Document KRpwza9pad0ak8ao143DXgaJK

" ' \ COMPANY CONFIDENTIAL . ANNISTON AROCLOR CLEAN-UP Engineering Parameters and Recommendations for Eliminating PCB Loss to the Environment I Johnnie Etheredge April 28, 1971 HONS 040181 Aroclor Removal Devices 1. \ Curbing around drumming and blending areas 2. Use buckets and pans for small leaks until repaired , 3. Use adsorbents to clean up spills -- Anniston uses Oil Dry (trade name) 4. Use buckets at sample ports 5. Do not use detergents for clean up 6. Segregate contaminated and uncontaminated water 7. Carbon towers to remove PCB from product HCl acid .6 Brink mist eliminators in off-gas lines drop PCB back into process 9. Condensers in off-gas lines, PCB recycled 10. Catch tanks in vapor lines 11. Drowning jets for vapors before emission to atmosphere 12. Keep vessels buttoned up 13* Use a sump in effluent line 14. Limestone pit -- HCl is present in effluent 15. Carbon adsorption of Aroclor from plant effluent. 16. Evaluation in progress -- Aroclor adsorption on a less expensive adsorbent v than carbon ' HONS 040182 / AROCLOR WASTE SUMP The'purpose of an Aroclor waste sump is to separate and collect entrained Aroclor from the waste effluent. Aroclor (PCB) existing as a second phase nay be removed from the waste stream through the use of a properly designed and operated sump. Leaks and spills are generally major contributors to effluent contamination. Because Aroclor is heavier than, and almost insoluble in water (solubility of 300 to 400 ppb), a correctly designed sump will efficiently collect entrained Aroclor. A sump presently used at Monsanto's Anniston, Alabama plant in the Aroclor manufacturing process effluent stream yields an effluent below Aroclor solubility level. The sump operates with an inlet stream flow of approximately 2S0 gpm containing KCl, Aroclors, process water and grit washed through the sewer system. The Aroclor removed (plus the solid grit material washed in through the sewer system) is collected in the bottom portion of the sump and pumped out at three month intervals, unless of course a major spill should occur. The sizing of a suntp is usually done by one of two methods or a mixture of both. The classical theoretical approach of determining settling velocities requires that both particle size and density must be known. The classical Approach becomes complex because each type of Aroclor has a different particle size and density. For this reason a generalized approach, applicable to the range of Aroclor products produced at Anniston, has been developed for sizing a sump to collect this range of Aroclors. The generalized approach combines these variables in a constant "k" called the sizing factor. The sizing factor along with the flow rate will give a surface area sufficient for settling Aroclor if the flow is evenly distributed Along the inlet end of the sump. Space availability, terrain^and other physi cal limitations can determine the width and length appropriate to the calcu lated surface area. Remember -- for efficient operation the inflow must be evenly distributed along the inlet end of the sump. F.R. Formula: S.A. * -1 '. - ' Where; ^_ 2 S.A. Surface area in ft. F.R. Flow rate in gallons per minute cal. ' k 1.66 Kin. ft.* " sizing factor HONS 040183 .. ' Example: Anniston sump design . F.R. * 250 gpm . \. ' gal. .. 250 min. Therefore: S.A. - 1>66 gal. Rnr.Tt. .. S.A. - 150.6 ft.2 . Anniston sump is 10 ft. by 15 ft., or S.A. = 150 ft.2. three important factors to be considered in determining the depth of the sump sre maximum possible spill, frequency of clean-out and turbulence created by Incoming flow. The maximum possible spill can be determined by examination of the processing unit. Frequency of clean-out can^be determined by'available manpower and equipment. Correct distribution of*the inlet flow across the inlet side of the sump will minimize the turbulence. There are several methods of distributing the flow. The Anniston sump has three inlet streams entering below the liquid level. An examination of the cut-away sketch #1 in Appen dix A will explain the principle. A minimum vertical separation of 2 to 3 feet should be maintained between settled material and influent stream. The inflow enters the sump below the liquid surface to prevent mixing of floating organics that may appear. The operation of a sump is simple and for that reason the necessary precautions for efficient operation are often overlooked or conveniently pushed aside for later consideration. However, to maintain efficient removal of Aroclor, caution should be exercised during operation of the sump. A few potential problems that may occur are listed below. * potential Problems ? * .1. .Solids washing into sump will be collected and, depending on'character .s of solids, could be a problem in removal. 2. Regular cleaning is required to avoid overfilling the storage capacity for Aroclor. ' 3. Introduction of detergents or emulsifying agents (e.g., floor clean ing) will have a serious deleterious effect on sump efficiency. .4 Prolonged periods of operation at flow rates higher than design capacity will result in decreased efficiency. 5. A sump alone will not remove materials lighter than water. 6. Care must be taken to prevent stirring of the settled Aroclor if cleaning is attempted while the pit is in operation. 7. A floating organic film with a high Aroclor content may appear on the sump surface. These are only a few problems that must be'considered If a continuously efficient operation is to be achieved. -2- HONS 0<0ia<t Construction Details: The solids that are washed into the sump create a problem when an attempt is made to remove the collected Aroclor. A sump pump that will handle the solids should be installed. Anniston uses the services of a commercial septic tank cleaner (Honeywagon). Neither a sump pump nor a Honeywagon removes all solids unless the pit is stirred. Therefore, a periodic shutdown of the sump is needed to achieve a thorough cleaning. . To prevent floating organics and trash from leaving the sump an underflow . arrangement is used (see sketch #1/ Appendix A). Because the floating film has a high Aroclor content a surface type skimmer is used in the Anniston sump. The surface skimmer used at Anniston is a model 610 Brill skimmer manufactured by Oil Skimmers, Inc., Cleveland, Ohio (see Appendix B). The tubing used by Anniston in the skimmer is Tygon R-3603 manufactured by U. S. Stoneware and lasts approximately four weeks per tube during continuous 24 hour service. The Anniston sump has an acid brick and leak-proof membrane lining because the waste stream is slightly acidic. If the waste stream is not acidic, leak-proof concrete walls and floor are sufficient. ACI Standard Building Coda was used for all reinforced concrete. A description of the acid brick and leak-proof membrane follows. -3- HONS 040185 I. ' tftdr), Pe-pTh .. ................. - /d fr . ________ ........................................... fT ...................... . ~~ /fi f T... CizJqTsd by cjeyjli e>y &JO$Tina, /,vf'lue/il p,y . <*/*/ slated crsr/'et'/ /fiaTcr/e) &i CCmTrocTiOhJ* " '' ~7~ .............. ........ . rfad find brick. /Med rei/v forced ce/ycrcTz [ufiriy ocJ,c zrr. rcsialQNT M&MbroA/s.. icYtmctu bnck qnd cmcr&Te. ff<ud &rick ..... . . L Lfc.td reniTanT MofTar - fewst/T /vr*># fax'd--*- ,rrr^~nr;r>~lD^ or <x<t) EiT/o /:3 rmimmcm t--CcHcrcTe, r</*&rOi/ f/cor -or uxaK GrcjT rP /V*Jc/ - fr/Mcr -f'i/i/ifnMC *// tr r^uil CeaT/f^ - few*txtT *Vd/ cr fy \ aC/a1 rt roe/r. t i-'T fe/txy/yi Cf I ~Cat//y^ - /kfl/HDat *ye>t tr E^unl HONS 040186 -4 ,') * ts\ '1 ' 'AHNISTOM . i/?/fOC.LCK WASTE SUM P #7 TsAnrue Y^cra~j 3/is/?/ >- V ----i---- r--1----i-------*1.-L--.-_-J- 203/i --------- - ,-----36 \ --- PART NUMBERS AND NOMENCLATURE 1. DRIVE WHEEL 1*. DRIVE WHEEL CHAIN 2. PRESSURE WHEEL 3. BASE 4. SCRAPER 5. COLLECTOR TUBE 6. REDUCER 7. ELECTRIC MOTOR, Vi hp/ * 1725 rpm/TEFCBB 230/440 volt, 3 ph. 60 cycles 115/230 volt, 5ph. 60 cycles t. TUBi GUIDE 1 9. OUTRIGGER e Compact, rugged construction, designed to fit into small areas. Self-regulating, will collect heavy greases and oils at an aver age rate of 800 gallons per day. Removes floating oily scum containing high concentrations of grease, oilcoateddirt, lint, paper, metal chips, and detergent gum. The MODEL 610 BRILL SKIMMER is Sturdily mounted, being bolted to a 4"x4" angle iron, which is secured to the edge of the sump or collection pit. To determine the length of collector tube needed for your application, this simple formula is recommended: DOUBLE THE AMOUNT OF HOSE NEEDED TO EXTEND FROM THE BRILL SKIMMER UNIT, TO THE LOWEST AVER AGE L/QUIO LEVEL IN THE PIT, THEN ADD 12 ADDITIONAL FEET, this will allow adequate tube surface when the liquid level fluctuates, permitting tube to float over and around debris, trash or any floating objects in the pit without tangling. . * ` distributed by OIL SKIMMERS INC. Phone: 216-337-6181 I division of THE G. BRILL CO.. CLEVELAND. OHIO 4!47 216-946-7747 -8- O 4* O The MODEL 610 BRILL SKIMMER is designed to gather and remove oils, greases and floating oily scum from the surface of water, coolants or cleaning liquids. This unique process permits the re-use of these solu tions, thereby effecting substantial savings. U also assists in complying with government regulations concerning the disposal of greasy, oily or gummy con taminating liquids directly into sewers or natural watersheds. HOW IT WORKS The MODEL 610 BRILL SKIMMER gathers floating oil and grease, and elevates it to a maximum of forty feet from the liquid surface of scale pits, sumps, settling pond? or streams. . This effective process is accomplished with a closed loop of special tubing, constantly moving and floating on the liquid surface. Floating greases and oils adhere to the outside of the tubing, and are conveyed up to a separator, where all greasy and oily contaminates are removed and drained Into storage tanks. The cleaned portion of the tubing continues its orbit and returns to the sump or reservoir to repeat the gathering process. The MODEL 610 BRILL SKIMMER fulfills a three-fold purpose, first, the original coolant is cleaned for re-use, second, oily wastes are consolidated with minimum water so that disposition is greatly facilitated, third, a substantial amount of fine solid contaminants are removed with the oily scum. SLUDGE SOCOfMiWIISRS Manufactured by OIL SKIMMERS IIMC. a division of The G. Brill CO.. Cleveland, Ohio 44147 MONS 040190 j INSERTING TUBING IN MODEL 6'rO BRILL SKIMMER V A. Remove backplate, apply power and check direction of rotation. 8. Squccre new tubing under tube guide lift up helical scraperand wind in tubing. B. Rotate motor coupling until tubing passes under pressure wheel insert tube between inner and outer rows ofteeth on drive wheel up to the next pressure wheel A. Press down tubing between sprocket teeth, and continue to rotate drive wheelQin proper direction until tubing is past second pressure wheel A. Continue to insert tubing past next pressure wheel by repeating previous Instructions. CHECKLIST ` A. Tubing Is now in proper position on drive wheeland is ready to be placed on out rigger Tubing in proper opening at right of spout --under tube guide--through hel ical scraper-- between inner and outer teeth of drive wheel-- firmly held in place by four pressure wheels--place tubing in opening on right side, extend along outrigger through the guide yoke, end over the outboard wheel. Unit is now ready for operation ... be certain that motor will drive unit in proper direction. .1803 W. ROYALTON ROAD CLEVELAND. OHIO 44147 A DIVISION OF THE C. BRILL CO. CLEVELAND, OHIO -..9 - 040191 AROCLOR REMOVAL - HCL LIMESTONE NEUTRALIZATION PIT Introduction: The Monsanto, Anniston, limestone neutralization pit serves a dual role -- neutralization of! waste Muriatic Acid (HCl) and removal of both dissolved and entrained Aroclor. Limestone neutralization is satisfactory in Anniston's case since the HCl does not form insoluble salts with the limestone. The limestone quarried and crushed within 30 miles of the plant site represents the most economical alkali source in Anniston's particular case. Neutralization of the waste HCl is accomplished by gravity feeding aqueous HCl through a bed of limestone rock. The removal of Aroclor is effected in two methods. First, the limestone pit serves as a large settling basin to collect entrained Aroclor. Second, the soluble Aroclor is apparently adsorbed by finely divided inert residue freed from the limestone rock during neutrali sation of the aqueous HCl. The effectiveness of the limestone pit in removing Aroclor was determined by laboratory analysis. Analysis of samples taken daily over a four month period of both the influent and effluent revealed a very significant drop in Aroclor levels across the Anniston limestone pit. At the present time, daily analysis of the pit effluent indicates average Aroclor levels far below the solubility level (300 to 400 ppb) of Aroclor. However, the low numbers cannot be main tained if detergents, emulsifiers or solvents are present in the effluent, in other words, any agent that increases the amount of soluble Aroclor in the waste stream decreases the amount of Aroclor removed by the limestone pit. Size and Analysis of Limestone: . Anniston uses two sizes of limestone -- #2 and #6. The #6 is small: 5% passes through a 3/8 in. screen and 100% passes through a 1 in. screen. The' small rock (#6) neutralizes the HCl quicker than the 42 limestone because it has mors effective surface area. However, if the #6 is not handled with caution it will compact in the pit and a loss of pit size and life will be realized. The 42 limestone is 1 in. to 2 1/2 in. in size. Neutralization takes a little longer but the compaction problem is minor. At the present .time Anniston is using the small 46 limestone in the first 20 ft. of the neutralization chamber and the Large #2 limestone in the rest of the neutralization chambers. A chemical analysis of the limestone used In the Anniston HCl neutralization pits is as follows: * . S102 Plus Insolubles *23 CaC03 Mg co3 2.446 '- 0.80 93.459 3.116 Sizing of Limestone Pits: . The shape and size of limestone pits used by Monsanto, Anniston, were developed for a specific set of variables and conditions present in the Anniston Plant. No known set group of theoretical equations will logically fit the sizing of the type of pits used by the Anniston operation. 10 - HONS 040192 / The numerous variables to be considered in sizing a limestone pit requires methods other than theoretical formulas. Flow rate, HC1 concentration, Aroclor concentration, length of pit life desired, available property for pit, chemical analysis of limestone, size of limestone available, efficiency desired for Aroclor removal, HCl neutralization efficiency and material other than HCl and Aroclor in the effluent stream are a few of the many variables involved. An effective and efficient limestone pit operation depends entirely on a thorough investigation of each variable. Therefore, it is recommended that a pilot model be operated before a full scale operation is installed. Although it is not recommended to use the Anniston operation as a proportional method of sizing other operations, it may be of value to know a few Anniston variables. These items may give an idea of what to expect. 1. Waste influent a. Flow - 700 gpm avg. b. HCl concentration - 1% approx. 2. Retention time for neutralization - 15 to 20 min. 3. Total pit retention time - 25 min. avg. 4. Effluent from limestone pit a. Solids (1) 50 ppm avg. (2) 1.5 to 250 microns b. 100 ppb PCB avg. ^ Description of Facility: -/ Monsanto Anniston has two limestone pits designed and located for continuous operation. A flow diagram (fig. 1) shows how the pits are arranged and connected together for simultaneous or individual operation. For clarity ir. description the pits are numbered pit #1 and pit #2. ( Reading the description of the two pits will reveal a discrepancy in size and arrangement of baffle walls. Although the pits are not identical they both work reasonably well. Experimenting in the field as to the best method of sise and arrangement caused the discrepancies. Presently the recommended approach is pit #1 for operation and efficiency. - 11 - MQNS 040193 / tSfjIutt If : -Cl-, -Si-/ - 12 - Limestone Pit #1 Pig. n Dwgs. D1300-C1-A D1300-G1-A Limestone pit #1 originally built for HCl neutralization only is presently, after minor revisions, used for neutralization and Aroclor removal. The physical dimensions and characteristics of pit #1 are as follows: The influent flow measurement weir is a 6 ft. by 7 ft. acid resistant bricklined reinforced concrete box with a 12 in. wooden 90 V-notch weir. The grit chamber measures 32 ft. wide by 20 ft. long at the top with 1:3 side elopes. The depth of the grit chamber is 4 ft. The walls and bottom are reinforced concrete. Baffle "A" is an overflow baffle that forms the downstream end of the grit chamber. The baffle is made of reinforced concrete 1 ft. thick by 32 ft. long by 5 ft. deep. The neutralization chamber is 120 ft. long by 50 ft. wide at the top with 1:3 side slopes and 7 ft. deep. The neutralization chamber is the only portion of pit #1 to be filled with limestone. Baffle "B" is an underflow baffle. See drawing D13Q0~C1-A for description. The settling basin has two compartments. The first compartment is a 17 ft. continuation of the neutralization chamber void of limestone. The second compartment is a reinforced concrete box 14 ft. long by 27 ft. wide and 10 ft. deep. The second compartment is sloped 1 ft. in 7 ft. from upstream to down stream end of the basin. A perforated suction pipe is used at the low end to pump inerts coated with Aroclor from the pit. Effluent leaves the pit in an overflow standpipe. The elevation of the standpipe controls the level in the pit. . The entire pit is coated with Lion P25 cat neutralization chamber has a 12 in. protective sand cover over the asphalt., see Appendix for Lion Technical Bulletin CA fpr subgrade preparation and application of the asphalt. MQNS 040195 fit ** HONS 040196 NOTlCCi Thl* inwlnt li ttt nropirty of Monionto Comcany and mutt 0* ratutnod. without roprodve* Non or Ovplleition, at any tiir upon racuitt. but In any ovint at csmoiitlan of th .* or job. Whll* In Hit pstimfon of tbi uc:it mutt bi proptr.y taftra.'dtd ajtinit rmUtton or dtclo* aura to any o.it tactst tboia ampioytt who rtouiro it for Hit w:r* or Jib. Tho rtclp.rst must kitp conftdinllal, and ftculra hit ,'ltt) omplaytt to kit? eonflltstial, Via lr.(3rau'*! co.iu.ntd timon. company co.mos;m*i This Pr*.(n| l tap propirty of Monunto Com? ay and mutt bo account'd ter, iniamunsn horton it coiMr.tlil an: mutt not b f?r9luj3, ftvjilsd to unt^l'-orCta Ciron a: nj outiido tb* compiny w.t?out prjpif aiVsnut..;'. T80 - MONSANTO COMPANY - Anniston, ala. TiTUt OAAWN or /?lQ JV Z/'n$TOrtt=. APWftOVCD 3T,eiAt P/~r^- - 14 1 OATC | 3/rt/n | OCACC | ' 1 DtPT. | AUTH. NO. JOB NO. TS-A Limestone Pit #2 rig. #3 Dwg. 1300 pit 12 is 200 ft. long by 60 ft. wide at the top with 1:4 side slopes and approximately 6 ft. deep. The influent stream is distributed across the width of the pit through an 18 in. perforated Flextran pipe. The Flextran pipe, product of Johns-Manville Company, was perforated by Anniston personnel for the expected flow in the Anniston Plant. The perforations are .2 in. holes 1 ft. apart. , Baffle "A", 66 ft. 6 in. from the distributor, is an overflow baffle. Baffle "B", 66 ft*. 6 in. downstream of "A", is an underflow baffle. See drawing 1300 for details. ' All of the pit from distributor to baffle "B" is filled with limestone. The last section of the pit from baffle "B" to the overflow has 30 ft. of limestone and 36 ft. of settling area. Effluent leaves the pit through a wooden 12 in. 90 V-notch weir. She entire pit, dirt surfaces and exposed concrete, are coated with asphalt. - 15 - MONS 040197 & mows 0 0 1 va* NgTICti Ytiii drawlnf U tha orosiiTr of Mar.unio Csmcjny and mult b* ritwnil without laprodue- ttan v tfusKcJiiin, it any t. wan raeuist. but In any event at computus r to* w .. or |ev AMI* in D penmlon el Oil recipient, It mut bi properly wlejuircid a;amit or eleei* agio te in* on* ticept t^eit trra>9/ts no rieuir* it lor t.*t sir* or 1*9. Tfci recipient muit keep eonfldtndil, and rewire Ma ()u) employ** to katp eonr.ientiai, in# informaUM onijin#i nmsn. COMPANY CCririOEfiflAl This dravlr| li the prjperty of Maneanto Comc.iy tnj mu! 0* account*d lor. inlarmii* nr*en l cpnflji'VH an: mult not b reproduced. rivalled to uitiuthortua ctrune #' not euoide tne ce^oany wuriaut prapir eol-jrcc:.**. . TSD - MONSANTO COMPANY - ANNISTON. ALA. two* .. */ 2 ///** # sto*t r> - 16 - DRAWN t jAPPROVED jDATC 1 DCALC . DEPT. . AUTH. NO. JOB NO. TS-A v^j Clot# up view of tough and flexible PvO> "cot'' asphalt membrane lining applied on large canal project in Wyoming, Tcchntcol Bulletin CA Published by Lion Oil Company, II Dorado, Arkansas The old cliche (hot "History repeats itself" l certainly true In record to the use of oipholt down through the yeari. The Baby* lonlon and Sumerian civilizations of 2500 B.C. found notive ospholt* the only ongwer to woterproofing problems In their tem ples ond potoces. Mon of the 20th Century also is finding asphalt the most solisfoctory ond economical answer to some of his greatest problems. Modern improvements in petroleum refining and Intensive reseorch hove developed petroleum osphalts of mony types, end from them have come aspholtic products especially de signed to serve many needs In the world of today. One of the newest developments from the petro-chemical laboratory is cololyticolly blown asphalt, or "cot" osphalt os it is eommonly called. Originated ond developed by the Lion Oil Com* pony under potent No. 2,450,756, cotalyticolly blown ospholt, using phosphorous pentoxide cs the catalyst, has been widely adopted throughout the United Stares as o principol moteriol for controlling seepoge in irrigation conols ond water supply systems. Oneof'the most serious problems of the modern world is the drying up of streoms ond the consequent lowering of woter tobies, necessitating construction of irrigation canals, woter storoQe pits, and the domming of rivers to serve as reservoirs. Before the dis* covery of "cot" ospholt, irrigation engineers found o great deoi of woter being lost through seepoge, ond they tried many methods in on effort to control the wostoge. The water which seeps from conols ond irrigation ditches is not only lost, but usuolty collects In lower ground areas, rendering such areas unproductive or neces* gitating the Installation of expensive droinoge systems. In 1949, the U. S- Bureau of Reclamation astimoted that of the 15,650,000 ocre-feet of woter supplied for irrigation, 3.900,000 ocre*fett. or 25 per cent, were lost in transit. With, the advent of "cot" ospholt os the ideol low*cost canal liner, much of this waste hos been eliminated. For conol linings, "cot" ospholt is used to produce a thick, tough, woterprpof membrane, formed by spraying the very hot (400'F.I ospholt on the earth's surface. This type of ospholt, now manufactured by o number of licensees, hos been opplied to over 6.5 million square yords of conols ond reservoirs for seepoge control during the past five yeors, and its use is constantly expand* Ing os new needs ore found for this versatile moteriol. Extensive tests mode by the U. S. Bureou of Reclamation in connection with canal lining'construction, using the Lion catoiyticoily blown ospholt, hove shown the product to hove unusuol durability char* octeristics os well os a toughness and flexibility which moke It unexcelled for this purpose. Experience hos shown thot, not only `is this type of construction probably one of the most efficient means ever developed for the control of seepage, but It is the most economicol both in initial cost and in length of service. Although Originally developed for the control of seepage of irrigation water in canals ond reservoirs, newer uses include con* trot of industrial wastes, preventing pollution of ground waters, the leak-proofing of sewage disposal ponds, the lining of reser voirs for the settlement ond filtration of municipal water supplies, ond erosion control on beoches and form londs. A most interesting application of "cot" asphalt is in connec tion with the foscinating development of underground storage for butpne-propone hydrocarbons. In Scurry County, Texas, near Snyder, the underlying sal t domes become excellent gas storage reservoirs by the simple expedient of pumping woter into the solt domes, dissolving the solt, and bringing the brine bock to the sur face to be stored in pits lined with "eat" asphalt. This brine can be injected bock into the reservoirs to lift the stored goses to the surfoce for commercial use during the periods of heavy demand. Lion Oil Company, Sunroy Oil Compony, Scurry Bufone Produets Company and Phillips Petroleum Compony are among those who art using "cot" asphalt as o liner in such brine ponds. This method of storing the brine prevents the pollution of the surrounding soil and saves precious woter for reuse, making possible on economic ally feasible operation. One of the (olest developments In the use of membrone ospholts is the stabilization of natural soils under highway ond oirfield povements by.enveloping or "wropping up" these soils in membranes of "cat" aspholt. Simple, efficient and durable beyond ail normal requirements, yet low in cost, this method of pavement design promises to revolutionize the work of the highway engineer, allowing the construction of fast, smooth, high load-eortving high ways ond oir fields ot a fraction of todov's cost. The requirements for membrane asphalt as specified by the U. S. Bureau of Reclomotion ore as follows: The ospholt for the ospholtic membrone sholl be cotalytiecNy blown asphalt cement ond sholl conform to the following specifi cations-- la) Materials--Tha moteriol* supplied under this specifica tion sholl be. osphalts prepared only by the catalytic* U. S. Fetenf Number 2,450,756 - 17 - HONS 040199 Rapid coverage oI large areas with P.O. "cal" asohalt it made easy by attaching the aptay bat directly to distributer. (Riverton Protect. Revision. V/ye.) Dragline eattt earth cover over completed membrane lining m major imgjtii canal project to supply water to necessary to growing ot cropi in the Watt. . blowing treatment ot osphaltic petroleum. Asphaltic ' materials for which ferric chloride or Other compound) of Iron hove been used os catalysts in the blowing opera* tiers, will not be occeptoble. (b) General requirements---The aspholt shall be homoge nous, free from woter, end shod not foom when heated to |47*F, tel Detailed requirements--Cotolyticolly blown asphalt sholl meet the requirements shown below: Flo* Point (C.O.C.I, min........ ........................ 425F. Softening Point (R&B)................... 175 to 200F. Penetrotion ot 77F., 100 g., 5 sec............... 50*60 Penetration ot 32F., 200 g., 60 sec., min.... 30 Penetrotion ot 115F-, 50 g., 5 sec. mox,.... 120 Ductility ot 77F., 5 cm. per minute, min..... 3.5 cm Loss at 325F., 5 hours, max......................... 1.0% Penetrotion after loss on heating, 77P,, 100 g., 5 tec., % of originol, min.......... 60.0% Bitumen (soluble In carbon teirochloride), min. 97.0% APPLICATIONS---Construction requirements are considered under 4 generol'claites: (U Seepage Control, (21 Seepage and Erosion Control, (3) Erosion Control, ond (4) Soil Stabilization. SEEPAGE COMTROL Efficient, economieol seepage control con be obtained by the use of the simple ''cat** ospholt membrane. This membrane is constructed by spraying the hot "cot" ospholt directly on the prepored, smooth tubgrode, ond then covering the cooled mem* brone with o loyer of soil or grovel. PREPARATION OF SUBGRADE--New canals ond reservoirs must be excavated to allow for the thickness of the earth cover over the membrone. Mony old conols ore already oversize os o result Of erosion, so that frequently no over-excovotion is necessary. For application purposes it is not necessory to trim the conol to any exact cross*iection, so that in mony coses much earthwork eon be loved by using essentiolly the existing conol or reservoir. However, In both conols ond storoge pits, side-slopes must not be steeper than l*|/4:l; otherwise, sloughing of the soil cover oyer the membrane may occur. In some coses, if the cover soil is particularly unstable, lopes of 2:1 ore desirable. Subgrodes should be smooth before applying the hot asphalt. It is important that the tubgrode be free of etods or (otge pebbles since it Is difficult to coot properly such projections. Smooth surfaces require less ospholt in the pro duction of a perfect membrone. Conversely, o rough surface re quires more ospholt ond greotly increases the difficulties in obtain ing o completely water-tight membrone. An adequately smooth surfoce may be obtoined by drogging first with a steel beom to knock down lorge projections, following with a smooth-foced steel roller to crush clods and push pebbles into the subgrodes. Usually o roller weighing 50 lbs. per lineol inch of width is specified. * To guard against undue weed growth, oil weeds, tules, cot* toils or willows should be grubbed prior to beginning the drogging and smoothing operations, Where weed growth is excessive, it will be wise to opply a good commercial soil sterilant eonto'ning sodium chlorate and borox. This moterial moy be oppfied dry or in woter solution, not less than B ounces to the squore yard, in the Infested areas. The sterilant should be applied after dragging ond rolling have been completed. Dry, dusty areos of subgrade must be sprinkled with woter immediately prior to application of the hot ospholt. Unless this Is done, holldoys moy form in the membrone due to the surface tension of the hot ospholt. pomp, wet, end cold soil helps, rothtr than hinders, the formotbn of q good membrone. APPLICATION OP MEMBRANE--The ospholt is sprayed directly on the subgrede to produce a membrane of uniform thickness free from holes or holidoyt. The usual rate of application is 1.5 to 2 0 gallons per square yord, with heavier applications preferred for reservoirs and chemicol ponds where leakoge may be critical, and for other installations where the tubgrqde It unavoidably rough. Asphalt may be applied by bond sprays or by distributor bars con* nected to a distributor with a flexible metal hose ond supported by suitable cobles or ropes. All passes of the sproyt should be lopped to ovoid thin or bore areos, Applications on side slopes ore usually made prior to covering the bottom of the canal or reservoir. Such application in several posset will ovoid excessive run-down ond puddling of the ospholt in the bottom. The tem perature and pressure of the asphalt at the sproy nozzle should be controlled to mointoin o flat uniform spray. An application temperature of 350* to 400*F is recommended. Rope supports or cleated plonks should be provided for work ing on si .'a slopes if the lubgrode will be adversely disturbed when such meons ore not used. Roughened or disturbed areas should be smoothed before application of the osphalt. Concrete oreos to which the membrane is to be bonded should be clean and free of loose moteriol, ond the ospholt should be applied to epproximotely twice the normal thickness, topering to normal thickness at a distance of approximately 12 inches from the edge of the con crete. If atmospheric temoerotures ore low. or if the concrete is slightly damp, priming with o thin asphalt cutbock is recommended before oppUcotion of the membrone. - 28 - MONS 040200 V................... --........-.................. - Adequote safety devices such os goggles, sofety motks ond heavy gloves should be used by workmen and sproy men. Sproy equipment and the distributor must be flushed with distillate prior to shutdowns or storage. The dlttlllote used for flushing the sproy equipment should not come in contact with the eompleted membrane, ond all distillate must be removed from the sproy system before beginning membrone applications. COVER MATERIAL --The primary purpose of cover material is to hold the membrone in piece to prevent lifting ond destruction by ub-surfoce hydrostatic forces or flowing woters. In addition, the cover protects the membrane from weothering ond from mechani cal injury such os moy result from the hooves of livestock. In general, on earth cover not less than 12 inches In thickness Is recommended. Graded sands ond grovels generotly form the most ttoble cover material. Water-deposited silts ore the leoit stable. Where water velocities exceed approximately 1.5 feet per second, or where turbulence or wave action exist, gravel blankets of pit-run oggregote placed 3 to 6 Inches deep (or more) over the earth covft are advisable. The greater the erosive possibilities, the larger should be the maximum iixe of the oggregote. If condi tions are severe, the use of asphalt mocodam, os described, in ths following sections. Is recommended. - ' Cover material Is generally placed by costing from dreglines, but In targe reservoirs roadways of cover material moy be built over the membrane and the soil hauled and spread from within the area. Dosing af soil eover over the berm it usually objection able since sliding soil or rolling rock moy injure the membrone. COSTS--The cost of 8uri#d Asphalt Membrane will vary with the type of Installation, the availability of proper backfill materials, and other factors. Costs on the overage type of project, which include all excavation and backfill for a completed job, are from 40c to 70c per square yard SEEPAGE-AND-EROSION CONTROL CANALS AND DRAINAGE DITCHIS --In canals and droinoge ditches where the water velocities ore high, on asphalt-penetrated macadam cover can be placed directly on the "cat" asphalt mem brone to prevent erosion. In reservoirs, the asphalt-penetroted macadam cover alio may be used to prevent displacement of the cover morerlQl by wove oetion ot the beoch line. To produce the mocodom cover, o uniform covering of grovel hoving o thickness of 2 to 3 inches Is placed over the osphaltlc membrane. The gravel ihould be uniformly graded with 95% re tained on a V# -inch screen und 100% posting through a one-inch screen. This grodlng Is necessary in order to produce a layer ef rock or grovel which will be sufficiently "open" to permit penefrotion by the aspholt opplied to the surfoce. After th* rack or grovel hos been carefully placed, it is bound together and cemented with a heovy opplicotion of "cot" asphglt. The aspholt must be applied slowly, with a "flooding" action, to secure deep penetration of the rock layer. If the aspholt is applied fast or with light sweeping strokes, it will build up on the surfoce and deep penetration can not be obtained. From l-ft to 3 gollons of aspholt per square yord ore required for thorough penetration of the rock layer. If a smooth surface is desired, a fine oggregote poising ft *<nch and retoined on o V< - inch sieve con be opplied ot the rote of 25 pounds per squore yard and keyed In by light roll ng while the aspholt is still hot. Such construction con be in two or more layers to provide o blonket of additional weight if ereeio.n conditions ore very severe. MEMBRANE HALS IN IARTH DAM CONSTRUCTION--The use of membrone aspholt on the upstream face of dome, on the base under the fill, ond on the reservoir floor opens up new possibilities in construction of eorthen dams on sites that befcre were nor economically feasible. * In the "Pacific 8uildor ond Engineer" for October, 1951 there appears on interesting description of plans far an earthfilled dam approximately 3,600 feet long and 36 feet high at the valley floor. The uee of catalyticaily blown aspholt membrone over the entire upstreom face of the dam ond on the base under the fill will moke possible watertight storoge of T0.000 acre-feet of water. The site for the reservoir had been considered several times in the past by engineers, but was net considered feotible with either a clay-core wall or sheet piling. In such construction, a membrane completely covering the face of the dam prevents seepage from the reservoir from enter ing the fiil of the dam; the membrane on which the fill is con structed prevents the water rising by hydrostotic pressure into the fill; the membrane extended upstreom on the volley floor, for varying distances as conditions require*, practically eliminates loss through seepage by increasing the distance water must travel. The nembrane on the foce of the dam should be wvered by 0 select eorth or sand cushion which in turn should be covered by compacted pit-run fill. The top layer should be slog, or stone riprap, or oipholtlc concrete. The membrone on the base ot the dam (upon which the fill is to rest! should be placed on prepored subgrode and protected by a select earth or sond cushion, and in the reservoir by on earth cover. With the avgiluUlity of vutulylie membrane ovphull, con struction of dams Is possible In areas where only porous toils ore "The length ef travel of eny icfQ*C* ehould he 10 timet the 19 heed et the eertlculir location it at a certain point on rha dam nvr* Is e dtplh of 25 fact of wirar. the total length of memoijne ur-jar ma dam plus tht membrane uptiraam from the dam on the val'tv M'o MOMS 0 4 0 2 0 1 I ovolloblc. Expensive cloy core-woll or sheet-piling methods ore no longer necesiory when the membrone lining is used. EROSION CONTROL If the seepage problem is not important, erosion control moy be obtolned reodily in ditches ond on spitlwoys by the use of on asphalt-penetro ted maeodom cover os described In the previous section, second paragraph. The subgrode should be smoothed before the opplicotion of the loyer of gravel (the ptoeement of the Initiol membrone being omitted). The "cot" asphalt is then slowly "flooded" to properly pen*trote the grovel. SOIL STABILISATION Uses of ospholtie membrons In soil stabilization include fa) enveloping the soil base, (b) os o capillary barrier, ond `(c) os a shoulder or a houlder-ond-dlteh membrone. In these applications the cotolytie asphalt serves as a water-tight borrier o maintain o low or o constant, predetermined, moisture content In the soil material ond thus to stabilize the load-bearing copocity. Soils with appreciable contents of day have high bearing strengths If their moisture content is maintained ot a low volue. The bearing strength of such soils under such conditions is utuolly more thon sufficient for their use as a bose material in povement construction. Loss in strength ond troublesome volume ehonges ore prevented by. the membrone envelope, which maintains the moisture content at a constant predetermined value. The use of aggregate boie courses Is minimised or eliminated, depending on the supporting volue of the enveloped soil. In such construction a membrone is sprayed upon o prepared plane surface ot on o fill, or in on excavated trench with sloping Sides. The membrane should not be less thon 4k-lnch thick to provide a reotonoble factor of safety with the construction methods ond stresses applied (2.1 gol. per sq. yd.). The membrone should bo carefully Inspected prior to covering and all thin orcot and voids (holidays) should be corrected. The first loyer of soil, ploced to a minimum 6-inch depth over the membrone by drag line or by dozer. Is compacted by a pneumatic-tired roller or by 0 trock-taying tractor. After the initiol loyer hos been com. posted, the remainder of the fill is placed ond compacted by con ventional moons. The moisture content of the soil should conform to normal compaction practices. On completion of the fill,-the top and sides are iproyed.with membrone to complete the envelope. (In certain coses the top membrone may not be necessary if on adequate woter-tight wearing surface is placed in its stood). With the top membrone In position, base construction is ploced os re quired, with o cushion course directly over the membrane. 8y moons of such simple methods, existing soils can be made into stable boses. Membrones can be used as copillory breaks under boses or suborades subject to soturotion or frost action through the presence of woter immediotely below these elements. The borrier will con trol both copillory end vapor moisture. With such o seel, the use of bose moteriols hoving o high content of 0.02 mm. size fraction is practical In areas where frost susceptibility Is a problem. Layers of gravel customarily used os capillory breoks but which frequently foil becouse of filling with capillory soil moteriol, ond which per mit vopor phose possoge of moisture, are replaced by o simple, readily applied, asphaltic membrone. Side ditches ore sometimes the source of destructive moisture In the subgrode ond base. The-use of ospholtie membrones in such opplicotion Is entirely similar to thot in conols. Thus Lion's new cotalytic osphalt, a product of petroleum re search, has been found efficient and adaptable in controlling woter ond solution seepage, and for maintaining mdisture content at the desired level In engineering construction. COVERAGE REQUIREMENTS FOR MEMBRANE ASPHALT Weight, tbs./gal. at 60F................. ............................. 8.5 Gallons ot 60F., per ton ...................... ............ ........ 235 Film thickness at 1.5 gallons at 60F/sq.yd....... .. 0.27 inches Film thickness ot 2.0 gallons at 60F/sq.yd.......... 0.36 inches Film thickness at 2.5 gollons ot 609F/sq.yd.......... 0.45 inches Tons per acre at 1.5 gallons ot 60F/sq.yd..........- 31.0 Tens per acre ot 2.0 gallons at 60F/sq.yd ...... 41.4 Tons per ocre at 2.5 goltons ot 60F/sq.yd...... .-- 51.8 Multiplier for volume reduction to 60F. from 350F 0.9024 Multiplier for volume reduction to 60F. from 375'F.._.............................. ........ 0.8944 Multiplier for volume reduction to 60F. from 400*F________________________ 0.8864 Multiplier for volume reduction to 60F. from 425F...... .............. ....................... 0.8784 For further information about the utilization of membrane lining in specific cases, oddress your inquiries to LION. OIL FfeJ COMPANY ASPHALT SALES DEPT. /iTfll'ft/ CL DORADO, ARKANSAS io - MONS 0 4 0 2 0 2 AROCLOR ADSORPTION ON ADSORBENT OTHER THAN CARBON A study is presently in progress to evaluate the removal of Aroclor by adsorption on a less expensive adsorbent than carbon and then removing the adsorbent by flocculation. . 21 - HONS 040203