Document KGzxBNrX144vRm4G43XKdn3O0

Central* Engineering De PARTMENT 9.7 19*7 CEA NO. PROGRESS REPORT AR NO. DATE 1430 PRODUCT Dec. 20, 1967 TITLE Aroclors'" increase Aroclor Capacity" DISTRIBUTION CED SECTION MANAGER ced project manager R P SteVenS R W. Peterson DIVISION Orcranic DIVISION REPRESENTATIVE PLANT Anniston W. F. Taffee 0. R. Bailey J. M. Depp M. Dmytryszyn R. E. Emling F. W. Enoch F. J. Holzapfel R. W. Kaltenrieder F. P. LaBelle R. E. Lenz Russell L. Miller E. Negro C. L. Parish A. B. Terry (2) ORGANIC DIVISION H. C. Carder (^J. Creese^> R. J. Stratmeyer H. L. Williams W. J. Burkett R. R. Cook/J. R. Fullgraf R. E. Howard SCOPE Aroclor production facilities at Anniston will be expanded by the addition of tankage for storage and for the preparation of blends, drumming facilities in a new building (to be expanded on another project, CEA 1452, into a product warehouse), new and larger flakers for solid Aroclors and for biphenyl in the same building, and packaging equipment for flaked products. Tank truck loading and a new track spur with tank car loading and unloading facili ties are included. qSMM 200^62 CONFIDENTIAL INFORMATION THIS DOCUMENT IS THE PROPERTY OF MONSANTO COMPANY AND THE RECIPIENT IS RESPONSIILE FOR ITS SAFEKEEPING AND DIS POSITION. IT CONTAINS CONFIDENTIAL INFORMATION WHICH MUST NOT IE REPRODUCED, REVEALED TO UNAUTHORIZED PERSONS OR SENT OUTSIDE THE COMPANY WITHOUT PROPER AUTHORIZATION. STLCOPCB4058726 uo -2- Product. Title Aroclors Increase Aroclor Capacity Udid 1 dDUIdICU nj UI Location. 1430 Anniston Appropriation Current Estimate Date of Estimate Expended & Committed Spent This Month Scheduled Completion On Schedule? MS 1.400 MS 1.400_____________:__________ 1 Process Design, % Complete December 18. 1967 MS 182.9 MS 16.9 fMechanical Design, % Complete | Construction, % Complete H% Expended & Committed July and October 1968 0 Design Manpower Yes RConstruction Manpower Last Month 65 20 -- 9 3 -- This Mo. 70 35 -- 13 10 -- SUMMARY: The project is on schedule for tank farm start-up 7/1/68 and the flakerpackaging area 10/1/68. Field work will begin in January. Tank Farm: The layout of the tank farm and loading docks is firm. Details of the blend tanks and accessories are now under design, with most plant comments recon ciled. Pumps, tanks, filters, heaters, aluminum pipe and valves are on order. Foundation and structural design is well along. Field work will be gin in January on sanitary sewers and excavation for foundations. Equipment setting should begin in late February. Tank farm start-up is scheduled for July 1, 1968. Flaker-Packaging: The biphenyl flaker was ordered. Bagging machine tests were made. Flaker layout studies are underway. The style of flake-breaker and need for an elevator must be resolved before firm layout and conveyor design can be made. Our target for firm layout of this area is 2/1/68 including plant agreement. Start-up of the flaking-packaging area is tentatively scheduled for 10/1/68. Coordination With Warehouse CEA 1452: The layout, accounting, fire protection details of coordination between CEA 1452 and CEA 1430 have been agreed to. Coordination between and joint exe cution of these two projects- ia estimated-ta save $.40,000; we are determined to save it. Procurement and construction of the common building will be executed through CEA 1452. R. W. Peterson Acting Project Manager vo Dsvv 200663 STLCOPCB4058727