Document KJLrJXNK2312gVbgELGONmDgX
PLANT MANAGER'S SAFETY BOARD MINUTES OF MEETING NOVEMBER 25, 1981
Present were:
G.A. Danner G.W. Daues J.A. Glass D.E. Kaldenberg B. Nappier for B.C. Lancaster J.J. McClellan A.J. Bolton for C.M. McCullough
D.W. Metten C.F. Navarrete M.L. Owens J.J. McClellan for G.T. Ryan D.R. Wise for J.G. Trafton M.A. Riddle, Visitor
I. REVIEW OF STATISTICS--J.A. Glass A. Texas City Plant Safety Performance Summary - October 1981
TOTAL INJURY CASES
RECORDABLE CASES
(A) WITHOUT LOST WORKDAYS (medical treatment only)
(B) LOST WORKDAYS **Bi RESTRICTED ACTIVITY **b2 days AWAY FROM WORK (C) FATALITIES
*TOTAL RECORDABLE CASES
1980 OCT. YTD
23 200
1981
1981
OCT. YTD TARGETS
23 219
2 9 1 16 9
0 20 6 2 0 00 0-- 0 2 0 6-- 0 '0 0 1 0 --
2 11 __ 1 22 11
INJURY RATES PER 200,000 MANHOURS
1980 MTD YTD
1981
1981
MTD YTD TARGETS
TOTAL INJURY - TIR
14.41 13. 76 14.76
TOTAL RECORDABLE - TRR
1.25 0. 76 0. 64
TOTAL LOST WORKDAY - TLWR 0.00 0.14 0.00
DAYS-AWAY-FROM-WORK - DAWR 0.00 0.14 0.00
15.35 1.54 0.42 0.42
-- 0. 64 0.12 --
YTD 1981 MCIC TARGET YTD ---------------
1.84 1.46 ----- 0.28 ----- 0.23
SC 003303
LAM004317
PMSB Meeting Minutes - November 25, 1981
Page 2
B. Comments on Statistics--J.A. Glass
At the end of October we completed over 1,000,000 manhours since our last days-away-from-work injury. We did have one recordable injury bringing the month's total to 22. The recordable occurred when an operator was in the process of making adjustments to a furnace. A flame flashed out of the inspection port resulting in first and second-degree burns to the operator's face and hand.
C. Contractor Safety--C.M. McCullough
The rates for the month of October were about equal to those in the past for both Capital Projects and total contractors. There were no recordables for the month.
D. CEP Project Safety--B.C. Lancaster
There were no recordables during the month. Safety awareness was up in SIP and subcontractors. The IDA II contract is reaching peak manning levels.
II. REPORT OF THE SAFETY ADVISORY COMMITTEE--G.W. Daues
A. New Policy On Wearing of Hard Hats in Vehicles in the Plant
SAC committee recommended that it not be mandatory that hard hats be worn in vehicles which have solid steel roofs. However, they recom mend that hard hats must be carried in the vehicle when driving about the plant to be used in the event of an emergency when cars are stopped and personnel need to evacuate the area. This policy was discussed and recommended for approval by the plant manager. A plantwide notice has been prepared and issued.
B. Interlock By-Passing
A proposed P-Bulletin on by-passing and testing of protective devices has been revised and was distributed for review. Return comments to SAC before the next SAC meeting on December 10.
C. Biennial Loss Reviews
After some discussion on whether these loss reviews should be held more or less frequently than every two years, the LP&S Superintendent requested that his department investigate the status of our Biennial Loss Reviews and will report back to SAC in December.
D. Safety Showers - New ANSI Standards
Bob Hammann of LP&S reviewed the new ANSI standards pertaining to emergency eye wash and shower facilities and recommended that five
LAM004318 SC
003304
PMSB Meeting Minutes - November 25, 1981 0
Page 3
(5) features be incorporated into plant stations. Some of these features appear to be expensive and give only marginal or questionable improvements. SAC is recommending that SHAC:
a) Define a standard for new safety showers and eye baths in the Texas City Plant.
b) Determine what, if anything, should be done to bring the current safety shower and eye bath stations up to OSHA and corporate stan dards.
c) Determine the need for and problems presented by making all shower stations freeze protected.
E. Contact Lens Policy
The plant manager has recommended a more detailed review of the policy and methods of compliance in other Monsanto plants.
III. REPORT OF THE PLANT SAFETY AND HOUSEKEEPING ACTION COMMITTEE (SHAC)--J.J. McClellan
A. 1981 Safety and Housekeeping Inspection October 13,14, & 15
The detailed recommendations of the Housekeeping Inspection Team are being compiled but have not yet been received. SHAC will develop an action plan for fulfilling the recommendations for at lease preparing the responses to their recommendations.
B. Status of S-T-A-R-T Safety Program--J.J. McClellan
Slides for the 4th quarter have not yet been made. A special session of the PMSB will be held in early December to review the slides. D.E. Kaldenberg requested that the Office Safety Committee prepare parallel slides for use in office safety meetings.
C. Hourly Safety Committee Item--J.J. McClellan
At the last Hourly Safety Committee meeting, Ed Crow presented the contractor videotape and discussed its use in the plant.
D. Emergency Procedure Plan Test
A request has been made for plantwide training in the proper response to emergency procedures in Incident Report 81-46. This will be done as a part of the plantwide EPP planned drill to be held in mid-December.
J
sc 003305
LAM004319
PMSB Meeting Minutes - November 25, 1981
Page 4
E. P-Bulletins
1- Second update has been issued. 2. Revision schedule has been developed by SHAC 3. All of the P-Bulletins have been reviewed by a member of SHAC
with indications of appropriate changes that are needed. 4. An outline of the status of each P-Bulletin has been developed
and will be circulated to members of SHAC and PMSB prior to setting target dates for revisions on all the bulletins.
IV. LOSS REPORTING--R.T. HAMMANN/J.A. GLASS
There are no outstanding reports. However, accounting reported that the financial data to accompany the last methanol plant outage had been supplied to methanol supervision. The final report should be issued shortly.
V. EMERGENCY VENTING SURVEY ACTION PLAN
Action plans have been delivered, target dates have been set for completion of the various sections. This report has been issued.
VI. 1981 S&PP SURVEY
This was a reminder that the responses to the S&PP Survey were due to LP&S on December 1.
VII. STATUS OF BREATHING AIR SYSTEM PROJECT
All operators are being trained. LP&S had some comments on the pro cedures to be used to notify the plant in case of an outage of the breathing air system. Startup target: end of the year 1981.
VIII. REVIEW OF INCIDENTS
The following Monsanto incidents were reviewed:
Date
Incident No.
Description
10/24/81
81-47
Flash fire--man burned face and hand while adjusting burners; Dept. 15 (R. Hernandez)
Contractor Incidents
Date
Incident No.
Description
11/03/81
C-81-16
While pushing down on a block, the board slipped resulting in lacera-
sc 003306
LAM004320
PMSB Meeting Minutes - November 25, 1981
1
Page 5
tion of fingers to Prewitt Construction man; Dept. 513 (C. Mata).
IX. OTHER ITEMS
A. Renewal of "Family Safety Magazine"
The Plant Manager's Safety Board approved renewal of this subscrip tion to be sent to all employees' homes.
B. MIECA Course
Mark Riddle reviewed the status of the MIECA Training Course, present status and level of performance. The Plant Manager's Safety Board requested that refresher courses be given on a regular basis. Mark outlined his plans for having two sessions per month. This met with approval of the board.
C. Emergency Procedure Drill
A proposal was presented by LP&S for a disaster drill to be held in mid-December. An outline was given to members of the board. The drill scenario and the date have not yet been established but will be reviewed and approved by the plant manager prior to the drill. There will be no publicity concerning the nature of the drill or the time. However, the date will be set.
D. "January" Plan
The Plant Manager requested a review of the plantwide program aimed at prevention of high injury rates that occur early in the year.
ps Attachment
J
J. Arnold Glass
Sc 03307
LAM004321
CED CONSTRUCTION TEXAS CITY PLANT
ACCIDENT STATISTICS
NUMBER OF CASES
Without Lost Workdays (Medical Treatment Only)
Lost Workdays (Days Away)
Fatalities
Total Injury Total Recordable
FREQUENCY RATES
Total Injury Total Recordable Total Lost Workdays
10/81
24 0
0
24 0
46.6
0 0
MANHOURS WORKED
103,056
SC 003308
YTD as of 11/1/81
32 16
0
134 21
49.1 7.7 5.9
545,619
LAM004322
v. :\0' _Total Injuries ^Total Injury Rate
1
Cummulative In ju r ie s
cummuxBuve tin
^ C u m u la tiv e Recordable In ju rie s '< U
j ) Cum m ulative IIIR
Recordable Injuries Recordable Injury Rate
-Ah.
C-.L.
V.AB.
AST!.
HAT
SC
JJM.
J'jL.
00339
AUG.
SEP.
CUT.
f.3V.
LAIVI004323
TOTAL PLANT CONTRACTOR SAFETY
TOTAL INJURY CASES RECORDABLE CASES LOST WORK DAY CASES DAYS AWAY CASES
YTD '81 51 12
5
TOTAL MANHOURS WORKED (MHW)
FREQUENCY RATES/200,000 MHW
TOTAL INJURY RATE TOTAL RECORDABLE INJURY RATE TOTAL LOST WORKDAY RATE TOTAL DAYS AWAY RATE
403,690
25.2 5.9 2.4
SeDt.'81 5 2
0
1980 Totals 87 13 0 3
58,690
525,532
17 6.8
0
33.1
4.9 0 1.1
SC 003310
LAM004324
Cummulative In ju r ie s
Total Injuries Total Injury Rate
1
%
Recordable Injuries Recordable Injury Rate
SC
003311
Cum m ulatlve R ecordable In ju rie s
Cummulative RIR
LAM004325
CAPITAL PROJECTS CONTRACTORS
TOTAL INJURY CASES RECORDABLE CASES LOST WORK DAY CASES DAYS AWAY CASES
YTD '81 11 3
2
TOTAL MANHOURS WORKED (MHW) FREQUENCY RATES/200.000 MHW
122,275
TOTAL INJURY RATE TOTAL RECORDABLE INJURY RATE TOTAL LOST WORKDAY RATE TOTAL DAYS AWAY RATE
17.9 4.9
3.2
Sept.'81 3 1
0 17,197
1980 Totals 41 6 0 2
232,120
34.8 11.6
0
35.3 5.1 0 1.7
SC 003312 LAM004326
CED CONSTRUCTION TEXAS CITY PLANT
ACCIDENT STATISTICS
TOTAL INJURY CASES
RECORDABLE CASES
(a) Without Lost Workday's (Medical Treatment Only)
(b) Lost Workdays 1. Restricted Activity 2. Days Away From Work
(c) Fatalities
Total Recordable Cases
Total Manhours Worked (MEW)
Frequency Rates/200,000 MHW
Total Injury Rate Total Recordable Rate Total Lost Workday Rate Total Days Away From Work Rate
9/81 4
1 txH Sc
0 1 0
61,882
12.9 3.2 3.2 3.2
YTD AS OF 10/1/81
110 21
8
0
16
0
442,563
49.7 9.4 7.2 7.2
SC 003313
LAM004327