Document KRw5DzxYjnLNMdyr4GvJXOJL6
To: B. Coopersmith
Location:
NA
From: Location: Extension:
H. C. Gaffney MCG
Subject:
MONTHLY REPORT
Reference:
Date: September 28, 19 84
Copy to: F. Anderson J. F. Daly J. S. Druzbacky R. L. Johnson F. F. Loffelman S . M. Lustig C . G. Neumann M. Odian
I. SAFETY & HEALTH
A. The plant has operated 4672 days (thru 9/28) without a disabling injury.
B. There were no recordable injuries during this period. Y.T.D. I.E.A. is 5.04
C. The latest blood lead levels for 25 employees (all but office personnel ) are:
50 ug Pb/100 grams blood or above
40 - 49 Below 40 % below 50 Average
/
SEPT.
10 13 92 39
LAST 0
12 13 100% 37
6 Mos. average
2 11 15 93 36
The entire list of blood leads for September were up leading to the conclusion that the test procedure was slightly defective.
We will watch closely, the October results.
. PRODUCTION & SHIPMENTS
ACTUAL SEPT.
EST. OCT.
EST. NOV.
of Budgeted Rate
Stabilizers Litharge
Plant total
10 2 92 110 112
10 5 98
118 124
120
NA 839 REV. 4-82
4-82
CYW1 1-000167
2- -
II. PRODUCTION & SHIPMENTS (continued)
SHIPMENTS 3c pounds
Stabilizers Litharge
ACTUAL SEPT .
EST. OCT.
EST. NOV.
525 490 625 0 0 20
III. INVENTORY
Finished Goods Support Goods Plant totals
END OF AUG END OF SEPT END OF OCT END' OF NOV
k$ DOS k$
DOS k$
DOS k$
DOS
171 21 154
21 200
21 220
32
396 48 308
42 300
31 250
36
567 69 462
6 3 500
52 470
68
IV. TECHNICAL
A. EXTRUDATES
A preliminary sales brochure has been produced and issued. Draft MSDS's have been issued. The first commercial shipment of Cyastab 1800 - 123c lbs- was shipped to Flex Corp.
A 40k lb order for Cerrock will be shipped the week of
10/8.
B. PPG
We are still awaiting the sample of Lead Cyanamid from BASF. When received, we will send a portion to PPG for con firmation that it is the desired product before doing any lab work to duplicate it.
CYWI 1-000168
3
IV. TECHNICAL ( continued)
C. PACKARD ELECTRIC
Although we have Packard's compounding ingredients, we we do not yet have the formulation in which they are to be used. Bob Slapsak has promised to send the formulation.
D. TENNCEO
Test results thus far on Cyastab 523-0 versus Tribase XL-oiled in Tenneco's formulation are confusing. This may be due to the fact that the differences in VR readings we see are within the experimental error of the test.
So far it appears that, while 800-rO is superior to Tri base - oiled, 523-0 may be slightly inferior to Tribase XLoiled. We will make a 523-0 with Barium Stearate to see if that makes any difference.
E. GEORGIA- PACIFIC
Master Batches and stabilizers have been sent to Bridgewater for repeat Injection Molding & Izod impact testing
F. COMPLAINTS
There have been no new complaints received this month. The YTD total remains il, broken down as follows:
Quality
2
Shipping - Fault of trucker
3
Not justified
5
Development
1
V. GENERAL
A. Lead price contines to be volatile dropping from 28$ to 22*r and then up to 23C. St Joe and Amex on strike since 4/1 & 5/1 continue to operate at reduced levels with sal ary personnel. Asarco's Glover Smelter may strike on 9/30.
CYWl 1-000169
V. GENERAL (continued) A. We will have enough lead to carry us thru the end of the year. No problems anticipated after that. B. VISITORS M. Odian D. Kelly - Hazardous Materials State EPA inspection - No problem H. C. Gaffney
CYV\/t 1-000170