Document KJ4q33Nq7QEwDjMmVZe5nD7V2

INTER-COMPANY AND INTER-DEPARTMENTAL CORRESPONDENCE TO: R. R. Dzurilln FROM: DATE: SUBJECT: E. J. Jago September 8, 1972, HOT TOPS FOR KEiUnLIC STEEL NOTE 1) The sample boards for REPUBLIC-WARREN manufactured from a low asbestos Profax or from low asbestos Proflex* must be ready for shipment before September 25til. Templates will be ready for you to use-if the Proflex* version is decided upon. Harold Wright will.decide on how many should be used in the first test run and see that the tests are run before October 1st. I suggest that at least two (2) pallets should be prepared ready for ship ment. F. A. Habeeb will organize any paper work that is required. 2) Samples of the one-piece 34 >: 34 hot top, for Republic-Chicago, made in a`low asbestos formulation must also be shipped by the 25th of September. In my opinion, at least two days will be required but the actual number will be decided by R. Holbrook. Again F. A. Habeeb will organize any paper work required.. The test program will be orgainized by W. Gregory. As you know, these programs are of vital importance to our future. FOSECO expects everybody to provide you with maximum cooperation, the tests to be run on schedule and overtime is to be worked if required. I know you and all concerned will attempt to see that our future is protected. EJJ/cel Cc: P. A. Partington R. Porter R. 13. Orndorff R. T. Callahan R. Horevar J. Mohr K. Tobr.r N. D. Wilcox W. C. Fletcher Don Butler H. D. Wright R. Holbrook F. A, Habeeb R. C. Phoenix T. Bernardi D. A. Towless E. J. Jago ' 71* ' I W. C. Sutherland^ H. D. Shephard 1 V. Me Hews (FIT.) M. Mellodey (Fib) J. D. Schmidt M. Finley R. R. Kunz