PROPOSED AGENDA MARCH 17, 1987 MEETING IMPLEMENTATION PROGRAM TASK GROUP PHASEOUT OF ASBESTOS-CONTAINING MATERIALS IN WORK PLACE CHEMICALS AND PLASTICS GROUP
1. Cal 1 to Order
2. Adoption of Agenda
3. Announcements
am*
IMP*TM' t
febtsM 'Ml m^idatuin {
^
4. Develop and Maintain C&P Standard Practices
4.1 Identification of Asbestos-Containing Materials
Standard practices covering this activity are primarily the responsibility of the Industrial Hygiene Group. Stan Clark is assigned lead responsibility and will report on proposed activities (see Footnote 1).
(*/***> to*TM#)
4.2 Replacement of Asbestos-Containing Insulation as Required to Maintain Structural and Functional Integrity
Perhaps CED can develop some criteria for establishing how to
recognize when the structural integrity of insulation has
deteriorated sufficiently to become a health hazard. George Elder
is assigned lead responsibility and will report on proposed
activities (see Footnote 1). (rW
t5
4.3 Removal. Modification, and/or Disposal of Asbestos-Containing Materials
Standard Practices covering this activity are also primarily the responsibility of the Industrial Hygiene Group. Stan Clark Is assigned lead responsibility and will report on proposed activities (see Footnote 1).
4.4 Use of Asbestos-Substitute Materials
4.4.1
George Elder has lead responsibility for establishing which asbestos-substitute materials are acceptable (health effectsj as well as functional acceptability shall be considered) and will report on proposed activities (see footnote 1).
UCC 015803
AGENDA (Cont'd)
-2-
COP -I pi/ C.0P-M tfr cpp-it. 4** (JmAV ^
dp-*I Lmpusivylt*
4.4.2
Rex Engle has lead responsibility for modifying the Valve and Piping Specifications to Include asbestos-substitute materials and will report on proposed activities (see Footnote 1).
-----
4.4.3 4.4.4
Clyde Neely has lead responsibility for revising the
i } '*
Pressure Vessel and Tank Specifications and will report on
proposed activities (see Footnote 1).
4 fr<? SMS OrrtMf
Purchase of Asbestos-Substitute Materials
Sharon Murphree has lead responsibility for the purchase of the substitute materials and will report on planned activities (see Footnote 1).
4.5 Variance Procedure to Cover Consideration of Uncommon Circumstances
Presumably each plant will use its own variance procedure; however, Ideas from the group on this subject will be solicited.
5. Conducting On-Site Seminars at Institute. Seadrift, Sistersvl11e. South Charleston, Taft, and Texas City
As Indicated In the Task Group's September 29, 1986, memorandum entitled "Proposed Technology Program In 1987 In Support of Existing Operations" (copy attached), we recognized the Importance of this activity since the cooperation of each location Is essential, to the success of the program. Clyde Neely will lead a discussion regarding this subject, with a consensus agreement on the desired program being the objective.
6. Other Business Items
6.1 Next Meeting Date
7. Adjournment
xxx 1) Proposed activities will Include preliminary outline of overall program
and associated schedule and budget. It may be appropriate to request that specialist directly responsible for doing the work be present.