Document KR0raDdKEV5Yy8wjBRNYV21n0
ETHYL CORPORATION
INTER-OFFICE
To Mr. W. D. Gottwald, Sr.
Address
Richmond
From
Subject
D. B. Crawford
PVC Emulsion and Paste Resin Expansion Foundations - Paving and Misc. Site Work Contractor: Nichols Construction Corp. Contract Date: April 24, 1969 Project No. B-70031
Address Date
June 12, 1969
Enclosed is the originally signed copy of the subject contract.
The required support letter and advice of contract clearance are enclosed.
Engineering Contract Administrator
Ac Attachments cc: Messrs.
R. H. Cowllshaw C. A. Kyle G. S. Roberts ^
E-09551
CONTRACTUAL AGREEMENT between: ETHYL CORPORATION: OWNER
UNITED STATES OF AMERICA STATE OF LOUISIANA EAST BATON ROUGE PARISH
NICHOLS CONSTRUCTION CORPORATION: CONTRACTOR
FOUNDATIONS-PAVING AND MISCELLANEOUS SITE WORK
JOB GJ-4___________
THIS AGREEMENT, by and between ETHYL CORPORATION, a Virginia Corporation, herein represented by Mr. G. S. Roberts, its Chief Engineer (hereinafter called "OWNER")/ and NICHOLS CONSTRUCTION CORPORATION, General Con tractor, herein represented by Mr. Bert S. Turner, its President (hereinafter called the "CONTRACTOR"), whose name is affixed at the end of this AGREEMENT, shall be bound by the following terms and conditions:
ARTICLE 1. SCOPE OF THE WORK The CONTRACTOR shall furnish all material, labor, supervision, tools, facilities, equipment, and supplies, and perform all Work described in the speci fications entitled "Contract Specifications for Foundations-Paving and Miscellaneous Site Work", Job GJ-4 dated March 28, 1969, for Ethyl Job No. 70031, and shall do everything by this AGREEMENT and the above-mentioned specifications, includ ing all implicit and accessory work, whether or not it .is expressly stated, to con struct these facilities at the Baton Rouge, Louisiana manufacturing plant of the ETHYL CORPORATION. All materials required for the {ob shall meet specifications, unless an agreement to depart therefrom is approved in writing by the OWNER, and all work
E-09552
2.
shall be done in a good and workmanlike manner, to the satisfaction of the OWNER,
and shall be in accordance with all the current and applicable codes, rules and
regulations.
ARTICLE 2. TIME OF COMPLETION .
The Work to be performed under this AGREEMENT shall be commenced
immediately and pursued with diligence, and according to the construction
schedule prepared by the CONTRACTOR and submitted with his bid dated
April 14, 1969. The Work shall be completed within 40 working days, including
all tie-ins, shutdown, and testing.
The CONTRACTOR agrees to expedite the work as much as possible and
to review the progress of the work weekly with the OWNER in relation to the
Construction Schedule. The OWNER reserves the right to question the manpower
assigned to the job and if in disagreement, the CONTRACTOR shall furnish satis
factory proof in writing that the job is adequately manned to meet the schedule.
It is expressly understood that CONTRACTOR will use its best efforts at
all times to schedule the work to fit any revisions to dates of delivery of OWNER
furnished equipment and materials and construction drawings and otherwise to
minimize the effects of all such revisions on the completion date.
The CONTRACTOR fully'understands that the .OWNER considers that time
is of the essence in the completion of this job, and Articles 2, and 24, of
the "General Conditions" are applicable and in full force in this regard as well
as Sections 5 and 10 of the Contract Specifications, and other pertinent articles as applicable.
E--09553
3.
ARTICLE 3. THE CONTRACT PRICE
The OWNER shall pay the CONTRACTOR for the performance of this
Contract the sum of Fifty-two Thousand Seven Hundred Fifty and No/100 Dollars/
($52,750.00) dollars, per the CONTRACTOR'S bid dated April 14, 1969.
ARTICLE 4. COMPLETION AND ACCEPTANCE OF THE WORK
The completion of the Work by the CONTRACTOR, and the acceptance
of the Work by the OWNER, will be in accordance with the General Conditions,
in particular Articles 5, 35, and 38, and other pertinent articles as applicable.
This AGREEMENT shall supersedeand cancel any and all previous agree
ments, whether oral or written, between the parties hereto, in connection with
the subject matter of this AGREEMENT.
IN WITNESS WHEREOF, the parties hereto have executed this AGREE
MENT in multiple originals the day and year last below written.
Witnessed:
ETHYL CORPORATION
Date
__________
By______________________________ Date
Witnessed:
By. s r)
Date//
By__ Date
"G. S. Roberts, Chief Engineer Date
NICHOLS CONSTRUCTION CORPORATION
E--09554
ETHYL CORPORATION Advice of Contract Clearance
Division or Department Engineering
Contract Date April 24, 1969
Location Baton Rouge Contract Number
(If any)
Contractor (Individual or Corporation) Nichols Construction Corp. Description (Brief Outline) Foundations, paving, and miscellaneous site work_____
for Job GJ-4, GJ-6, and Commercial PVC Reactor Cleaning
A. Reviewed and Cleared by:
Law Patent (if required) Finance:
Tax Insurance Cash Control
Name or Initial
t ft l<
We
si-K ^
Date
y
B. This contract does not require specific clearance under Section V of Contract Procedure, since it is a "standard" or "simple, routine" contract.
Div. or Dept. Contract Administrator's Initials
Date
Note:
After clearance has been completed, the department or division contract administrator will forward this form attached to the appli cable contract to the Corporate Contract Administrator for his records.
E-09555
ETHYL CORPORATION
INTEROFFICE
&
To
From
Dr. G. F. Kirby G. S. Roberts
Address
\VA'V\
Address
Subject Project B-7003 - Emulsion and Paste Resin Expansion Date Contract Authority
Baton Rouge
Baton Rouge April 21, 1969
This is to request authority to execute a lump sum contract in the amount of $52,750 with Nichols Construction Corporation for foundations. paving and miscellaneous site work for Project B-7003, Emulsion and Paste Resin Expansion. Project B-7003 was approved by the Board of Directors on November 26, 1968 in the amount of $2,700,000.
The construction work for Project B-7003 has been broken down into four basic packages as follows:
1. Lump sum bid for foundations, paving and miscellaneous site work
2. Lump sum bid for erection and installation work in the spray dryer and latex storage area
3. Cost plus fixed fee contract for conversion work in the reactor and additive areas, where a lump sum bid is not practical
4. Lump sum bid for installation of new 6" steam line from G.S.U.
The bid package for Item 1 was sent out to a total of six contractors, three industrial and three A.G.C. All accepted the opportunity and returned their bids on schedule. Our own estimate for The work involved was $85,000, and the bids received ranged from $52,750 to $79,680. Our estimate was based on conservative unit costs for this type of work done by Ethyl forces and on the scope as originally defined at the time of seeking project approval. The package as issued was, of course, precise in its requirements, and this, allied to the general present eager ness of contractors to bid for work of this type, has resulted in quotations below our estimate.
Items 2 and 3 above are expected to be released for further action later this month. Item 3 will be placed with H. E. Weise; Incorporated on an existing blanket contract to an approximate value of $168,000.
/kb cc: .Mr. T. M. Smylie
G. S. Roberts
E-09556