Document KJYE8ZOv0zKmnNgkZL37dEaBQ

(conoco) Interoffice Communication To R. D. Gamblin From J. A. DeBernardi Date October 28, 1975 subject Elevated Working and Walking Surfaces - VCM Plant Attached you will find the subject report. This transmittal also includes the status of working and walking surface deficiencies discovered as a result of our pre-turnaround inspection. With the exception of the items noted in this report, all items included in the July 17, 1974 inspection report as Priority I, II, and III have been completed. is Enc CC + enc: REL CCR 000016561 /' Interoffice Communication To J. A. DeBernardi From C. E. Gremillion Date October 27, 1975 subject Inspection of Elevated Walking & Working Surfaces VCM Plant Attached is the 1975 third quarterly status report of the repairs to the priority II & III items. Completed priority items have been dropped from the list. This report includes repairs made through October 21, 1975. C. E. Gremillion CCR 000016562 ATTACHMENT A PRIORITY II & III ITEMS VCM PLANT - LAKE CHARLES TITLE C-102 II - Remove foot obstruction behind the ladder at 6th level platform H-485 Fin Fan III - Replace expanded metal grating or add supports T-511 Anhydrous Ammonia II - Install handrails on steps to dike - T-101 III - Ladder rung not in alighment with platform <- H-104 III - South of H-104 railing is substandard (28") H-106 Ill - On both ladders top rung is not in alignment with platform . Light Ends Column III - Add intermediate platform on ladder - exceeds 20 feet Platform Over S-207A and 207B, S-108 & S-109 II - Remove top ladder rungs Structure at T-103A, T-110 & T-102 Tl ^ Add safety screen at west ladder to platform over T-103A (43" opening) Vertical Tanks West of HC1 Tank Yl - Install toe boards on west side of platform C-500 Scrubber Yl - Provide intermediate platform or safety climbing device-ladder is about 35' high. Tank Farm T-401A,~B & C III - Install toe boards III - Cover floor holes T-402, 405, 422, 452 & 460 III - Ladder is substandard - side rails are 14" apart L--'" Dikes IT - Install handrails on all cross over steps CCR 000016563 farehouse II - Add toe board to midrail on handrail overhead storage area H-202A II - Install portable handrail on platforms at north & south heads ESTIMATED COMPLETION DATE Completed Completed Completed Being reviewed Completed Being reviewed Being reviewed Being reviewed Completed Completed Being reviewed Completed Completed 11-01-76 Completed Completed Being reviewed PRE-TURNAROUND INSPECTION OF WALKING & WORKING SURFACES - VCM PLANT TITLE C-101 Steam Stripper Install vertical bars in opening between ladder cage and railing C-202, HC1 Column Screens should be installed on already existing metal platforms from ladder cages to handrails. C-103 Heavy Ends Column 'z Install safety screens in opening between ladder cage and railing ESTIMATED COMPLETION DATE Comp!eted Compl eted Compl eted 000016564 CCR