Document KGoXdKeeLD3KwaNE8OXKkRkjK
J. R. Savage - St. Louis - B2SL
OUne 6, 1972 Cost vs Quality July WC Phosphate Run
V. X. Richard 3*
H. S. Bergen
r~(
J. H. David son
J. P. Herber - T3Q
R. N. Kountz - F4VA
E. D. Malone - 1760
i. L. 60lari - 1760
We need to adopt an operating philosophy tor the coming WC Phosphate run that will give us an acceptable cost and quality.
I propose that we operate as followst
1) Drop the level of silicic acid treatment to a level consistent with full rate operation (2H lb/mo.). This level will be about 0.3$ vs the current 1.50. Using soft water for all production, we should see some fairly good product as to the emulsion test but we can't predict how much, if any, will pass. This seems like a fair gamble in the marketplace vs a cost penalty of about $150,000 If we Btay at the 1.5* level.
2) We will control output of Step XIX reaction mass to
hold down Inventory of alkaline materials prior to
continuous washing. This may cause a 5-10$ capacity
loss but should give us a major yield Improvement If
we have Interpreted the May results correctly. Bet
ter yield may help quality.
'
3) Since phenol (unsubstituted) content is the one quality parameter that has cost us business, we should modify deodorizer conditions to strip as much phenol as possible.
Manufacturing 1b still committed, longer-term, to passing the emulsion test and achieving an acceptable content of all phenols. However, 1 consider the above plan of action to represent the best cost-performance situation for this run.
3. R. Savage Al
0065727