Document KR7KNV1g8YEd34GbK4MXKYYbx

and all equipment should be braced securely at top, bottom, and intermediate landings Steps should be nonslip The entire manlift should be suspended from the top to prevent bending or buckling of the rails Handholds (either open or closed type) should be painted a conspicuous color, such as orange or yellow They should be not less than 48 in or more than 56 in above each step and steps should not be less than 16 ft apart Floor landings or emergency landings should be provided for each 25 ft of manlift travel Clearance between the surface of any landing and the lower edge of the conical guard suspended from the ceiling should be at least 7'A ft The minimum clearance be tween the center of the head pulley and roof or other construction should be 5 ft The bottom landing on the up side should have steps to a platform level with the manlift step as it rises to a horizontal position Floor openings and shear guards. At floor landings, standard 42-m guardrails and 6-in toeboards should be provided around floor openings in such a way as to permit a landing space at least 2 ft wide Rails or guards should have maze or staggered openings or self-clos ing gates opening away from the manlift (Fig 21-11), and at each floor opening on the up side, funnel-shaped (conical) guards should be installed (Fig 21-12) Brakes, safety devices, and ladders A brake, designed to be applied automati cally when the power is shut off, should be installed on the motor shaft for direct-connec ted units and on the input shaft for belt-driven units The brake must be capable of quickly stopping the manlift and holding it when the down side is loaded with 250 pounds on each step A control rope or rod should be provided within easy reach of both the up and down runs When pulled m the direction of belt travel, the rope or rod should cut off the power and apply the brake A mechanical-electrical device that will automatically shut off the motor power supply and apply an electric brake if the rider fails to alight at the top land ing should be installed It should be arranged so that the manlift cannot be started again ex cept from above the upper landing A secondary safety control located on the top operating floor is required It should be set to operate when the belt has traveled 6 m beyond the point of operation of the primary safety switch, in case the latter fails The de vice should stop the manlift before the loaded step reaches a point 24 m above the top landing A fixed metal ladder accessible from both the up and down runs should be provided for emergency exit where the vertical distance between landings exceeds 20 ft It should meet the requirements of existing state laws for ladders except that an enclosing cage should not be provided since the ladder should be accessible from either side through out its entire run Inspections Every manlift should be tested and inspec ted at least every 30 days On discovery of a defect, the manlift should be put out of opera tion immediately and not used until repaired Each periodic inspection should cover, but not necessanly be limited to, the following items Steps Step fastenings Rail supports and fastenings Rollers and slides Belt and belt tension Handholds and fas tenings Floor landings Guardrails Electric switches Lubrication Warning signs and lights Signal equipment Drive pulley Bottom (boot) pul ley and clearance Pulley supports Motor Driving mechanism Brake The safety mechanism of a manlift should be inspected daily for free operation and for accumulations of dirt and grease A manlift should be completely dismantled once every three years and defective or excessively worn parts should be replaced General precautions The maximum speed ofa manlift belt should not exceed 80 fpm and should be uniform on all manlifts throughout the plant If the lift carries a great deal of traffic, a maximum speed of 60 fpm is recommended 601