Document KGe152Bdajn0OYMOgqgZ2JJr
PLAINTIFF'S EXHIBIT
ASA-1083
Brown Rootlnc. I'oM Office Box Three, Houston, Texas 77001
A Halliburton Company
R G. Netberv
Senio' Mantle* Manufacturing Construction Divts-;
May 31, 1983
Mr. W. A. Bennis Vice President, Purchasing ASARCO Incorporated 120 Broadway New York, New York 10005
ATTENTION: Mr. F. 0. Wittwer
REFERENCE: No. 2 Cottrell Expansion Project El Paso, Texas
RECEIVED
JUN 1 1983
A. DeSAiVTIS v J. R. SHAW
Gentlemen:
Brown & Root is pleased to submit this proposal for the above referenced
project. Our lump sum price to perform this work in accordance with your Invitation to Bid dated April 29, 1983, and as clarified by our visit to the site on May 17, 1983 and your subsequent letter dated May 20, 1983 is $1,799,560.00 (One Million Seven Hundred Ninety Nine Thousand Five Hundred Sixty Dollars). You may consider our price firm for a period of thirty (30) days from this date.
Should you deem it necessary for us to provide you with performance and labor and material payment bonds, please add $15,425.00 (Fifteen Thousand Four Hundred Twenty-Five Dollars) to the above price.
Included as ATTACHMENT I to this Proposal is our BASIS OF PRICING, which will define the basis upon which our lump sum price is submitted.
In response to your request for a method of compensation for the performance of extra work beyond that which is described in your Request for Quotation, we propose to perform such work under the terms and conditions of our REIM BURSABLE COST AGREEMENTS - BASIS OF COMPENSATION AND OTHER TERMS, which is included for your review as ATTACHMENT II.
We can mobilize our forces and begin this work within fourteen (14) working days from notice to proceed. We currently anticipate that two hundred twenty (220) working days will be required to complete all portions of the work. We plan to work forty (40) hours per week, with the exception of the shutdown period required for the work associated with the No. 1 Cottrell, at which time we plan to work two (2) 12-hour shifts per day. We do, however, reserve the right to work spot overtime at our discretion.
ASARCO ELP 0006947
Mr. W. A. Bennis Vice President, Purchasing ASARCO Incorporated Page Two
ATTENTION: Mr. F. 0. Wittwer
Our proposal is generally in accordance with the Technical Specifications and Commercial and Contractual requirements of the Request for Quotation. Although for the most part we find the inquiry documents acceptable, our proposal is predicated on the negotiation of a mutually agreeable contract which is consistent with a fully designed, competitively bid, construction project.
Brown & Root appreciates the opportunity to submit this proposal for the No. 2 Cottrell Expansion project at your El Paso plant, and we hope that it is favorably received. If I can be of further assistance to you or if you have any question, please call me.
Very truly yours,
cjg
Attachments
cc: Mr. W. T. Sweat
- Salt Lake City, Utah
Mr. P. A. De Santis - El Paso, Texas
Mr. R. 0. Covington - El Paso, Texas
ASARCO ELP 0006948
ATTACHMENT I
ASARCO INCORPORATED NO. 2 COTTRELL EXPANSION PROJECT
EL PASO, TEXAS
Having made a careful review of the bid documents and after visiting the site of the work, Brown & Root submits this proposal based upon the .following clarifications and quali fications :
1) No provision has been made nor allowance included in our price for the removal, repair or relocation of any underground obstruction not clearly shown on the drawings; nor for any delays or loss of producti vity due to such obstructions.
2) Our price is based upon cutting the existing flues and existing conveyors into random lengths and pieces at our discretion to facilitate removal.
3) No provision has been made nor allowance included in our proposal for any specialized requirements stemming from the presence of any asbestos insulation that is to be removed from existing equipment or flues. In the event that asbestos insulation is encountered, all costs incurred for recovery and disposal of the insula tion and all costs for special safety and medical con siderations will be considered to be a change in the scope of work for the project.
4) Relocation of any existing utility piping, electrical conduit, etc. alongside the existing flues is to be done by others.
5) Our price is based upon the new conveyors being supplied to us in a pre-assembled condition, with minimum field assembly required. All bolt and gasket sets required for installation of the conveyors are to be furnished by the Owner.
6) Our price is based upon utilizing foreign pipe materials at our discretion for the air system piping.
7) The 2-inch main air line tie-in point is to be within 30 feet of building line A-26, or building line W-26.
ASARCO ELP 0006949
ATTACHMENT I Page 2
8) Our price is based upon using a Vogt #12111 valve for the 2-inch air line shutoff valve.
9) Our price is based upon using Crane #36 2-inch check valves.
10) Due to the possible unavailability of Galbestos siding as called for on drawing number EP-32069-907-A, we reserve the right to use 22 gauge Molenco span rib siding sheets, with 3 mil plasticol coating on both sides, at our discretion.
11) Our price is based upon having a minimum of four (4) full 24-hour shutdown days to complete the work asso ciated with the No. 1 Cottrell. We currently plan to work two (2) 12-hour shifts per day during this period.
12) Our price is based upon the Owner providing utility services such as plant air and electricity in suffi cient quantities for construction requirements.
13) Our price is based upon providing insulation in accord ance with the specifications contained in your Invitation to Bid; however, we currently anticipate that the speci fied weather proofing will not be sufficient to satisfy the requirements of the expected conditions. We there fore recommend that further consideration be given to the weather proofing requirements.
ASARCO ELP 0006950
ATTACHMENT II
REIMBURSABLE COST AGREEMENTS BASIS OF COMPENSATION AND OTHER TERMS
January 1, 1982
Brown 3c Root proposes to perform the construction and related services requested by Client, with compensation to be the reimbursement of costs, plus a percentage fee, as follows:
A. Reimbursable Costs
(1) Salaries and wages at rates set forth in Exhibit A paid for labor and supervision employed in the performance of land operations plus _17_% of the dollar cost thereof to cover reimbursement of workmen's compensation insurance, payroll taxes and the other insurances identified in Exhibit B as Brown Sc Root furnished.
(2) Salaries and wages at rates set forth in Exhibit A paid for labor and supervision employed in the performance of marine operations plus \./a % of the dollar cost thereof to cover reimbursement of workmen's compensation insurance, payroE taxes and the other insurances identified in Exhibit B as Brown 3c Root furnished.
(3) Permanent equipment and materials, construction materials and supplies including expendable tools and supplies (See Exhibit C), subcontracts, rental of third party construction equipment, and the transportation of equipment, materials and supplies as well as aH other direct job costs, except as otherwise provided, shall be invoiced at 1.05 times the actual cost including aE taxes, if applicable.
(4) Brown Sc Root owned construction equipment employed in the prosecution of the work shall be invoiced at Eighty-Five percent ( 85 %) of and as provided in the Associated Equipment Distributors' rental schedule current at time of performance of the work plus any Ad Valorem Taxes levied while on this project other than that applicable at the permanent storage yard.
1 -----------------------------------------------------
ASARCO ELP 0006951
REIMBURSABLE COST AGREEMENTS - Continued
(5) Other direct job costs incurred or losses sustained by Brown & Root in connection with the work, not compensated by the insurance set forth in Exhibit B, provided they have resulted from causes other than the personal fault or neglect of Brown & Root's corporate officer responsible for the work as a whole.
B. Brown <5c Root's Fee
Brown & Root's fee shall be Nineteen and flafFpercent ( 19h %) of the costs reimbursable in Item A (1) and/or A (2) and covers the following elements:
(1) Supervision above the grade of project superintendent, non-expendable workmen's supplies, general facilities at home office, employer's portion of life and hospitalization insurance, vacation pay for qualified personnel, and employees' retirement and savings benefits.
(2) Losses and expenses due to personal fault or neglect of Brown & Root's corporate officer responsible for the work as a whole.
(3) Allowance for non-expendable small tools, such tools being defined as units of value not exceeding $300.00 per tool.
(4) General administrative and home office overhead costs and profit.
C. Miscellaneous Terms
(1) Brown <5c Root's warranty for its workmanship is limited to the correction of defects called to its attention within one year from completion of the work, with its liability for machinery, equipment or other products manufactured by others being limited to assignment to Client of the supplier's warranty and' cooperation with Client in the enforcement of same. AH such costs are subject to the provisions of A (5).
(2) Insurance and indemnity provisions applicable to the work are set forth in Exhibit B.
2
ASARCO ELP 0006952
REIMBURSABLE COST AGREEMENTS - Continued
(3) In no event shall Brown & Root be liable to Client for loss of use or product or other consequential damages.
r (4)
Payment of approved items on each invoice is due ten (10) days after presentation, with progress billings to be made not less often than monthly, without retainage. All trade discounts are to be credited to Client, while any cash discounts may be retained by Brown & Root.
(5) The normal work week for Brown <5c Root employees consists of five (5) nine (9) hour days, Monday through Friday. For all time over forty (40) hours per week, an employee is paid 1.5 times his basic hourly rate with such rate applying regardless of where prior time may have been worked as long as it was for Brown <3c Root. "Show-up" time is two (2) hours in accordance with Contractor's Standard Policy payable only if employee reports for work.
(6) Job clerks will be assigned to the project full time, if required, or a prorata portion will be charged as mutually agreed.
3 ASARCO ELP 0006953
r
i
\
i EXHIBIT A
Ii i
BROWN & ROOT, INC.
MANUFACTURING & PROCESS PLANTS CONSTRUCTION DIVISION CONSTRUCTION WAGE RATES JULY 4, 1982
t
CLASSIFICATION
HOURLY RATE
Boilermaker Brickmason Carpenter Cement Finisher Electrician Instrument Fitter Insulator Ironworker - Reinforcing Ironworker - Structural
Laborer - Common Laborer - Semi-skilled Mechanic - Heavy Duty Millwright Oiler Operator - Heavy Operator - Light Painter - Spray Painter - Brush Pipefitter Rigger Truck Driver - Heavy Truck Driver - Light Welder - Pipe Welder - Structural Helper - Grade I Helper - Grade II Helper - Grade III Party Chief Instrument Man Rodman - Chainman
12.50 12.80 12.25 12.25 12.50 12.50 12.35 12.25 12.35
5.10 - 6.95 5.70 - 7.70
12.25 12.50 7.10 - 8.50 12.35 11.40 12.25 11.90 12.50 12.35 10.35 9.45 12.50 12.35 9.05 -10.80
7.15 - 9.00 Open - 7.10 10.15-14.45 8.75 -12.50 7.55 -10.80
Laborer Foreman Laborer General Foreman
7.60 -12.25 .80 - 1.30 Above Laborer Foreman
Leaderman Foreman General Foreman
.40 - .90 Above Journeyman Rate .80 - 1.30 Above Journeyman Rate 1.35 - 1.85 Above Journeyman Rate
Rates for classification not listed to be mutually agreed upon. The listed rates are subject to review and adjustment consistent with area practice.
ASARCO ELP 0006954.
J
EXHIBIT B INSURANCE AND INDEMNITIES
A. Brown & Root - Provided Insurances
(1) Workmen's Compensation Insurance: Statutory. (2) Employer's Liability Insurance: Limitations ... $100,000. (3) Comprehensive General Liability Insurance:
Limitations, Bodily Injury ... $100,000/300,000; Property Damage ... $100,000 with endorsement to cover, subject to policy provisions, that liability assumed by indemnity clause. (4) Comprehensive Automotive Liability Insurance: Limitations, Bodily Injury ... $100,000/$300,000; and Property Damage ... $100,000. Should marine operations be involved, paragraph (2) above shall include the following additional coverages: (a) U.S. Longshoreman's & Harbor Worker's Compensation Act (b) Outer Continental Shelf Act (c) Voluntary Maritime Compensation Endorsement, including
transportation, maintenance, wages and cure. (d) The policy is also endorsed to provide protecton for In Rem
actions. Brown & Root will provide special additional insurance, if requested by Client, with reimbursement of premium at invoiced cost. B. Brown & Root's Indemnity
Brown & Root shall indemnify and hold harmless the Owner from all third party claims resulting from Contractor's performance of the work, provided that any such claim (1) is attributable to bodily injury or to damage to tangible property (other than the work itself or Client's existing facilities which are covered as indicated in Item C below) and (2) is caused in whole or in part by the negligent act or omission of Brown & Root, or anyone employed by it, except to the extent it is caused by the Client or his employees. The foregoing indemnity is limited to (1) the insurance coverages and amounts set forth in Section A, and (2) accidents occurring during the performance of the work.
1
ASARCO ELP 0006955
INSURANCE AND INDEMNITIES - Continued C. Coordination of Insurances with Client
Agreements arising out of this proposal are based on the Client's having complete insurance coverage against all loss of (including loss of use) or , damage to the work and Client's existing facilities. Where Client does not have such coverages, it is assumed that Client will self-insure such risks or have Brown & Root obtain such insurances as special additional insurance as mentioned in the last sentence of A above. In any such case of insurance or self-insurance, Brown & Root will be co-insured. D. Subrogation Waivers The insurances set forth above as well as any others (whether of Brown <5c Root or Client) relating in any way to the work undertaken shall contain mutual waivers of subrogation.
2
ASARCO ELP 0006956
EXHIBIT C
LIST OF REIMBURSABLE EXPENDABLE MATERIALS, SUPPLIES AND TOOLS
This is a list of expendable construction materials, operating supplies and tools. Items not appearing on this list which are generally accepted as expendable shall be considered a part of this list.
r "Expendable" items are defined as materials, supplies and tools ised to aid in the construction of a facility but which do not become a permanent part thereof.
Anti-Freeze Benches Barrels - Trash, Water Barricades Batteries Blades - Hacksaw, Power Saw
Boards - Scaffold Bolts - Construction Boni-Ami Boots - Rubber Bricks - Rubbing Brooms Brushes - Wire, Paint, Water Burlap Cable Clips Cable Wire Carborundum Stones Chalk Chalk-Line Chisels Clamps - Cable "C" Form
Cleaning Equipment Brooms Mops
Fluid Cloth - Emergy, Sandpaper Conduit Pulls Coolers - Drinking Crayons Cups - Drinking, Paper Dope-Pipe, Thread, Gasket Dies
Pipe Bolt Drills - Star Drill Bits - Wood, Steel, Rock Electric Wire <5c Fixtures (Temporary) Extension Cords Files Iron Steel Wool Rasp
Filter Packs Fire Extinguishers <5c Charges First Aid Supplies Fuses Flares Garden Rakes
Garden Hose Gas Masks
Gasoline Gloves - Rubber Dipped Canvas Goggles - Safety Grease Grinding Wheels Handles
Shovels Hammer Pick Hoes
Garden Mortar Hoods - Sand Blast
Hose - Water, Air, Steam, Paint Sand Blast
Hose Clamps
Ice Ice Boxes Kerosene Ladders - Step Lenses
Goggle
Welders Hoods Light Bulbs
Lowering in Belts (Pipe Carrying) Lumber
Protection of Materials Protection of Property
Runways - Platforms Shoring Survey Stakes Concrete Forms Sheds Nails Nozzles - Sand Blast
ASARCO ELP 0006957
LIST OF REIMBURSABLE EXPENDABLE MATERIALS, SUPPLIES AND TOOLS - Continued
Oils Diesel - Construction Equip. Lubricating
r Pipe Cutting Paint, Etc.
Oil Filters and Cartridges Oil Cans Padlocks Pails - Buckets, Cans
Paper Kraft Paper Protection of Materials Protection of Concrete Tar Paper Toilet Paper Paper Towels
Pig Tails Pipe Tools
Cutter Wheels Dies Pins - Flange, Structural Steel Punches Ra^ - Wiping Raincoats 6c Rain Suits Respirators Rollers - Pipe Rope Rulers - Pocket Salt 6c Dispensers Signs Skids Steel Wood Soap
Soapstone Solder Screws Switches Tape
Friction Measuring Rubber Fish Tarpaulins Thermometers Tie Wire Tips for Welding 6: Cutting Torches Tip Drills Twine Water - Bottled Waste-Cotton Welding Hose Welding Supplies Acetylene Carbide Flux
Oxygen
Welding Rods, Electrodes Lighters 6c Flints Helpers Hoods 6c Goggles Electrode Holders Electric Welding Leads (Cable) Wire - Piano
Boomers Load Chains Blocks
-- I.---
"
2
",
ASARCO ELP 0006958
BROWN <5c ROOT
MANUFACTURING & PROCESS PLANTS CONSTRUCTION DIVISION CENTRALIZED SERVICES
EXHIBIT D
The Manufacturing <5c Process Plants Construction Division maintains a central services organization for the purpose of providing services to projects for the delivery of equipment (within certain weight limits), materials, supplies and tools, and fuel and grease units for servicing construction equipment. Any project may request these service as their needs dictate.
Rates quoted below are fully operated and maintained and include all taxes, insurance, fringe benefits, and applicable overhead including meals and lodging for out of town deliveries. Permits, when applicable, will be reimbursable at cost. These rates are subject to periodic review and adjustment consistent with area practice.
TRANSPORTATION AND DELIVERY SERVICE RATES
A. Lowboy Local (inside 50 miles radius of Houston) Out of Town (outside 50 mile radius)
B. Flatbed Local (inside 50 mile radius of Houston)Out of Town (outside 50 mile radius)
C. Fuel and Grease Unit (for local use only) D. Pickup and Delivery (for local use only) E. Labor only
$3 5.00/HR. $4 2.00/HR.
$25.00/HR. $3 0.00/HR. $2 5.00/HR. $16.00/HR $12.00/HR.
Effective Date: June 27, 1982 ASARCO ELP 0006959
April 1982
1982 AED RENTAL RATES (From'33rd Rental Compilation")
TYPE TRACTORS
DESCRIPTION
LOADERS - PNEUMATIC
Ford 3000 & 3600 MF-20 Cat 920 - 1% Yd. Cat 950 Cat 980B -4H Yd. Case 1845 Cat 966C - 3% Yd.
LOADER-HOE - PNEUMATIC
MF-40 MF-50C & Case 580C JD 444 MF-60 - Yd. Case 580D
DOZERS - CRAWLER
Case 450 Cat D-3 D-4D D-5 LGP D-6 (Series C S D) D-6 w/Winch D-7 (Series G) D-7G w/Winch D-8K D-8 w/Winch D-9H
LOADERS - CRAWLER
Cat 94TB - 1H Yd. Cat 955L - 2 Yd. Cat 977L - 2-3/4 Yd.
SIDEBOOMS - CRAWLER
JD 450C w/Winch Cat 561
MONTHLY RATE
WEEKLY RATE
DAILY RATE
PAGE REF.
$ 879.00 805.00
2,504.00 4,055.00 7,169.00 1,309.00 5,593.00
$* *
840.00 1,345.00 2,345.00
470.00 1,874.00
$* *
251.00 407.00 598.00 136.00 573.00
irk
*
50 50 50 49 50
1,588.00 1,502.00 2,504.00
2,100.00 1 ,880.00
512.00 473.00 840.00 710.00 625.00
157.00 173.00 251.00
*
it
48 48 50 48 48
1,841.00
609.00
it
47
2,315.00
763.00
it
47
2,315.00
763.00
*
47
3,701.00
1,223.00
it
47
4,913.00
1,530.00
it
47
5,991.00
*
* irk
7,239.00
2,304.00
47
8,453.00 * - *
10,008.00
*
it 47
10,260.00
*
it **
12,138.00
4,060.00
it
47
3,146.00 4,055.00 6,208.00
1,075.00 1,307.00
*
340.00 396.00
47 47 47
2,671.00 3,898.00
it
*
* ** it **
ASARCO ELP 0006960
AED Rental Rates
TYPE
DESCRIPTION
DITCHING MACHINES
-2-
MONTHLY RATE
WEEKLY RATE
April 1982
DAILY RATE
PAGE REF.
Trenchers - Inclined chain boom type are listed on Page 63 of AED Book.
Please consult Book for specific machine required according to HP., weight, depth, and width of machine cut.
CRANES & DRAGLINES
CRAWLERS - DIESEL
41 & LS-78 - 1 Yd. - 15 Ton 6-1% Yd. - 25 Ton 95 WT - 3 Yd. - 60 Ton 50D & LS-118 - 50-60 Ton 70D - 80 Ton 3900, LS-338 & LS-418 - 100 Ton 4000, 3900W & LS-518 - 150 Ton 4100 - 200 Ton
4100-S2 & 4600-S3 - 230-240 Ton 4600-S4 - 350 Ton
$ 2,417.00 5,334.00 7,539.00 6,955.00 7,305.00 8,180.00
14,540.00 16,980.00 16,980.00 36,145.00
$ 713.00 1,850.00 *
2,510.00 3,221.00
* *
11,930.00
$*
* * *
* * *
2,865.00
24 24 **
22 22 22 22 22 22 ***
Manitowoc 6000, Ringers & Tower Attachments not listed in AED Schedules or Blue Book. Rates on request.
TRUCK MOUNTED - DIESEL
650TC - 50 Ton 60T - 60 Ton
5,563 . 00
*
22
6,346.00
2,131.00
22
2900T - 70 Ton
7,546.00
2,721.00
it
22
P&H 790 & HC218 - 82 - 90 Ton
7,546.00
2,721.00
it
22
P&H T750 - 75 Ton Hydraulic
6,806.00
2,008.00
it
23
HYDRAULIC BACKHOE - DIESEL
Bantam 166 - 3/4 Yd. Cat 225 - 1-3/8 Yd. Cat 235 - 2 Yd. Cat 245 - 3 Yd.
3,808,00 5,245.00 8,159.00 11,783.00
1,264.00 1,737.00
3,849.00
387.00 545.00
*
it
25 25 25 25
CHERRY PICKERS - HYDRAULIC
Broderson 1C7C1A - 6 Ton Gas
Drott 85RM2 & Broderson 1C701A(5 to 8 Ton Diesel)
Gal ion 150 A&F - 15 Ton Grove RT-65S - 35 Ton Badger 4445 i Grove RT-75S
(45 - 50 Ton) Basket Lift-36'- 42' Basket Lift - 46' - 50' Basket Lift - 60* - 66'
1,715.00
1,898.00 2,804.00 4,692.00
5,429.00 2,057.00 2,547.00 3,383.00
574.00
662.00 889.00 1,727.00
1,787.00 689.00 838.00
1,167.00
202.00
234.00 297.00 538.00
559.00 240.00 280.00 409.00
23
24 24 24
24 31 31 31
ASARCO ELP 0006961
AED Rental Rates
-3-
April 1982
TYPE
DESCRIPTION
MONTHLY RATE
WEEKLY RATE
DAILY RATE
PAGE REF.
PUMPS
CENTRIFUGAL - HOSE NOT INCLUDED (Consult Paoe 40 for Hose Rates)
4" das
4" Diesel 6" Diesel 8" Diesel 10" - 200 Barnes 12" - 1211 Klein
$ 382.00 603.00 857.00
1,234.00 1,538.00 3,095.00
$ 134.00 202.00 293.00 430.00
538.00 *
$ 45.00 67.50 94.50 131.00
175.00 *
38 38 38 38 38 **
ASPHALT & CONCRETE EQUIPMENT
MIXERS
11-S (11 cu. ft. ) 16-S (16 cu. ft. ) Pulvi Mixer - Bros LSPRM8
1,200.00 1,390.00 5,017.00
430.00 500.00 1,678.00
140.00 160.00 650.00
irkit
***
60
SPREADERS
Barber Green SA-41 Blaw-Knox PF-65 Barber Green SB140
7,532.00 7,377.00 7,377.00
*
2,150.00 2,150.00
*
it
56 56 56
ROLLERS & BROOMS
BROOMS
Self Propelled
1,300.00
388.00
138.00
54
SHEEPFOOT ROLLERS
Single Drum - Small Double Drum - Small Double Drum - Large Single Drum - Large
433.00 535.00 811.00 811.00
147.00 193.00 268.00 268.00
56.25 69.75
87.00 87.00
12 12 13 13
COMPACTORS
Cat 815
4,884.00
1,471.00
503.00
12
VIBRATORY COMPACTORS
I-R SP-42 - Diesel I-R SP-54, SP-56DD &
Dyna-Pac CA25PD - Diesel
2,288.00 3,083.00
* 960.00
* 326.00
14 14
STEEL ROLLERS
4-6 Ton Tandem (Gas) 8-12 Ton Tandem (Diesel) 8-10 Ton 3-Wheel (Diesel) 12 Ton 3-Wheel
895.00 1,873.00
720.00 1,443.00
306.00 626.00
*
94.25 211.00
* *
n 12
* **
ASARCO ELP 0006962
AED Rental Rates
-4-
TYPE
DESCRIPTION
ROLLERS & BROOMS (CONTD.l
MONTHLY RATE
PNEUMATIC ROLLERS
12 Ton Gas - 9-Wheel 12 Ton Diesel - 9-Wheel 25-30 Ton Diesel - 11-Wheel
WELDING EQUIPMENT
$ 1,331.00 1,437.00 2,825.00
300 Amp Electric 200 Amp Gas 250 & 300 Amp Diesel 8-Bank Welder
GENERATOR SETS S SAWS
177.00 307.00 397.00 756.00
40 KW 50 KW 60 KW 75 KW 100 KW 135 KW 250 KW
Concrete Saw - 36 HP (No Blade)
857.00 964.00 1,203.00 1,203.00 1 ,393.00 1,669.00 2,592.00 565.00
AIR COMPRESSORS
85 CFM - Gas
100 CFM - Diesel - Silenced 125 CFM - Gas 160 CFM - Gas 160 CFM - Diesel 175 CFM - Diesel - Silenced 250 CFM - Diesel 335 CFM - Diesel - Silenced 365 CFM - Diesel 375 CFM - Diesel 600 CFM - Diesel 700 CFM - Diesel 700 CFM - Diesel - Silenced 750 CFM - Diesel 900 CFM - Diesel 1400 CFM - Diesel - Silenced 250 CFM - Electric 600 CFM - Electric
315.00 406.00 377.00 455.00
492.00 497.00 746.00 '983.00 933.00 1,017.00 1,345.00 1,554.00 1,390.00 1,609.00 1,901.00 3,567.00 601.00 1,529,00
MAINTAINERS
JD-570A Cat 12G, 130G, & 140G Cat 14G
Cat 16G
3,771.00 4,386.00 6,325.00
8,830.00
WEEKLY RATE
Aprll 1982
DAILY RATE
PAGI REF
$ 449.00 473.00 893.00
$ 154.00 157.00 280.00
10 11
11
64.25 114.00 151.00
*
21.50 35.75 51.00
*
64 64 64 **
282.00 327.00 398.00 398.00 481.00 548.00 880.00 204.00
97.00 133.00 140.00 140.00 188.00 191.00 333.00 64.00
58 58 58 58 58 58 58 19
109.00
130.00 158.00 172.00 170.00 253.00 328.00 326.00 356.00 477.00 529.00
*
568.00 639.00
*
223.00 531.00
34.25 *
40.25 50.75 54.00 55.00 82.75 110.00 113.00 114.00 153.00 177.00
182.00 212.00
* *
2 **
2 2 2 3 2 3 2 2 2 2 3 2 2 *
4 4
*
1,203.00 * *
358.00 * *
59 59 59
59
ASARCO ELP 0006963
J
AED Rental Rates
-S
TYPE
DESCRIPTION
MONTHLY RATE
SCRAPERS & REAR DUMP TRUCKS
15 Yd. Towed Cat 513 Cat 621B Terex TS-24 Terex TS-18 Int'l. 350 Rear Dump
$ 1,961.00 4,827.00
10,988.00 18,131.00 11,737.00 14,281.00
GRADALLS
G-660 Truck G-660 Crawler G-880 Crawler
6,068.00 5,241.00 6,148.00
MAGNETIC SWEEPERS
1,725.00
TRAILERS
Float Trailer 40/60 Stretch Float Trailer 40 Ft. Lowboy Trailer Pole Trailer
654.00 445.00 1,754.00 217.00
TRUCKS
Transport - Diesel Tandem Transport - Diesel Single Transport - Gas Single Flatbed & Flatbed Dumps (F-600) Flatbed & Flatbed Dumps
(F-700 & F-800) Winch Truck Winch Truck (Crew Cab} Distributors Dump Truck - Small (6 to 8 Yd.) Dump Truck - Large (12 to 14 Yd.)
Service Truck Water Truck (F-600) Water Truck (F-700)
Bus Stakebed Truck (F-350) Welding Truck (F-350)
2,916.00 2,117.00 1,210.00
778.00
1,294.00 794.00 853.00
1,557.00 1,330.00 2,465.00 1,330.00
801.00 851.00 763.00 589.00 589.00
PICKUPS
1/2 Ton (F-100) 5/8 Ton (F-150) 3/4 Ton (F-250) Crew Cab 4-Wheel Drive Club Wagon
Scooters
368.00 398.00 456.00 456.00 520.00 604.00
242.00
WEEKLY RATE
April 1982
DAILY RATE
PAGE REF.
$*
1,574.00 *
5,585.00 * *
$*
467.00 * * *
*
irk
51
51 51 51
* 1,515.00
*
*
* *
*
26 25 25
**
** * ** * ** * * **
* * * * * irk * * irk * * it*
* ** * * **
* **
* irk * ** * **
* * **
* * **
**
* * **
* * ** * *
* * ** * * ** * * ** * * ** * * ** * * ** * * **
ASARCO ELP 0006964
AED Rental Rates
-6-
April 1982
TYPE
DESCRIPTION
MONTHLY RATE
WEEKLY RATE
DAILY RATE
PAGE REF.
PILEDRIVING EQUIPMENT
Hairpin * Steam Hammer - #7 Diesel Hammer - D-12 & D-15 Diesel Hamer - D-22 Diesel Hamer 520 MKT Vibratory Hammer V-16 Extractor - 400 & E-4 Extractor - MKT V-14 Steam Hammer MKT - 10 B3
$ 289.00 1,100.00 2,245.00 3,508.00 2,875.00 9,850.00 1,356.00 8,400.00 1,836.00
$*
447.00 912.00 1,521.00 1,150.00 4,267.00 436.00 3,713.00 814.00
$ ** * * * * * *
itit
34 34 34 34 35 34 35 34
NOTE: Hamer Rates Do Not Include Leads & Helmets.
HOISTS
2-8,000 # - 1, 2, & 3 Drum 8-11,000 # - 1 & l Drum 8-11,000 # - 3 Drum 11-15,000 # - 1 & 2 Drum 11-15,000 # - 3 Drum
1,304.00 1,348.00 1,740.00 2,346.00 3,051.00
* * * * *
* ** * ** it ** * **
It **
FORKLIFTS (YARD TYPE) CONSTRUCTION
3,000# 4,000# 5,000# 6,000# 8,000# 10,000# 12,500# 16,500# 20,000#
776.00 878.00 950.00 1,112.00 1,138.00 1,210.00 1,410.00 2,014.00 2,137.00
278.00 290.00 327.00 396.00 402.00
* * *
81.00 93.00 101.00 126.00 127.00
it
it
*
it
56 56 56 56 56 56 ** **
irk
(HIGH LIFT TYPE)
4,000# 6,000# 8,000#
1,560.00 2,234.00 2,636.00
540.00 734.00 844.00
165.00 228.00 256.00
61 61 61
AUTOMOBILES
Sedan - Light (Ford) Sedan - Heavy (Olds) Station Wagon
408.00 544.00 444.00
* * it
* **
it irk it irk
NOTE: Automotive unit rates are based on Brown S Root, Inc. standard units. Special units or units equipped above standard to be negotiated as issued.
Rates include license, insurance, major repairs, and no mileage.
ASARCO ELP 0006965
AED Rental Rates
TYPE
DESCRIPTION
BUCKETS CLAMSHELL
3/4 Yd. 1 Yd. 1-1/4 Yd. 1-1/2 Yd. 2 Yd. 2-1/2 Yd. 3 Yd.
r
DRAGLINE
3/4 Yd. 1 Yd. 1-1/4 Yd. 1-1/2 Yd. 2 Yd. 2-1/2 Yd. 3 Yd.
CONCRETE - BOTTOM DUMP
1/2 Yd. 3/4 Yd. 1 Yd. 1-1/2 Yd. 2 Yd.
-7-
MONTHLY RATE
WEEKLY RATE
April 1982
DAILY RATE
PAGE REF.
$ 384.00 413.00
485.00 503.00 636.00 768.00 908.00
$ 132.00 136.00 *
158.00 198.00 231.00 273.00
$ 42.25 46.50 *
58.25 63.00 80.25 99.00
26 26 26 26 26 26 26
262.00 313.00 355.00 355.00 450.00 564.00 639.00
92.00 110.00 128.00
128.00 160.00 189.00 209.00
31.25 37.75 42.00 42.00 49.25 63.25 77.50
26 26 26 26 26 26 26
149.00 176.00 205.00 248.00 290.00
53.00 62.00 73.75 84.50 98.00
19.00 22.25 27.50 31.50 41.25
16 16 16 16 16
KEY
* Insufficient Information Available ** Rate arrived through Brown & Root calculation. *** Rate compiled from "Blue Book Rental Rates for Construction Equipment".
These rates not adjusted for area of operation.
ASARCO ELP 0006966
I
CENTRAL ENGINEERING DEPT. DESIGN SECTION______________
Salt Lake City, Utah April 14, 1983
Mr. W. T. Sweat Salt Lake Office
EA-54-EP, N.Y. 5720, PLANT 687 EL PASO PLANT #2 COTTRELL EXPANSION ENGINEERING PROGRESS REPORT NO. FILE 6.6____________________
4
The attached report outlines the status of the referenced work as of April 14, 1983.
AOM:pr Attach. cc: P.A. DeSantis
Carl Glaser
w/attach. "
ASARCO ELP 0006967
CENTRAL ENGINEERING DEPT DESIGN SECTION
Salt Lake City, Utah April 14, 1983
Mr. A. O. Marsh, Jr. Salt Lake Office
EA-54-EP, N.Y. 5720, PLANT 687 EL PASO PLANT #2 COTTRELL EXPANSION ENG. PROGRESS REPORT' NO. 4
Attached is the monthly Progress Report for engineering work accomplished on the above project.
RRJ:pr Attach
Project En.girieer
ASARCO ELP 0006968