CLEAN AIR ACT INSPECTION REPORT Alter Metal Recycling, Eau Claire, Wisconsin
Scott Connolly, Environmental Engineer AECAB (IL/IN)
Nathan Frank, Section Chief AECAB (IL/IN)
File
BASIC INFORMATION
Facility Name: Alter Metal Recycling
Facility Location: 3532 White Ave, Eau Claire, Wisconsin 54703
Date of Inspection: October 23, 2018
EPA Inspectors: 1. Scott Com101ly, Environmental Engineer 2. Jason Schenandoah, Environmental Engineer
Other Attendees 1. Greg O'Leary, Regional Director of Operations, Alter Metal Recycling 2. Steve Nockerts, Facility Manager, Alter Metal Recycling 3. Jay Hasart, Operations Supervisor, Alter Metal Recycling 4. Kyle Erikson, Non-Ferrous Facility Manager, Alter Metal Recycling 5. Darren Engbring, Regional Environmental Manager, Alter Metal Recycling (phone)
Contact Email Address: Darren.engbring@altertrading.com
Purpose of Inspection: To determine compliance with the Clean Air Act
Facility Type: Metal Shredding and Recycling Facility
Regulations Central to Inspection: 40 C.F.R. Part 82, Subpart F, Recycling and Emissions Reductions
Arrival Time: 4:00 pm Departure Time: 5:20 pm
Inspection Type: IZI Unannounced Inspection
D Announced Inspection
OPENING CONFERENCE
IZI Credentials Presented IZI CBI warning to facility provided
The following information was obtained verbally from inspection attendees unless otherwise noted.
Process Description: The facility purchases processes scrap metal received by truck from feeder yards, industrial clients and from the general public. Scrap inspectors check the incoming metal items for nonconforming material during unloading into scrap piles, depending on material and available space. Then the shredder processes the piles postconsumer ferrous and non-ferrous scrap, industrial scrap, and vehicles. Cranes load scrap metal onto a conveyor, which feeds the metal into the harnmermill shredder. The harnmermill is equipped with an automatic water injection system, which sprays water into the shredder to reduce dust and to cool the metal. Shredded metal exits the shredder and is fed through a magnetic separator, which separates non-magnetics from ferrous metal. Fluff, including non-ferrous metals are collected and processed in the nonferrous separation downstream to remove non-metallic components.
Staff Interview: Facility staff stated that suppliers bringing appliances and vehicles to the facility must sign a "Material Supplier Certification" contract prior to acceptance by Alter Metal Recycling. The facility typically recovers refrigerants from vehicles and appliances but Alter Metal Recycling will not pay suppliers for items that contain refrigerants. The facility operates a 4000-horsepower electric hammermill shredder that process about 30-40% vehicles.
TOUR INFORMATION
EPA toured the facility: Yes
Data Collected and Observations: At least one intact air conditioner appliance was observed in the scrap pile. Several other appliances were observed that had not evidence of proper recovery. Appliances appeared to be from a roll of container that may have come from a feeder yard and facility staff confirmed this observation. In the refrigerant reclamation area, the facility separates refrigerants into Rl 34a,
Page 2 of 4
Rl2 and R22 containers. Several intact appliances were located in the reclamation area, ready for refrigerant recovery. Photos: were taken during the inspection.
A photo log is attached in Appendix A. Field Measurements: were not taken during this inspection.
CLOSING CONFERENCE
Requested documents: Material Supplier Certification Contract (1 copy obtained) United Refrigeration Refrigerant Disposal Receipts from May, July and August 2018 (1 copy obtained)
Compliance Assistance: Alter Trading was informed that several appliances were accepted but showed evidence that proper recovery had not occurred. Concerns: Several evacuated appliances had evidence that proper recovery did not occur, indicating that verification of proper recovery may not be occurring and the presence of intact appliances in the scrap pile indicates that venting of refrigerants is likely occurring during the disposal process.
SIGNATURES
Page 3 of 4
Facility Name: Alter Metal Recycling Facility Location: 3532 White Ave, Eau Claire, Wisconsin Date of Inspection: October 23, 2018
APPENDICES AND ATTACHMENTS
I.
Appendix A: Digital Image Log
Page 4 of 4
Facility Name: Alter Metal Recycling Facility Location: 3532 White Ave, Eau Claire, Wisconsin Date of Inspection: October 23, 2018
APPENDIX A: DIGITAL IMAGE LOG
1. Inspector Name: Scott Connolly
3. Company/Facility Name: Alter Metal Recycling
5. Number of Images:
9
2. Date of Inspection:
October 23, 2018
4. Street Address, City, State:
3532 White Ave, Eau Claire, Wisconsin
6. Archival Record Location:
Photos are located on the attached CD labelled "Alter Metal Recycling Eau Claire, WI Inspection Photos 10/23/2018"
Image Number 1
2
3
4
File Name PA230012.JPG PA230013.JPG PA230014.JPG PA230015.JPG
Date and Time 10/23/2018 16:23 10/23/2018 16:27 10/23/2018 16:31 10/23/2018 16:34
Latitude and Longitude 44.835, 91.474444
44.835, 91.474444
44.835, 91.474444
44.835, 91.474444
5
PA230016.JPG 10/23/2018 16:36 44.835,
91.474444
6
PA230017.JPG 10/23/2018 16:39 44.835,
91.474444
7
PA230018.JPG 10/23/2018 16:39 44.835,
91.474444
8
PA230019.JPG 10/23/2018 16:44 44.835,
91.474444
9
PA230020.JPG 10/23/2018 16:46 44.835,
91.474444
Description of Image
Non-accepted materials sign at scale house
Intact air conditioning unit found in the scrap pile. Shredder, infeed and outfeed conveyors.
Partially crushed freezer unit refrigeration lines that appeared broken and had no evidence ofrefrigerant recovery. Refrigerator with cut lines located in the scrap pile Car depollution rack
Refrigerant recovery equipment located at the car depollution area. Appliance refrigerant recovery area
Refrigerant tanks next to refrigerant recovery area
Appendices Page 1 of 1