/06/2023
Clarifier
FCPC0308.JPG
09/06/2023 02:24 PM
No CBI
No PII Photographer: Dean Maraldo
Physical Inspection Carter WWTF
45.40145833, -88.62622499
Noted effluent trough appeared clear and free of debris.
UV Treatment System
09/06/2023 02:25 PM
No CBI
Physical Inspection Carter WWTF
UV treatment consists of eight bulbs.
No PII
FCPC0309.JPG Photographer: Dean Maraldo 45.40145833, -88.62622499
16 of 33
Stone Lake WWTP and Carter WWTF Inspection Date: 09/06/2023
Effluent Autosampler (ISCO)
FCPC0310.JPG
09/06/2023 02:25 PM
No CBI
No PII Photographer: Dean Maraldo
Physical Inspection Carter WWTF
45.40145833, -88.62622499
Noted thermometer with heat sink. Effluent tubing clean and clear of debris.
Chemical feed system
FCPC0311.JPG
09/06/2023 02:27 PM
No CBI
No PII Photographer: Dean Maraldo
Physical Inspection Carter WWTF
45.40145833, -88.62622499
Chemical feed for aluminum sulfate and sodium hydroxide.
17 of 33
Stone Lake WWTP and Carter WWTF Inspection Date: 09/06/2023
Influent Autosampler (ISCO)
09/06/2023 03:13 PM
No CBI
Physical Inspection Stone Lake WWTP
No PII
FCPC0314.JPG Photographer: Dean Maraldo Geographic coordinates not available
Headworks - fine screen
09/06/2023 03:14 PM
No CBI
Physical Inspection Stone Lake WWTP
No PII
FCPC0315.JPG Photographer: Dean Maraldo Geographic coordinates not available
18 of 33
Stone Lake WWTP and Carter WWTF Inspection Date: 09/06/2023
Sand filter beds
FCPC0316.JPG
09/06/2023 03:16 PM
No CBI
No PII Photographer: Dean Maraldo
Physical Inspection Stone Lake WWTP
45.56948, -88.85437499
Three sand filter beds. Beds appeared well maintained. Jennifer Spencer said sand filter beds are maintained weekly.
Actiflo treatment unit
FCPC0317.JPG
09/06/2023 03:18 PM
No CBI
No PII Photographer: Dean Maraldo
Physical Inspection Stone Lake WWTP
45.56948, -88.85437499
According to the manufacturer (Veolia), the Actiflo system provides high-rate clarification based on ballasted flocculation using microsand and polymers.
19 of 33
Stone Lake WWTP and Carter WWTF Inspection Date: 09/06/2023
UV treatment system
09/06/2023 03:19 PM
No CBI
Physical Inspection Stone Lake WWTP
No PII
FCPC0318.JPG Photographer: Dean Maraldo 45.56948, -88.85437499
Effluent Autosampler (ISCO)
FCPC0319.JPG
09/06/2023 03:19 PM
No CBI
No PII Photographer: Dean Maraldo
Physical Inspection Stone Lake WWTP
45.56948, -88.85437499
Noted thermometer with heat sink. Effluent tubing clean and clear of debris.
20 of 33
Stone Lake WWTP and Carter WWTF Inspection Date: 09/06/2023
Effluent flow meter and tap
09/06/2023 03:21 PM
No CBI
Physical Inspection Stone Lake WWTP
No PII
FCPC0320.JPG Photographer: Dean Maraldo 45.56948, -88.85437499
Operations whiteboard with operator notes
09/06/2023 03:21 PM
No CBI
No PII
Physical Inspection Stone Lake WWTP
FCPC0321.JPG Photographer: Dean Maraldo 45.56948, -88.85437499
21 of 33
Stone Lake WWTP and Carter WWTF Inspection Date: 09/06/2023
Phosphorus sludge tanks (2)
09/06/2023 03:22 PM
No CBI
Physical Inspection Stone Lake WWTP
No PII
FCPC0322.JPG Photographer: Dean Maraldo 45.56948, -88.85437499
SCADA Display
09/06/2023 03:25 PM
No CBI
Physical Inspection Stone Lake WWTP
No PII
FCPC0323.JPG Photographer: Dean Maraldo 45.56948, -88.85437499
22 of 33
Stone Lake WWTP and Carter WWTF Inspection Date: 09/06/2023
APPENDIX 2: DOCUMENT LOG Documents Received
Document Name
Contains
CBI or
PII
Date Received
Pages
Emails reporting treatment and reporting issues to EPA No
9/6/2023
5
(12/2022-5/2023)
Carter Utility maps and plans
Yes* 9/6/2023
207
Stone Lake Utility maps and plans
Yes* 9/6/2023
687
SSO notification procedures
No
9/6/2023
1
Chain of custody forms (June-August 2023)
No
9/6/2023
455
Examples of operator records and lab forms
No
9/6/2023
6
Operator certificates
No
9/6/2023
8
Carter WWTF facility specifications and drawings
Yes* 9/6/2023
>1000
Carter WWTF generator Info
No
9/6/2023
34
NPDES permits and application records for Carter WWTF No
9/6/2023
146
and Stone Lake WWTP
DMRs (August 2022 - June 2023)
No
9/6/2023
89
Mercury Status Reports 2022 (Stone Lake WWTP and
No
9/6/2023
32
Carter WWTF)
O&M Reports 2022 (Stone Lake WWTP and Carter WWTF) No
9/6/2023
15
Phosphorus Sludge Reports 2022 (Stone Lake WWTP and No
9/6/2023
6
Carter WWTF)
Wetland Mussel Reports 2022 (Stone Lake WWTP and No
9/6/2023
14
Carter WWTF)
EPA ECHO Effluent Limit Exceedance Summary Report
No
Provided by EPA 1
(10/2020-6/2023)
* Documents not included in report to protect against disclosure of potentially sensitive infrastructure locations.
Attached to Report? No
No No Yes No Yes No No No No
No No
No No
No
Yes
23 of 33
Effluent Limit Exceedances Report
W10058424: CRANDON RECIRCULATING SAND FILTER/STONE LAKE WWTP, CRANDON, WI 54520 Monitoring Period Date Range: 10/01/2020 to 06/30/2023
Exceedance Details
Monitoring
Period Date
10/31/2020 3/31/2021 5/31/2022 5/31/2022 7/31/2022 5/31/2023 5/31/2023 6/30/2023 6/30/2023
Outfall 1 1 1 1 1 1 1 1 1
Parameter Description Phosphorus, total (as P) pH E. coil E. coil Oxygen, dissolved (DO) E. coil E. coli E. coil E. coil
Limit Type MO AVG MINIMUM 3ODA GM DAILY MX DAILY MN 3ODA GM DAILY MX 3ODA GM DAILY MX
DMR Value 0.63 5.3 217 690 3.6 373 1400 1950 2500
dmr_valu DMR
e_qualifie Value
r
Unit
=
mg/L
=
SU
=
#/100mL
=
#/100mL
=
mg/L
=
#/100mL
=
f/100mL
>
#/100mL
=
#h100mL
Limit Value 0.6 6 126 410 4 126 410 126 410
Limit Value Qualifier <=
% Exceedance 5
<=
72
<=
68
>=
10
<=
196
<=
241
<=
Limit Violation
<=
510
Stone Lake WWTP and Carter WWTF Inspection Report
24 of 33
Effluent Limit Exceedances Report W10058432: FCPC CARTER WTF
Monitoring Period Date Range: 10/01/2020 to 06/30/2023
Exceedance Details
Monitoring
Period Date
3/31/2021 4/30/2023
Outfall 1 1
Parameter Description pH BOD, carbonaceous, 05 day, 20 C
Limit Type MAXIMUM MO AVG
DMR Value 8.8 5
DMR
dmr_value_ Value
qualifier Unit
=
SU
mg/L
Limit Value 8.5 20
Limit Value Qualifier <= <=
% Exceedance Limit Violation
Stone Lake WWTP and Carter WWTF Inspection Report
25 of 33
Sample Temperature
Forest County Potawatomi Community Carter Wastewater Treatment Facility
MONTH _ j/
YEAR P
DATE
_________
Time
________
L-3
,i-Z3
i-K--7--3
-1-
_______
Ti -;'y_7ji?
7-2S-2%
-2-2?
lw 7._ 1
c')
Co 7
7'.I7
7is
Operator
________
/
,r/c4 yv/~jJ 'p,/f/I
tnfluent
Influent
Sample Temp. Sampler Temp.
________
e4+
4'4(
________
J kIf
Influent P.H.
-
_____
Effluent P.H.
_____ _____ _____
______ __________
3(s -J
vJcH LJ
vi/SJ1
3/5H 'ii
__________ __________
U
________
Z)
______
______
?1
_____
z'18
______
7S/
_____
zS(
Effluent D.O.
________
1L7(
________
r1L
LI _ 2(
________
________
S.iO
Effluent
Effluent
Sample Temp. Sampler Temp
________
________
7.f
_______
22 _________
__________
__________
17 __________
-_
_________
_________
________
________
________
22
Stone Lake WWTP and Carter WWTF Inspection Report
26 of 33
Stone Lake WWTP and Carter WWTF Inspection Report
30 of 33
Stone Lake WWTP and Carter WWTF Inspection Report
28 of 33
Stone Lake WWTP and Carter WWTF Inspection Report
27 of 33
Stone Lake WWTP and Carter WWTF Inspection Report
29 of 33
Stone Lake WWTP and Carter WWTF Inspection Report
31 of 33
Stone Lake WWTP and Carter WWTF Inspection Report
32 of 33
Sanitary Sewer Overflow (SSO) Procedure
In the event of any SSO, please follow the below steps in compliance with the NPDES Discharge Permit:
1. Notify immediate supervisor of event 2. Supervisor will notify the EPA in accordance with the NPDES permit:
a. Report any noncompliance which may endanger health or the environment, within 24 hours from the time the permittee becomes aware of the circumstances by calling 312886-6106. A written submission shall also be provided within 5 days of the time the permittee becomes aware of the circumstances to address mentioned in the permit.
b. Written submission shall contain a description of the noncompliance and its cause; the period of noncompliance, including exact dates and times; if the noncompliance has not been corrected; the anticipated time it is expected to continue; and steps taken or planned to reduce, eliminate, and precent recurrence of the noncompliance.
Stone Lake WWTP and Carter WWTF Inspection Report
33 of 33