Document KGMzqjQKq4oMY5VGXOVvvmqMN

SUMMARY OF HUDSON RIVER PCE STUDY RESULTS L. Hetling, E. Horn, and J. Tofflemire NTS Department of Environmental Conservation Bureau of Water Research 50 Wolf Road Albany, New York 12233 April 1978 (Revised - July 1978) HUNS 007862 TABLE OF CONTENTS I. Background A. The Study Program B. The Hudson River Basin C. Historical Perspective - II. Summary of Current Findings A. Data on River Sediments andHydrology 1. Upper River a. Sediments b. Vater column c. Sediment transport 2. Lower River (Estuary) a. Sediments b. Vater column c. Sediment transport B. River Biota 1. Fish 2. Snapping turtles 3. Kacroinvertebrates 4. Microbial populations C. Terrestrial Environment 1. Landfills and dredge spoil areas 2. Air and volatilization 3. Accumulation in plants D. Mass Balance . 1. PCBs in Upper Hudson sediments 2. PCB movement from Upper Hudson toEstuary 3. Summary of PCBs in Hudson River Basin 4. Relation of Hudson River to NorthAmerican PCB use and environmental contamination E. Available Control Technology 1. General 2. Dredging a. Technology b. Environmental effects ISe 1 1 7 9 9 15 19 19 22 22 23 23 25 26 29 31 31 32 38 41 41 43 45 46 48 48 48 /.B 53 MONS 007863 3. Disposal a. Incineration b. Biodegradation c. Engineered encapsulation 1. General description 2. Design criteria a. Site selection b. Lining and leachate prevention c. Long-tens operation III. Management Alternatives A. Overview 1. Maintenance dredging 2. Remnant deposits 3. Contaminant removal a. Hot-spot dredging b. Complete removal of FCBcontaminated sediments B. Cost C. Environmental Impacts 1. General considerations 2. Short-term impacts 3. Long-term impacts D. Economic Impact to Fishery (written by J. D. Sheppard) 1. Economic value of fisheries a. Commercial fisheries b. Recreational fisheries 2. Effect of PCB contamination on fisheries IV. References 56 56 57 59 59 59 59 61 64 65 65 65 67 69 69 69 70 73 73 74 74 79 79 80 80 83 85 MOMS 007864 List of Figures 1. Hudson P.iver Basin. 2. Upper Hudson River Easin. 3. Upper Hudson River Water Surface Profile. 4- Frequency Distribution of Sediment PCB Levels in the Upper Hudson River. 5. Average PCB Concentration in Sediments of Hudson River. 6. PCB Penetration in Corea by Reach From Areas Where PCB >5 ppm. 7. Total PCB in Water Column at Various River Flows. 8. Hudson River at Schuylerville. 9. Lock 7 - Thompson Island Bed Change. 10. PCB Levels from Sediment Cores in the Hudson River Estuary. 11. PCBs in Kultiplate Residues. 12. Evaporative Loss of PCB from PCB Saturated Water Solution. 13. Points of Interest on Upper Hudson River. 14. PCB Concentrations in Ambient Air at Washington County Offices. s 2 j ^ 10 11 14 16 17 20 21 28 33 35 36 15. PCB Concentrations in Ambient Air at Washington County Offices ty Cay of Week. 16. Schematic of Hydraulic Dredging. 17. Relative Biodegradability of 1221 Compounds. 18. laical Landfill Problems Showing Primary Routes of Contaminant Loss. 19. Construction of Typical Engineered Encapsulation Site. 20. Map of Remnant Deposits and Dredging Area for Maintenance Dredging Project of 1977-78. 37 52 38 62 63 68 HUNS 007865 List of Tables 1. Area and average flow of the Hudson River drainage basin. Ear 5 2. The area and average PCB concentration by reach ofhot spots and cold areas in sediments of the Upper Hudson River. 12 3. Frequency tabulations for sediment grabs from the Upper Hudson River by texture and PCB level. 12 4. Log-mpen PCR levels by texture class. 13 5. Calculated PCB load in the Upper Hudson River at selected river discharges. 18 6. Summary of computed Upper Hudson River sediment transport by river reach. 18 7. Sedimentary regimes for the Hudson River estuary region. 22 8. Total PCB levels in edible flesh of resident species from various regions of the Hudson River. 23 9. Aroclor 1254 concentrations in fish flesh of migratory species from the Hudson River estuary. 24 10. Tissue levels of PCBs from snapping turtles collected along the Hudson River estuary. 25 11. Ranges of PCB concentrations in macroinvertebrates from the Hudson River. 27 12. Estimated amount of PCB in and projected loss of PCB from selected dredge spoil areas and landfills in the Upper Hudson Basin. . 31 13. Average PCB concentrations at five stations in the Upper Hudson Basin. 14- Ambient air PCB levels (ng/m^ of Aroclor 1016) at dump and dredge spoil areas. 33 37 15. Average PCB levels associated with plant tissues at dump and dredge disposal sites along the Upper Hudson River. 16. Total PCB concentrations (pg/g dry weight) of plant tissues from trees at the Caputo site. 39 40 17. Depth in sediments of the Upper Hudson River to include various proportions of thetotal PCB mass. 41 MUNS 007866 18. Estimated mass of PCE in sediments of Upper Hudson River. 19. Summary distribution of residual PCBs in the Hudson River Basin. 20. Suggested methods of managing FCB contaminated sediments. 21. Measured PCP losses at the dredge head caused by hydraulic dredging in the-Upper Hudson River near Lock 4. 22. Summary of hydraulic dredging performance at three sites on Upper Hudson River. 23. Performance of dredging project at Fort Fduard Channel during the Summer of 1977. 24. Criteria used to select an adequate site for an engineered encapsulation facility to contain PCBcontaminated dredge spoil. 25. Summary description and evaluation of possible management strategies for the Hudson River. 26. Total ten-year costs of potential management alternatives. 27. Summary of short-term environmental impact of various management alternatives. 28. Summary of long-term environmental impact of various mangement alternatives. 29. Summary of past, present and potential values for the commercial fisheries of the Hudson River. JO. Summary of present and future values of the recreational fisheries of the Hudson. . 42 46 49 53 54 55 60 66 71 73 75 80 80 MQNS 007867 Acknowledgements This study was carried out as part of the efforts of the New York Departcent of Environmental Conservation (DEC) to fulfill obligations of the settlement between General Electric Company and TEC. The following firms and individuals have been most instrumental in providing much of the data and technical interpretation on which this report is based. General Electric Corporate Research and Development P.onald Prooka Paul Griffen Charles McFarland Hydroscience Associates, Inc. John St. John Robert Thomann Lamont-Doherty Geological Laboratories James Simpson Richard Bopp Lawler, Matuaky & Skelly Karim Abood Guy Apicella Joseph Meisler Malcolm Pirnie, Inc. Richard Thomas John Henningson Steven Maslansky Steven Schwartz NT Department of Health Brian Bush James Daly Barbara Dell'Acqua Renato Dell'Acqua N7 Department of Environmental Conservation Jay Bloomfield G. David Knowles William Miner Russell Mt. Pleasant Scott Quinn J. Douglas Sheppard Karl Simpson Ronald Sloan John Spagnoli Fred VanAlstyne NT Department of Transportation John Dugan Paul Mack Joseph Stellato Noraandeau Associates, Inc. Paul Hague U.S. Environmental Protection Agency-Region II Richard Dewling B.S. Geological Survey Roger Archer John Turk Weston Environmental Consultant Walter Leia Frank Benenati HONS 007866 The PCD Settlement Advisory Committee played an important role in helping to design these studies and to review the results. Comments and criticism of this report by its members helped correct inconsistencies and errors, but the findings and conclusions in this report are those of the authors and do not necessarily reflect the views of the study participants or of the PCB Settlement Advisory Committee nor are they the official opinion of DSC. Mention of trade names or commercial products does not constitute endorsement for their use. The authors also express their appreciation to Arlene Lucia, Rose Salvo, Valerie Veisman and Stan Zelka for the typing and drafting. Their patience and careful work made the editorial job much easier. Support for these studies was provided primarily by funds made available from General Flectric through a legal settlement signed September 8, 176. Additional support was provided by DEC, NY Department of Fealth, NY Department of Transportation, U.S. Environmental Protection Agency and r.S. Geological Survey. MGNS 007db9 -1- I. Background A. The Study Prorram On September 8, 1976, the Nev York State Department of Environmental Conservation (DEC) and the General Electric Company (GE) signed an agreement bringing to a close the action brought against General Electric relating to discharges of polychlorinated biphenyls (PCBs) into the Hudson River. As a result of this settlement, DEC instituted a series of major studies of the river system related to PCBs and potential actions for managing the problem of extensive in-place sediment contamination. A history of the problem, the settlement and a description of the study plan has been presented previously^. Preliminary results of the studies were presented in Albany on January 18, 19 and 20, 1978. The purpose of this report is to summarize these results along with other information related to the problem of PCBs and the Hudson River. B. The Hudson River Basin The Hudson River Basin can he divided into three sub-basins: the Upper Hudson River, the Mohawk. River and the Lower Hudson River (Figure l). The areas and water flows for these three basins are presented in Table 1. From Spier Falls to Troy, the Upper Hudson River 1b actually a series of low-level dams, and south of Ft. Edward serves as part of the Champlain Canal (Figures 2 and 3). The Mohawk River serves as the eastern portion of the Erie Canal and joins the Hudson River just above the Federal Dam at Troy. The Lover Hudson Basin is tidal throughout its entire 150 miles (241 km). Average tides are 44 feet (1.4 a) at the Battery, 3.0 feet (1 m) at Beacon and 4.8 feet (1.5 m) at Troy. Tidal flows at Poughkeepsie have been measured as 230*000 to 280,000 cfs (6.5 to 7.9 x 10^ l/sec). Djc studies have shown that the flow actually oscillates with the tide, with a very slow net outflow. MGNS 007870 -275" 74' 73' MONi 007871 -3MGNS 00 781Z /\ Ci90U0A abcvt mtOf) .>*0 l l/ f f t * 0 [-Buoy I ( J u n d tc n o f E r i* tt CMJrnplom C o n o il) 140* Ito- IOC 00 60 40 20 u a* i3 W ~i 0 195 9 i Co C o oo **J Ui Flgura 3 UPPER HUDSON RIVER WATER SURFACE PROFILE Fort Edword to Federol Lock MrcM4,l977 2. Mot* r*T +*~/r> U S G S Ofltvm Dam not la acal* ISO * Falt-vater intrusion extends quite a distance upriver. The *>C rng/1 (0.C5 o/oo) salinity fluctuates from 20 mi, .2 km) above the Fattery (near Tappan Zee Fridge) to 70 mi. (112.7 km) inland (south of Poughkeepsie) depending on the freshwater flow. - Table 1: Areas and average flow of the three sub-basins in the Hudson River Pasln. Location m.i2 Area km Upper Hudson Basin Vaterford 4,620 11,966 Mohawk River Basin Cohoes 3,456 8,51 Lower Hudson Basin Tributaries 5,300 11,727 Total Hudson Basin 13,376 34,644 Source: Data from U.S. Geological Survey^46), Average Flow - cfs 2/sec x Ifj 7,660 5,630 ",100 20,390 2.17 1.5 2.01 5.77 MQNS 0G7S74 -7- C. Historical Perspective Although elevated levels of TCP were first discovered in Hudson River biota late in 1969, their importance was not recognized for several years. Py 1975 sampling of the river 'clearly implicated Ceneral Flectric's capacitor manufacturing facilities at Ft. Edvard and Hudson Falls as the major source of PCBa in the Upper Hudson River. On December IB, 172, General Flectric had applied to FPA for a discharge permit, stating that its two plants were dis charging an average of 30 pounds per day of "chlorinated hydrocarbons" with a (2B1 maximum of 47.6 pounds per day. ' The permit became effective January 31, 1975. PCP usage by General Flectric has been both extensive and long standing. Between 1966 and 1974, these facilities purchased 7B million pounds of PCP, or roughly 9 million pounds each year/r 281 These purchases represent approximately 15 percent of U.S. domestic sales during that time. Although records do not exist for years prior to 1Q66, PCps have been used at Hudson Falls and Ft. Edward for more than 25 years. General Flectric began capacitor production at Ft. Edward in 1Q47 and at Hudson ^alls in 152. PCPc have always been the primary capacitor dielectric used. As part of the 1976 agreement, General Flectric constructed a treatment plant for all their wastewater and ceased using PCP. Although PCP discharges in the early 1970s averaged about 30 pounds (15 kg) per day K13,000 lbs/year), by 176 they were reduced to less than 250 grams/day (9 oz/day), and since May 1977 have been leBS than 1 gram/day. Until late summer of 1973, the PCB discharged was into a river pool maintained by the Ft. Edward Para. Py October 173 this dam was removed. The sedimentary regime of that portion of the river was changed and massive volume* of contaminated sediment that had collected behind the dam (remnant deposits) MGNS 007075 -8were resuspended and transported downstream. (43) In April 176 a 100-year flood in that region of the Hudson eroded more of these remnant deposits. These deposits are still unstable and continue to erode and move downstream. HONS 007876 -9- II. Summary of Current Findings A. Data on River Sediments and Hydrology Since 17A, wore than 1,300 bee* sediment samples have been taken (2-7) from the Hudson River and analyzed for PCBa. ' In the Upper Hudson, DEC staff collected about 200 grab and core samples from 1974-77 following the analysis of a few grab samples collected by EPA in 1973.^'^ In 1977, approximately 900 grab and core samples were taken in the Upper Hudson by Normandeau Associates and analyzed by O'Brien and Gere Engineers.^ Sediment cores were taken in the estuary by the EPA, Region 11^ and lamont-Doberty Geological Laboratories during 1977.(' 7)' Sample density was greatest In the section of the river just below Fort Edward where the PCB concentrations were found to be highest (Figure 5) 1. Upper River a. Sediments PCB concentrations in Upper Hudson River sediments appear to be log normally distributed (Figure 4). Given such a distribution, a log mean is the appropriate measure of central tendency because an arithmetic mean gives misleading high values. Figure 5 shows the log mean and variation of the measured PCB concentrations by river reach. To provide additional insight into the measured concentrations, arena of high PCB concentrations (>50 ppm ) were determined and the data stratified into two sets for each river reach; one of the measured values in high-concentration areas (hot spots), and one of measured values in lowconcentration areas (cold areas). An analysis of data in each of these subsets indicated that PCB concentration tends to be more normally distributed than the entire data group. The areas and arithmetic means of PCB concentration of each of these subsets are given in Table 2. MONS 007877 NUMBER OF SAMPLES Figure 4 FREQUENCY DISTRIBUTION OF SEDIMENT PCB LEVELS IN THE UPPER HUDSON RIVER x c r is> OD Ct PCB CONCENTRATION (ppm) 1C- Figure 5 AVERAGE PCS CONCENTRATION IN SEDIMENTS REACH btQ LO O SNOW Fodorot Dam Troy -12- Table 2: The Area and Average FOB Concentration by Reach of Fot Spots (concentration *50 ppm) and Cold Areas (concentration **0 ppm) in Sediments of the Opper Hudson River. Total 8 7 6 *5 43 ? 1 PCB Levels** Hot spots Cold areas Overall Area (x lO^ft^ ) Hot spots Cold areas Total -- 67.6 10. e6 120.78 131.65 151 1?.0 86.2 103 163 20.0 20.0 43.6 74.6 70 13.0 11.6 108 1 50 13-4 22.6 41.9 52.3 13.0 13.1 4. 27 0.6 2.5 1.^5 1.5 0.15 0 10.73 7.4 5.91 41.2 o.7 10.85 15 15.00 8.0 8.5 42.Q5 11 .2 11.0 15 * Reaches are identified in Figure 3* Average concentrations for sediment grab samples in ppm. 9.6 9.67 0 20 20 Table 3: Frequency Tabulations for Sediment Grabs from the Upper Hudson River by Texture and TCP Level. 0 Clay 1 Silt ? Muck Texture 3 Kuck and vood chins 8 Gravel Reaches 6 - 9 No. of samples t of PCB levels < 5 ppm 1. of PCB levels <25 ppm * of PCE levels >50 ppm 3 52 49 ICO 7.7 20 100 25.0 26.5 0 55.8 53.1 ii 0 0.1 54.5 61 14.8 78.7 4.o Reaches 1-5 No. of samples t of PCB levels < 5 ppm * of PCR levels <25 ppm % of PCB levels >50 ppm 03 1 -0 15.8 - 33-3 52.6 "0 31.6 10 0 30 40 22 4l'.5 oo.o n o Gravel and wood chins 20 10 45.0 40 5 20 PO 20 MOMS 007880 -13- It can be noted from Table 3 that sediment samples consisting primarily of muck and wood chips had PC? levels typically >50 ppm and seldom <25 ppm. Camples consisting of primarily gravel were typically low in PC?, but the PCP level was greater if wood chips were present in the gravel. North of Lock 5 (reaches 6-9), coarse sands with wood chips had significantly higher PCB levels than without wood chips (Table 4). This suggests an association of high PCP levels with sediments having an elevated organic content. Additionally, fine-textured sediments have significantly higher (P <.0C5) PCP concentrations than coarse-textured ones (Table 4). This observation is supported by a negative correlation of PCB level with total solids (r = -.68) in samples from the northern reaches, thus Indicating that a light organic sediment is often high in PCB. Table 4: Log-mean PCB Levels by Texture Class. 0-3 Texture code* 6 7R 9 Reaches 6-9 Log-mean PCB Antilog (ppm) 1.75 56.7 1.05 11.1 1.29 1Q.3 1.08 'll .9 1.52 34-0 Reaches 1-5 Log-mean PCB Antilog (ppm) 1.41 25.6 -- -- -- 0.70 0.85 -- 5.0 7.0 * A description of the texture code can be found in Table 3 except 6 = sand and 7 = sand and wood chips. hONS 007801 From studying the riverbed, cross-section maps and sediment characteristics, it can be observed that silt deposits are typically near the banks in the lower velocity areas and gravel deposits are generally in the center or navigation section of the channel. The hot-spot areas occurred more frequently near the banks, except for the northernmost river reaches. Figure 6 PCB PENETRATION IN CORES BY REACH FROM AREAS WHERE PCB > 5 ppm Reaches 8,9 frequency of Mean Reaches 6,7 frequency of Meon Reaches 1-5 frequency of Meon .39 93 87 .40 102 47 .08 22 48 .58 112 57 .57 153 23 .20 47 25 .36 120 103 .29 130 51 .29 49 62 i DEPTH IN CORE (inches) .33 133 63 .18 48 22 .05 , 14 22 .25 24 75 27 0 6.3 II 0 3 O z .22 36 69 9 0 3.0 1 0 0 4.7 7 -15- From the cores, it can he seen that typically the highest PCB con centration in the sediment is 6 to 12 inches below the surface (Fig. 6). Substantially contaminated material is, however, found deeper in the sediments, particularly in the upper reaches (Fig. 6). b. Water column During the 1977 water year, the U.S. Geological Survey operated PCB monitoring and daily suspended-sediment stations at Glens Falls, Schuylerville, Stillwater and Waterford, New York.^ The Waterford station was operated for the entire year, whereas the other three stations began operation in late March, 1977. Although no PCBs (<0.1 ppb ) were detected in any water samples from the Glens Falls station, PCBs were commonly detected at the other three sites. PCB concentration varied substantially both with flow and river reach (Fig. 7). Throughout the year (late March to September) highest PCB concentrations (>1 ppb) were associated with high flows (approximately 10^ l/sec), and the lowest PCB concentrations were associated with medium river discharges of 2 to 6 x 10^ l/sec (Fig. 8). With even lower flows (<1l/sec or "'3500 cfs), PCB concentrations at Stillwater, Schuylerville, and Waterford Increase, thus indicating that a relatively constant load of PCBs was being transported except during storm events. This constant lowflow load in the Dpper Hudson River was between 4 and 5 kg/day (Table 5). During tho major storm at the end of April, daily transport of PCB ranged from 360-390 kg (Table 5). The transport of PCBs at Waterford during the entire year was approximately 2,600 kg (5,720 pounds), half of which occurred at flows less than and greater than 5.6 x lO"1 l/sec ('20,000 cfs). HONS 007883 PCB (y g /l) Figure 7 TOTAL PCB IN WATER COLUMN AT VARIOUS RIVER FLOWS March 14,1977 Qtroy = 160,000 cfs " ___________1___________ I___________ 1___________ 1__________ 200 190 180 170 160 150 2 March 15, 1977 Qlroy = l33.00 e, 1 . ----------------1---------------- 1___________ 1___________ 1__________ 200 190 180 170 160 150 , PCB ( jig / I ) MILEPOINT HONS 0078a1* MILEPOINT (27) SOURCE after Hydrosciinct, liSGS data PCB CONCENTRATION (p g /l) -17Figure 8 HUDSON RIVER AT SCHUYLERVILLE PCB CONCENTRATION VS. RIVER DISCHARGE MARCH 30-SEPTEMBER 27, 1977 . ____ 5.5 x io4 regression PCB =-------- q-------for Q < 5.6 x)05 L/sec (SI SOURCE- Turk, USGS dole HONS 007885 Table 5: Calculated PCB Load in the Upper Hudson River at Selected River Discharges. Flow PCB Load in kg/day and (lbs/day) Schuylerville . Stillwater Waterford <5.6 x 10"' l/sec. April 24rMay 2, 1977 10 1/sec.) Source: data from Turk(8). 4.0 (8.8) 370 (814) 5.2 (11.4) 360 (792) 3.8 (8.36) 390 (858) Table 6: Summary of Computed Upper Hudson River Sediment Transport by River Reach. Mile Point Median Daily Location Flow (cfs) 90* Flow* (cfs) Threshold flow for Scour(cfs) Sediment Transport (tons/day) 50* 90** 99?* 193.7 188.5 186.2 182.3 168.7 166.0 163.5 159.5 153.9 Lock 7 4000 Thompson Is. Dam Lock 6 Lock 5 Lock 4 Lock 3 Lock 2 Lock 1 Federal Dam 8500 9500 -- 10500 -- 12500 -- 15000 -- 27500 15000 40 120 525 >25000** 13 75 580 >25000** 10 50 520 7 30 520 >27000** 30 80 600 15000 100 600 2000 8000 25000 60 880 3800 10000 35 900 2800 500 6500 8000 Source: compiled from results of Lawler, Matusky & Skclly s<sdiaent-transport model' x? flow means the average daily flow is not exceeded r? of the time. Flow necessary for scour was not found, maximum flow tested is indicated. HONS 007886 -19- c. Sediment transport Table 6 provides model estimates of sediment transported and (9) scour by river reach . This analysis indicated that the reaches most likely to scour are the reaches from.Lock 3 to 2 and from Lock 1 to the Troy Dam. Figure 9 provides 20 yr. bed change predictions for the Thompson Island to Lock 7 reach. Except for the northernmost 2 miles, less than a foot of deposition is expected to occur in the next 20 years and, thus, does not appear enough to seal the sediment and prevent further PCB leaching *nd transport during the 20 years. Only limited scour occurs in this reach. 2. Lover River (Estuary) a. Sediments (7) Richard Bopp has suggested that the Hudson estuary can be divided into three distinct sedimentary regimes. The amounts of recent sedimentation (since the early 1950s) and the proportion of the river in each of these regimes are presented in Table 7. PCB contamination is con fined to these recent sediments. Typical cores from these areas are shown in Figure 10. Estuary PCB concentrations in recent fine-grained sediments decrease from an average of 60 ppm in the Albany Turning Basin to an average of 6 ppm in the New fork Harbor. The measurements indicate no other major historic or existing point source of PCBs to the Estuary other than the Upper River. In the core taken in the Albany Turning Pasin, changes of Aroclor 1016, 1242 and 1254 through the core are consistent vith changes in the Aroclor usages at GE's Ft. Edvard and Hudson Falls manufacturing facilities. HONS 007667 Figure 9 LOCK 7 - THOMPSON ISLAND BED CHANGE 20 YEAR PROJECTIONS z u. o Ui oz < X o o u GO cc o o 194 193 192 191 190 169 RIVER MILE INDEX 168 SOURCE- Lawler, Moiu&ky & Skelt/O) -21- Figure 10 PCB LEVELS FROM SEDIMENT CORES IN THE HUDSON RIVER ESTUARY ALBANY TURNING BASIN PIERMONT MARSH Depth PCB NEW YORK CITY HARBOf Depth (cm) PCB (PP-tn) 4.2 10 6.0 20 7.9 5.6 30 6.9 1971 5.0 40 6.0 nd'not detected Dates determined by l37C$ profile er.capt for Albany, where GE's purchase records for Aroclor 1016 and 1242 were used 50 60 70 80 4.6 9.6 nd nd nd nd SOURCE: data from Oopp^ MQNS 007889 -22- Table 7: Sedimentary Regimes for the Pudson River Estuary Region. Estuarine sedimentary regime Depth of recent Sediment Accumulation (cm) Proportion of river bed (%) Natural channel & submerged bank ' Coves and broad shallow areas New York Harbor area Source: data from Boppl?). <5 15-30 up to 250 65 25 10 The highest concentration (130 ppm at 20-30 cm) can be associated with (7) the removal of the Ft. Edward Dam in 1973* This suggests that GE dis charges have been contaminating the Estuary probably since the facilities have used PCBs (1950), and massive short-term contamination occurred with the removal of the Ft. Edward Dam and the subsequent 100-year flood (1974). b. Water column Only limited data exist on PCB concentrations in the estuary water column and are from the Poughkeepsie and Troy area. Values of between 0.11 and 1.1 ppb have been measured^*^^. c. Sediment transport There is very limited data on estuary sediment transport. A thin organic fluff layer lies on top of the sediment and moves up and down the river with tidal flow. The center of the channel is typically sandy and subject to higher velocities while the coves and broad shallow areas are depositional. With the paucity of hydrologic data and PCB concentration in the sediment, PCB transport down the estuary cannot be quantified. MOMS 007890 -23- IX. B. River Biota 1. Fish Fish sampling from various reaches of the Hudson River and subsequent analysis of PCB levels in-fish flesh has been directed at determining whether given species of fish could be considered safe for human consumption and whether fish flesh FCB concentrations are affected by PCB discharge reductions or other remedial management actions^f10 1 1 . Earlier analyses^^(1975-76) indicated that PCB levels were higher in fish taken above Troy than in fish from the estuary (Table 2). All species sampled in 1975-76 had average total PCB concentrations exceeding 5 ppm (the FDA's temporary tolerance limit for PCBs in fish). Upstream of Hudson Falls fish contain only trace amounts of PCB. Table 8: Total PCB levels in edible flesh of resident species from,..,,, various regions of the Hudson River. Data from 1975-1976 12 Location Species Above Hudaon Falls Smallmouth bass Tellow Perch Fort Edward to Troy Look Federal Dam to Battery Smallmouth bass Tellow Perch White Sucker Largecouth bass Tellow Perch Lurgemouth bass White Perch Source:. Sloan(12). * yg PCB/g wet weight. Number of fish Total PCB (Don)* Average Range 26 Trace 15 Trace 11 72.6 10 134.6 37 68.2 37 61.7 5 5.28 10 10.05 23 10.08 41.5-122.9 79.3-299.3 28.2-131.4 12.5-164.4 _ 1.73-23.74 5.28-19.88 MOMS 007891 -24- Table 9: Average total FCP levels in edible flesh of fish taken from the Hudson River. Data from 1077. Location Species Number of fish Total PCB (ppn)t Average Range Thompson Island Stillwater Albany/Troy Largemouth bass3 Goldfish3 Largemouth bass14 Largemouth bass3 Yellow perch4 Goldfish4 White sucker3 Brown bullhead5 Sirallmouth bass1* Largemouth bass1* Yellow perch4 White perch5 White sucker1 Brown bullhead4! 5 Striped bass1 19 19 14 20 30 16 17 30 9 2 20 30 10 30 10 73.4 56e 70.7 68.1 12.2 576 21.0 110 16.4 18.3 9.3 118 15.8 37.9 21.2 58.3-86.9* 296-872" 6.22-235 49.4-86.8* 1.57-42.7 41.8-1836 16.1-25.1* 35.5-242 0.98-50.36 1.45-35.2 1.49-27.3 6.19-372 3.15-110 #* Catskill Indian Point Poughkeepsie Tappan Zee Largemouth bass4 Largemouth bass1 Yellow perch5 Brown bullhead5 White catfish5 Alevife1 Atlantic tomcod4 American eel4 American shad3 American shad2 American shad3 American shad2 Striped bass3 27 10 20 8 1 20 30 7 2 32 19 20 5 29.5 4.62 4.25 2.04 21 .9 1.95 0.96 151 10.02 6.07 4.55 3.20 8.00 <0.44-85.7 <0.75-10.6 <0.30-10.03 1.88-2.21* <0.44-4.48 6.54-263 t* 2.21-11 .9 3.62-5.22* 1.65-5.85 tf * (LI) Source; Bureau of Environmental Protection'* ' *Report 12, March 20, 1978. 2Volume 2, Report 1, April 20, 1978. 3Ibid., Report 2, May 20, 1978. "Ibid., Report 3, June 20, 1978. 5Ibld., Report 4, July 20, 1978. * Tvo analyses on composited fi3h. **0ne analysis of pooled fish, t pg PCB/g vet weight. HONS 007892 Although PCB analysis of fish collected in 1977 is incomplete, the data presently available demonstrate that fish populations between Ft. Fdunrd and -25- Troy are more contaminated than those further downstream (Table 9). Even in this river reach, however, some species are much more contaminated than others. Several interesting patterns in the data bear additional investigation. Sampling throughout New York State from 1970-75 demonstrates that PCB contamination of fish' flesh is highest in the Hudson River, but detectable levels of PCBs are present in fish from virtually any river system or large lake. Fish from non-industrialized or lightly industrialized watersheds in New York (Chemung, Susquehanna, Raquette) average less than 1 ppm in their edible flesh; although in the Black River, levels approach 4 ppm. In more heavily industrialized basins (Genesee, Hoosic, Great Lakes), however, PCB levels in fish approach and often exceed 5 ppm. 2. Snapping turtles Approximately 20 snapping turtles from the Hudson have been analyzed for PCBs^^. Most of the turtles were collected in June 1977 but a few were collected in June 1976 and May 1977. The animals were collected from eight coves or marshes along the estuary from the Tappan Zee Bridge area to Hudson. Table 10 shows the average and range of PCB concentrations in all the animals. The limited sampling makes any interpretation of the data Impossible at this time. Table 10: Tissue levels of PCBs from snapping turtles collected along the Hudson River estuary. Tissue Number of Samples5 Muscle Liver Eggs Fat Source: Stone (13) . 17 17 3 1 Total TCP concentration (mm) Average Range 4.24 36.7 23.5 712 0.05-27.62 1.79-174 15.7-42.9 MUNS 007893 3. Kacroinvertebrates In 1976 multiple-plate samplers were tested as a method for monitoring PCPs in the water column of the Hudson River Samples were obtained by exposing hardboarct artificial.substrates for periods of four to five weeks. Organisms and other material which attached to the plates were removed and extracted for PCB analysis which was done by the NTS Department of Health. Two stations (controls) were located upstream from the known point discharges of PCBs; one in the Hudson Hiver and one in the Champlain Canal. The remaining stations were all below the discharges. Five of the stations were located in the tidal zone of the Hudson Estuary. Because the results from 1976 were promising, the project was continued in 1977. Three stations were added, extending the sampling network into Paverstraw Bay, and the Champlain Canal station was dropped. In the Hudson River samples, macroinvertebrates comprise approximately half of the material attached to the sampling plates; the other half being detritus and attached phytoplankton. Most of the macroinvertebrates (60-70^) are midge larvae (Chironomidae) with the next most abundant organism being oligochaete worms (15-20^)^^. During all sampling periods for which data are available, consistently higher PCB concentrations have been found in organisms from the Upper Hudson below Ft. Edvard than elsewhere in the river (Table 11). PCB levels in fish and sediments are also highest in this region. Contamination of macroinvertebrates in the Hudson Estuary, while lees severe, was well above background levels. In June, July and August 1976, all stations yielded PCPs in excess of six times background levels (Table 11). HONS 007094 -27- Table 11: Ranges of PC3 concentrations in macroinvertebratea from the Hudson River. Values are expressed as ppm PCB/dry weight of total residue on the sampler plates. Date Background (control stations) June 1976 0.4 July 1976 0.3-0.6 August 1976 0.2-0.5 September 1976 0.2-1.0 August 1977 Source: Simpson (15). 0.1 Fort Edward to Troy 5.6 - 25.4 12.0 - 57.0 No data 9.0 - 18.8 2.8 - 10.8 Lower Hudson (Fstuary) 2.6 - 4.9 5.0 - 11.0 2.8 - 200.0 0.0 - 11.0 0.8 - 3-4 Clayton et al.^^ have shown that lipid content ia highly correlated with the PCB levels in marine invertebrates, and they contend that lipid content is the most-meaningful normalization parameter for quantification of PCB results. Lipid contents of samples were determined beginning in September 1976. Normalization of the data to lipid content also demonstrates that the greatest PCB contamination is occurring in the Upper Hudson below Ft. Edward. In September 1976 and August 1977, PCB concentrations can be seen to progressively increase from the control station to Schuylerville, decrease slightly at Stillwater, then peak at Waterford and gradually diminish downstream (Figure 11). MONS GG7B95 An interesting temporal change can also be noted. In September 1977, at all the estuary stations with the exception of Troy, PCP concentra tions in mncroinvertcbratcc were higher than during September 1976 or August 1977. This suggests that PCBs are becoming more widely and evenly distrib uted in the Iludson Fiver. Data from future surveys will help evaluate the sirnificranco of this trend. IBr- X o T Co o o toJ c a PCB C o n c e n tra tio n m q /q l i p i d )( SOURCE; Simpson117* PCB oriQiyses by NYS Depf. of Heoitn -20- Kacroinvertebratas from the Ft. Fdvard area had considerably elevated PCP concentrations in September 1977, but not in August 1977 or the previous year. Dredging north and east of Rogers Island began in early August. Transport of PCBa from this activity undoubtedly accounts for the September increase of PCRs in the macroinvertebrates. The sampling station at Route 197 (Ft. Edward) is located approximately 100 meters downstream of the dredging activity. For more details see Section II.F. and Figure 20. 4. Microbial populations In late November of 1977, at the request of the Department of Environmental Conservation, General Electric initiated work to determine if PCB degrading microorganisms are present in Hudson River sediment. (18) The approach to this question centers around the development and analysis of catabolic activity of enrichment cultures obtained from core sediment samples from a heavily con taminated region (1000 ppm total PCP) of the Upper Pudeon. Enrichment cultures have been obtained from sediment core samples taken in this heavily contaminated region. The microbial population found in the first 20 cm of core sediments ranged from 10^ to 10^ microorganisms per 10 g of wet sediment. Mixed cultures grown on 2* glucose as the primary carbon source were unable to degrade Aroclor 1221, 1016, or 1254 in shake-flask studies. Colonies were observed, however, on agar plates containing Aroclors 1221 and 1254 and shake-flask studies using these organisms (mixed culture) (10) have shown them to be capable of degrading PC^s. Further studies are in progress. ' MUNS 007897 -31- C. Terrestrial Environment 1. Landfills and dredge spoil areas Studies have been carried out to ascertain the amount of PCB presently in landfills-and dredge spoil sites in the Upper Hudson Easin and to estimate the erosion and leaching of PCBs from these sites Table 12 presents the results to date. Substantial quantities of PCB exist in Table 12: Estimated amount of PCB in and projected loss of PCB from eelected dredge spoil areas and landfills in the Upper Hudson Basin. See text for important reservations about these values. Si+# Estimated PCB in site (thousands of lbs) Groundwater loss (lbs/yr) Erosion loss (lbs/yr) Dredge Bpoil sites Lock 1 Lock 4 Site 212 Site 518 S.A. 13 Moreau New Moreau** Rogers Islandt Total Landfills St dumps Fort Miller Caputo Old Ft. Edvard Kingsbury Ft. Eduard Total 0.95 3.85 3.46 1.49 80.7 45.4 6.8 17.4 160 119 1.13 7 292 116 >528 0.17 22.6 11.3 _3 4.9 i 10 J 51.2 12.4 V 7 . 98 2 x 10"4 0.343 422 7 >422 Source: modified from Veston(20) preliminary data. * Locations depicted in Figure 13. Estimated by Horn from NTS DEC data, t Estimated by Tofflcmire from NTS DOT dredging records. 7 Insufficient data. 0.015 20.8 24.2 17.3 4-5 4.2 7 7 71 371 , 2.6 x 10 J 0.073 5.8 3.2 380 i MQNS 007698 both types of disposal area, but the landfills and dumps contain over 75* of the PCP that was placed on land sites. Measurable quantities of PCB are also leaching or eroding from these altaa. Again the landfills and dumps appear to be larger contributors of PCB to the surrounding environment that the dredge-spoil areas. One must he very cautious in interpreting this information, however, because the groundwater loss estimates do not yet incorporate local soil adsorption properties. The groundwater values are therefore quite possibly considerable overestimates of PCB transport away from the immediate vicinity of the sites. Contaminated groundwater is not presently being used for drinking water at any of these sites. Additionally, the erosional losses from all sites should be considered "worst-case" estimates and also may not transport PCP very far from the site. Very little of the eroded material from the Fort Miller dump, for example, probably reaches the Moses Fill or the Hudson River. On the other hand, because the dredge-spoil sites are immediately adjacent to the Hudson Fiver, most of the eroded material from these sites probably does reach the river. 2. Air and volatilization During the early phases of General Flectric's research, the rate of PCP evaporative loss from pure samples and aqueous solutions was evaluated. The effect of organic particulate matter on the TCP evaporative loss was also studied. It was found that neat Aroclor 1221 volatilizes at a rate of approximately F pg/day/cir^ at 25C.^^ Monochlorinated homologs are loot from Aroclor 1221 almost twice as rapidly as the dichlorinated homologs. PCPa also evaoornted rapidly from saturated water solution (Figure 12), but organic particulate matter strongly adsorbs TCPs and retards the rate of MONS 007099 Figure 12 EVAPORATIVE LOSS OF PCB FROM PCS SATURATED WATER SOLUTION SOURCE Gtnttal Eltciric Table 13 * Average PCB concentration at five stations in the Hrper Hudson Pasin. Dates Washington County Offices Fort Hudson Main Glens Nursing Home Street Falls Varrensturg 11/76-6/77 7/77-11/77 990 (31) 305 (15) 108 (23) 25 (10) 102(24) <20(32) 67(12) <20( 9) <20 (25) <20 ( 7) S,, ource: R_ omano (21) . Each sample represents 24 hours of air filtration through a florisil column. Every day of the week is approximately equally represented at each station. Number in parenthesis is number of samples. Concentration in nanograms/cubic meter of air. HONS 007900 evaporation from water. Thus, these observed rates are not applicable to the Hudson River. Since November 1?76 DEC has continuously monitored air for PCBs at five sites (Figure 13) with sample analysis carried out by the UTS Department of Health. (21) PCBs were not detected at the two sites (Clens Falls and Warrensburgh) greater than three miles northwest of the GF Hudson Falls and Fort Edward facilities. Results from the other sites suggest that PCPs are emitted from both GF facilities. After GE ceased using PCBs at their facilities in June 177, air emissions decreased substantially (Figure 14) and average ambient air lovels have been significantly reduced since July (Table 13). Figure 15 shows the variation in PCB levels with day of the week in ambient air near the Fort Edward facility. The pattern is consistent with work at that plant. Note that significant decreases in ambient air PCBo since July 1977 only exist during the work week. The roughly 300 ng/m^ still found near the plant must reflect contamination of the manufacturing plant and/or grounds. As might be expected, these levels are considerably higher than have been previously found (22) . Over Providence, Rhode Island, the maximal con- -y centration reported was 9.4 ng/nr j and in the Western North Atlantic over the Grand Banks, levels were usually 100 times less than that. Dustfall vas also sampled in large (4 liter) jars from February to July 1977 at Glens Falls, Warrensburg and the Washington County Office Building adjacent to the Fort Fdward manufacturing facility. Through June, the average PCB load from the atmosphere in dustfall at the Washington County Offico Building was approximately 58 Mg PCB/m^/30 days (687 ug PCB/m^yr) with an average concentration of PCB on the dust of 17 ppm. MCNS 007901 -35- + Figure 14 PCB CONCENTRATIONS IN AMBIENT AIR AT WASHINGTON COUNTY OFFICES -ainpll ccJUcllan fer NTS. DEC PCS OAglytit fey NTS DOH HONS 0 0 7 9 0 3 -V- Figure IS PCD CONCENTRATIONS IN AMBIENT AIR AT WASHINGTON COUNTY OFFICES BY OAY OF WEEK -re**** c*tatt*iW*rt*tnprij Hore 3 Table Us Ambient air PCP levels (ng/cv of Aroclor 1016) at dump and dredge spoil areas. Caputo* Tort Killer* vev Moreau** joro 5^00+ 4100+ 1000+ 2200 4400 1160 30 l6n 50 110 Average: 3240 2160 107 Source: Rorano (2` 1) ; FCP analysis by N.Y. nepartnent of Health, t These are 2.5 hr. air samples from one day. All others are 8 hr. samples. * Dump area. Tredge spoil area. MQNS 007904 -38- It should be noted that dustfall jars do not quantitatively trap PCEs. They represent a rough field estimate which tends to give low results because during the 30-day sampling period PCF-contaminated particles in the Jar can be resuspended and lost, and PCPs are also_ volatized. The latter is clearly evident in the chromatograms of dust-bom PCPs which are enriched with the less volatile components. These levels are not unprecedented (22) . Airborne particulates in four US cities were found to have from 27 to 230 pg PCB/g of particulates, 2 and a continent-wide mean rate of fallout of 60 to 100 ug PCB/m /yr was estimated. Measurements across southern Sweden indicate a range of 7 to 2 126 ug PCB/m /yr. But dry fallout near a DDT manufacturing plant in the 2 Los Angeles area was measured to be 600 ug PCB/m /yr. The Ft. Edward levels are comparable to this, but, understandably, above the national average. In November 1977, air samples were taken at two dump sites (Caputo and Fort Miller) and the Moreau dredge-spoil site. The results are depicted in Table 14 and show that PCBs are clearly being emitted from the landfill sites. Dredge spoil appears to be a much weaker source of PCEs to the atmosphere than the landfills or the manufacturing facilities, but do constitute a definite source at least when recently dredged. 3. Accumulation in plants Plant samples were gathered at these same landfill and dredge disposal sites (23) . Two dozen plant species were sampled with a large number being common to all sites. Control tissues were collected no closer than several miles west of the Moreau site. Concentrations of FCB in or on plant tissues from these collections varied widely from as high as 2770 ppm (dry weight) to less than detection (Table 15). MONS 007905 Table 15: Average PCB levels associated vith plant tissues at dump end dredge disposal sites along the Upper Hudson River. Con centrations are based on dry weight. Site Average PCB (ppm) " Number of samples species Range Caputo Fort Miller on dump below dump hill opposite Moreau Control 502 14.6 15.1 6.0 0.58 0.23 12 9 7 9 19 22 PCB analyses by WARF Institute, Kadison, Wisconsin. 9 2770-28.3 6 434-11.6 6 23.4-5.13 7 14.4-1.32 10 1.34-0.25 15 1.68-<P.2 The extremely high levels of PCBs associated vith the plant tissue suggest that surface adsorption of contaminated dust is Involved rather than transport of PCBs from the soil. Additionally, supporting this hypothesis is the fact that plants closest to the soil (goldenrod, aster, grasses) have the highest PCB levels at each site; staghorn sumac, the next highest, is very pubescent and somewhat sticky, making it a better dust trap than other plants. Finally, looking at the data from trees at the Caputo site (Table 16), one can note several observations consistent with surface adsorption of volatized PCBs. The lower tissues and the tissues with the greatest surface to volume ratio (leaves) have the highest concentrations of PCPs. MONS 007906 -40- Although root-to-shoot transport night be implicated by the presence of PCBs in xylem wood (cores), three other possibilities exist. PCBs may hare diffused through the bark and be associated with the outer surface of the xylem or cambium, transport may be occurring from the leaves to the stem and roots, or possibly, inattention to contamination from handling or coring through contaminated bark could be responsible. Table 16: Total PCB concentrations (ug/g dry weight) of plant tissues from trees at the Caputo site. Species Lower leaves* Upper leaves** Lower twigs* Upper twigs** Corest Pitch pine White pine Quaking aspen 317 215 89.6 81.2 -- 28 87.1 120 -- 17.7 -- -- 1.2 1.16 -- Source: data from Benenati(23)t * Lover tissues were taken from ground level to 2. m above the ground. **0pper leaves and twigs were sampled from approximately 5 m above the ground, t Cores were taken in the trunk of trees between 1 and 1.5m from the ground and the bark plug discarded. Even if PCBs are not transported by the plants and merely attached to the surface of the leaves and twigs, any animal which consumes these tissues will also consume the PCBs. Effects on the plant itself appear to be minimal. Wo gross abnormalities nor obvious signs of chlorosis were noted among the contaminated plants which could be definitely associated with high PCB doses. MCNS 0Q790J -41- D. Mass Balance 1. PCBs in Upper Hudson sediments As explained in Section A, the Upper Hudson River sediments can be divided into two areas, hot spots (areas of PCB concentration >50 ppm) and cold areas (PCB concentrations <50 ppm). Table 2 provides the average PCB concentration of surface samples taken in each of these areas for each river reach or pool. From Figure 6, however, one can see that much of the mass of PCBs is not in the surface samples, but often buried. Table 17 is constructed from the concentrations shown in Figure 6 and shows the depth to which one must go to account for various proportions of the PCB mass. Table 17: Depth in sediments of the Upper Hudson River to include various proportions of the total PCB mass. Percent total PCB mass 50 90 95 99 Depth in sediment(inches) Reach 8,9 Reach 6,7 Reach 1-5 15 7.4 31 16 34 18 36 30 8.4 18 25 34 The total mass of PCB in the hot areas and the cold areas has been estimated^426)^ estimates are within 255? of each other and, considering the difficulty in estimating the depth of PCB contamination in sediments not cored and the necessary Judgement in defining the extent of hot spot coverage, the agreement is quite acceptable. Tabic 18 6UTr.raarir.es these mass estimates by reach. MGNS 00790b Table 18: Estimated mass of PCB in riverbed sediments of Tpper Hudson c.iver. Reach Total PCB mass (thousands of lbs) Hot spot Cold area Scourable* 9 3 ' 3 8 118 e 20 7 16 6 10 6 49 41 8 5 45 ii 34 4 20 12 8 3 18 2' 16 2 14 0 14 1 13 0 13 2 47 4 Q Q 7 11 3 6 All 296 170 126 98 Source: Tofflemire and Quinn(26}. * Estimated from relative scour velocities determined from sediment transport model(9), *#The average concentration for this reach is 20 ppm, but sampling is inadequate to define hot areas and cold areas. It should probably be considered a cold area. Approximately 57? of the PCB mass in river sediments between Ft. Edvard and Troy is located in hot spots which represent only 8f. of the riverbed area. No hot spots have been found in the lover two reaches (below Lock 2), but fever samples were taken there and small areas could have been missed. Betueen the Old Ft. Edvard Dam site and Bakers Falls (Figure 2D) lie five extensive areas where sediment accumulated when the dam was in place. These deposits (remnant deposits) have been eroding rapidly since 1?7% when the dam was removed,except where stabilization efforts were completed in 1975. (oO Approximately 140,000 lbs. of PCB contaminate these deposits. J MQNS 007909 -43- 2. PCB movement from the Upper Hudson to the Estuary Conceptually PCEs can move from riverbed sediments primarily by two mechanisms: leaching (or desorption) from the sediments into the flowing water and/or erosion of the'contaminated bed material. Although these are basically physical phenomena, they may be enhanced by biological activity. Benthic organisms pump water through the surface layer, and microbial fermentation of organic matter produces methane and other gases which can stir up the sediments in rising. Barge traffic during low water also enhances sediment scour. Erosion (scour) probably provides the primary mechanism of PCB transport in the Upper Hudson River, but the half of PCB transport^(8) which occurs at low flows may not be the result of riverbed scour. The amount of PCB vulnerable to scour has been estimated from a computer model of river hydraulics and sediment transport (9) . Approximately one third (3l) of the total PCB in the sediments between Ft. Edward and Troy are subject to scour (Table 18). Although it is not possible to quantify the relative contribution of the hot spots to this scour, some hot spots do lie in erosional zones. The center of the river channel usually has the greatest potential for scour, but the PCP concentration in these sediments rarely exceeds 50 ppm. (N.B. High concentrations are sometimes found where the cross section of the river is greatly enlarged; the channel areas here act as transient sediment traps which scour under extreme flows.) The river banks and shallow shore line deposits are depositional areas where l to 3 feet of sediment has collected during the past 68 years. Sediment samples with high PCP levels are more frequently associated with these regions than the channel regions^* MUNo 007910 -44- A1though the source is yet to he defined, the total mass of PCF moving Into the estuary is well documented. The Upper Hudson basin delivered approximately 60C0 pounds of PCP to the estuary in 177. The sediment-trans port model estimated that between 70,000 and 120,000 lbs of PCP will be transported into the estuary during the next 20 years if no remedial action (a) is taken. The relative contribution of each reach to scour is given in Tables 6 and 18. Scour potential is greatest between Locks 2 and 4 (reach 3 and 4) and the Thompson Island Pam and Lock 7 (reach 8) (Table 6). These same reaches can contribute the most PCP (Table 18), with reach 8 alone estimated to contribute almost half (4S) of the scourable PCPs between Ft. Edward and Troy. . The remnant deposits also constitute a source of readily erosible material (25) that in some areas is highly contaminated . Approximately 4*,000 lbs of PCB (32 of PCB in remnant deposits) can eventually be transported out of the area by erosion. This is'occurring rapidly as the loss of PCP from the remnant deposit is estimated at 8,600 lbs per year. (25)' Much of this PCP will probably deposit in lower reaches for now, but some undoubtedly contributes to the present flow of PCB over the Federal Bam at Troy (5j700 pounds per year). The rate of leaching of PCP from sediments has not been investigated yet. After the scourable contaminated sediments have been swept out of the Upper Hudson Basin or to stable deposits, PCP will move into the water column by leaching. Contamination of the water and, therefore, biota would consequently continue. MGNS 007911 4- 1'- J. Summary of PCFs in the Hudson River Pasin A substantial quantity of PCB exists in the Hudson River sediments (estimated to be about 64C,CC0 pounds). The General Electric facilities at Fort Eduard and Hudson Fall's were discharging an average of 30-4C lbs PCP/day fofl } (vl3,000 lbs/yr) from 1970 to 1973. If one assumes that both usage and losses of PCB from the General Electric facilities during the peak years prior to 1970 uere at least double the post-1970 rate, then a total discharge since 1950 to the river of more than 600,000 pounds of PCP can be calculated. This suggests that virtually all the PCEs discharged into the Hudson River for the 26 years of their use are still in the sediments of the river, and moat of the PCB la still within 40 miles of the discharge point (upstream of the Federal Dam at Troy). But one should be cautious in drawing this conclusion. / 50^ The EPA suggested that PCEs discharged to the waters of the U.S. since 192 were about 12^ of total cumulative sales of PCB during the same time. General Electric's discharges were only 0.15% of their purchases. The riverbed, however, is not the only contaminated part of the environment. A slightly larger quantity of PCP can be found in the landfills and dumps near Ft. Edvard and dredge spoil areas along the Upper Hudson Piver (Table 1). But PCB in these sites is not as mobile as that in the riverbed. River sediment PCB appears to be an order of magnitude more erosible. Volatilization rates, however, are probably greater at the landfill sites, but no quantitative values are available. Finally, Table IP makes it clear that the biota of the river contains very little PCB relative to the river sediments or dumps. Piomass estimates are not available for the Upper River, but even doubling the estimated total FCBs in biota would make little differences, relatively speaking. MGNS 00791^ Table 1: Summary distribution of residual PCpa in the Hudson P.iver Pasin. Area River sediments (25) Remnant deposits Upp.r Hudson riverbed^"^ (Ft. Eduard Dam Site to Troy) (7) Lover Hudson riverbed (Estuary-Troy to New York Harbor) ,,Dred.ge spoil areas (20) (Upper Hudson) Landfills and dumps (20) ' (tipper Hudson) Fstimated total PCPs Its - 140,000 300,000 Fstimated scourable PCPs __________ Its____________ 45,000 8,000 200,000 7 160,000 530,000 7 - Biota {ori 1 Lower Riverv 200 - 2000 Total 1,330,000 * Does not include volatilization. - Calculated loss rate* (ibs/vr' 8,600 5,700 7 170 POO 7 L. delation of Hudson Fiver to North American PCP use and environmental contamination. PCP production in the U.S. has rapidly declined since 1970. In that year the Monsanto plant at Sauget, Illinois (sole U.S. manufacturer) produced (2Q) about 65 million pounds, 7? million pounds of which were sold in the U.S. ' Since 1929, when PCBs were first introduced, almost one billion pounds of PCP have been sold in North America. Although the data on PCR discharges is very limited, EPA estimates that approximately 5C million pounds have been placed in dumps, 5Q million pounds have been discharged to the atmosphere and 120 (jo) Billion pounds have been discharged directly to fresh and coastal waters. MONS 007913 -47- As noted in the introduction, between 166 and 1974, General Flectric's Ft. Fdward and Hudson Falls facilities purchased 7? Billion pounds of PCP or approximately 15% of Monsanto's domestic sales during that time.^Q^ This night suggests that General Electric's "discharges to the Hudson River Rasin represent close to 15% of the nationwide total discharges to the environment. Generally speaking, contamination of the Hudson River Basin exceeds, In level and scope, any other area found to date in the River sediment concentrations are at least an order of magnitude higher than other contaminated systems (e.g. Lake Ontario; Lake Michigan; Fscambia Pay, Florida; and soils from the Monsanto' plant). The PCP level at a few other sites (e.g. Waukegan River, Illinois and Housatonic River, Connecticut) are comparable, but the resources contaminated do not appear to be as great as the Hudson River. Estimates of the quantity of PCP in the sediments of the Great Lakes'1 exceed those for the Fudson River (e.g. Lake Ontario, 640,000 pounds; Lake Erie, 4,000,000 pounds; and Lakes Huron and Superior, 35,C00 pounds each), but the average sediment concentration of PCE does not exceed 100 ppb for any of the lakes. MUNS 007914 II. E. Available Control Technolop? 1. General Early in formulation of the plan of studytv(dl/, a number of poten tial methods of managing the PCB contaminated sediments were suggested. Although most of these technological alternatives were not studied in detail, their applicability to the Hudson River problem was reviewed (32) The results of this review are summarized in Table 20. As can be seen, some of these alternatives are not applicable to the Hudson River problem because of high cost and/or impracticality, but most were judged to be irsuf- ficiently technically developed to evaluate. Development of sufficient technology to evaluate any of these systems would take five to ten years and cost more than several million dollars. This judgement has since been con firmed in the James River kepone studies. ' During the time period required for the development of the technology, contaminated sediments would continue to disperse through the river system and become less amenable to any remedial action. Thus, the only management alternate studied in detail was physical removal of PCB contaminated sediments by dredging. 2. Dredging a. Technology MONS 007915 categories: Dredges in use today can be generally divided into three (24) mechanical, hydraulic and pneumatic. Mechanical dredges nor mally lift the dredged material above the waterline by means of tuckets or scoops of various designs and deposit it in a barge or similar conveyance for transport and disposal. Hydraulic dredges generally move bottom mat erial via a centrifugal pump and pipeline directly toward a disposal area, whereas pneumatic dredges move bottom material by compressed air and pipe lines . Table 20. Suggested methods of managing PCB contaminated sediments. Alternatives Status of Teclxological Development Potential constraints or environmental probless Estimated treatment costs Removal Activated carbon adsorption Laboratory Technology for application and ' retrieval has not been proposed. $3Q0-3000/acre treated BioLarvesting Conceptual The time and costs involved with harvesting enough fish ore pro hibitive. Tremendous ecological side effects. $2000/lb PCB removed Adsorption by cll-soaked cats Conceptual Teclmology for application and retrieval has not been proposed. Treaendous ecological side effects. Insufficient data Destruction in place Degradation by ultra-violet ozonation Developed for closedsystem applications Treatment requires closed reaction vessel. Insufficient data Biodegradation Laboratory Conditions for the natural microbial decompositions of PCB must be optimized. Potential low cost Chemical treatment Conceptual Possible ecological sida effects. Insufficient data Fixing in place Adsorption laboratory Possible ecological aide effects. Potential low cost Erosion control of river fcottoo Conceptual Insufficient data Chemical fixation Conceptual Possible ecological side effects. Insufficient data Covering PCB contaminated sediments Conceptual modified froo Korstsan (3'>. Massive disturbance of ecosystem. Rupture of seal or ballooning of plastic due to gas formation. Placement of cover difficult. Particulate matter* $3000.-4 00 0 / ac re Sheeting material* $700-18C0/a cre HUNS 0 0 7 9 1 6 Technical dredges used in the U.S. include the dragline, the dipper, the grab bucket or clamshell, and the endless-charin dredge. Of these, the clamshell and dragline are the most common. The clamshell dredge consists of a derrick mounted on a barge with a "clamshell" bucket for excavating. The material is removed by forcing the opposing bucket edges into the sediment. The bucket is lifted out of the water and deposits the spoil on a barge or onshore. The dragline dredge is generally composed of a crane having a bucket suspended from a avinging boom mounted on a barge or truck. The dredge operates by scraping the material from the bottom by pulling the bucket towards the stationary crane. The spoil is then lifted and deposited on a barge or on the bank. Both the clamshell and dragline are available in a wide variety of sizes. The hydraulic suction dredge can he fitted with various mechanisms at the suction pipe inlet to facilitate sediment removal. These mechanisms include rotary cutters or cutterheads, auger-type cutterheads and high-pressure water Jets. Mud shields or dustpans are used on some hydraulic dredges in conjunction with the water jets to reduce secondary suspension at the suction inlet. However, these dredges collect only 10 to 30 percent solids, cause considerable sediment agitation when mechanical cutterheads are used, and can induce secondary pollution at the receiving site because of high water content in the dredged material. Consequently, without the use of sediment-control measures, conventional dredging could pose a serious threat for aggravating an existing, but possibly dormant, pollution problem. Some generic types of hydraulic dredges in the United States include the cutterhead, the plain suction, the dustpan, the hopper, the sidecaster and the Vud Cot. The Vud Cat dredge is comparable to the cutterhend, except that, in lieu of a rotating cutter, it features an auger-type horizontal cutterhead. This dislodges the material, and MQNS 007917 -51- thc auger moves it toward the suction pipe. A mud shield surrounds the auger and thereby minimizes mixing of the disturbed bottom sediments with the sur rounding water. Dredging technology in* some foreign countries surpasses that of the United States, especially in Japan, where serious problems with in-place toxic sub stances prompted the development of a dredge which was designed to remove contaminants rather than to excavate river channels. A significant advancement in dredging technology for removing contaminants was made by improving a pneumatic dredge. The pneumatic or "Pneuroa" dredge, originally developed in Italy, uses hydrostatic head pressure and compressed air to remove contaminated sediments. By applying a vacuum to a pneumatic dredge, the Japanese were able to utilize the dredge in shallow water, thereby eliminating the constraint of needing high hydrostatic head pressure. This dredge is called the Oozer dredge. In general, mechanical dredges can remove bottom material at near-inplace density, whereas, hydraulic and pneumatic dredges have to add dilution water to form the dredged-material slurry. Effective separation of the dredged-material from the water before it is discharged back into the river is necessary. Mechanical dredges, however, tend to resuspend more riverbed material than hydraulic or pneumatic dredges during the dredging operation. The specific dredging technology applicable to a specific project is dependent on dredging objective, environmental constraints, river and dredge- material characteristics, cost, and equipment availability. A detailed review of these factors in relationship to the Hudson River PCP problem has been made. The findings are summarized in fection III of this report. MONS 007916 -52- Figure 16 SCHEMATIC OF HYDRAULIC DREDGING RIVER DREDGE< HEAD ' DREDGE PIPELINE CARRYING DREDGED SLURRY RETURN WASTE OVERFLOW 6BOOSTER PUMP/ (as required) TREATMENT SYSTEM y' i11 11 DREDGE SPOIL 1 l AREA l li PIPELINE MQNS 007919 SOURCE modified from Malcolm Piroie^4* -53- b. Fnvircnmental effects There are two areas where PCP loss can affect hydraulic dredging removal efficiencies: losses at the dredge head and losses in the return waste overflow from the dredge spoil area (Figure 16). Full-scale monitoring of TOT hydraulic dredging in 1976 and 1Q77 in the Upper Hudson showed that dredge-bead losses are minimal (Table 21). Table 22 Table 21: Measured PCP losses at the dredge head caused by hydraulic dredging in the Upper Hudson River near Lock 4. Area Vater velocity Total PCB River Cross Section 1,600 ft.2 .65 fps .1-.4 ppb Suspended Solids 15-35 mg/1 --hit Source: Tofflemire. ' Dredge Head Increase in Fiver Below Dredge Head 16 ft.2 .65 fps 2.1 ppb 120 mg/1 -- -- C.01? ppb 0.06 Ibs/day 1 mg/l shows the return flow loss at three monitored dredging sites in the Upper Fudson. These studies show that one hour of sedimentation can provide 90^ removal of the PCP-laden suspended solids in the return flow. This was further improved by the addition of a cationic polymer to promote rapid destabilization of suspended particles. Surface scums that developed during the dredging operation were found to be very high in PCBs. PCB concentrations were as high as IP,000 ppm, but the total mass was small. Their collection and removal was found to be desirable and relatively easy with proper placement of an oil boon.^> 35) MGNS 007920 -54- Tabl. 22: Summary of hydraulic dredging performance at three sites on Upper Hudson Fiver. Parameter Puoy 212 Silt and clay (J passing 1*200 sieve) Lagoon flow-through time (typical, by salt tracer) Lagoon influent average % solids PCP in solids (pg/g) 5 45 min. 5 100 Lagoon effluent Without polymer Suspended solids (mg/1) PCP (pg/1), composite 500 100 With polymer . Suspended solids (mg/1) FCP (pg/1), composite 250 50 Removal efficiencies (<) Without polymer Suspended solids PCB QO Of? With polymer Suspended solids PCP 9Q.5 QQ Source: ammended from Tofflemire. ^ * Polymer fed between lagoons. ` Lock 4 25 55 min. 3 20 460 3.0 230, 20* <1.5 98 OQ.5 QO QQ.O* oo.p Lock 1 15 min. 1 15 2000 40 400 ? PO 73 6 05 DEC also monitored the 1977-78 dredging near Rogers Island which involved a dragline dredge and power shovels (see Figure 20 for location).' This 200,000 cu. yd. project and its environmental effects have beer evaluated in detail. (37) The adverse effects appeared to be minimal and removal efficiencies were slightly better than the original estimates. These effects were generally limited to within one river mile below the project area. Tnble 71 summarizes ft portion of these data. M0N5 007921 -55- Table 23: Performance of dredging project at Fort Fdvard Channel during the Summer of 1^77. Comparison of actual dredging performance with predictions of Fnvironmental Assessment (J(?) when the project was approximately 45r complete. Parameter Predicted - Actual Total suspended solids added to river by dredging 8700 tons assuming 5^ fines 5220 tons assuming yf- fines V1C00 tons iit fines) PCBs In river Disposal site leachate 5 ppb at low flow 3 ppb at 1500 gpd 0.02 - 1.U ppb 0.47 ppb at 750 gpd* Heavy metals Very low increase predicted under "worst-case" conditions. Insignificant increases through project area. Esthetics Noise, appearance of work area were recognized as temporary factors. Degraded appearance localized; environ mental impact not proportional. (37) Source: Mt. Pleasant. The disposal area could not be covered before winter. complete, a clay cover should reduce this lose. Cnee the site is The experience and data collected from the above full-scale Hudson River dredging projects clearly indicate that with proper precautions, the Upper Hudson River may be dredged with minimal adverse environmental effects, i.e., PCB and suspended-solids losses can be kept to insignificant levels. MGNS 007942 3. Pisposal Three methods of final disposal of PCp-contaminated sediments removed from the Hudson River were studied and evaluated: incineration, biodegradation and engineered encapsulation. ^ a. Incineration General Electric has investigated the technical, economic and environmental feasibility of destroying PCBs in river sediment using a gas-fired (^2) multiple hearth furnace. ^ All PCPs were destroyed when the afterburner temperature exceeded 1800F (982C} with 0.5 sec residency time of the exhaust gases. Although other unidentifiable chlorinated hydrocarbons were produced, they were destroyed by use of an afterburner and scrubber system. Feavy-metal losses were also monitored and not found to be a problem. Although technically and probably environmentally possible, turning river sediments is an expensive undertaking. Fuel costs alone (current prices) would be approximately $10/yd . In order to minimize operating and investment costs, the furnace would have to have a capacity of at least 10^ tons/year (114,000 yd^). Wright-Malta Corporation of Pallston Spa, New York has devised a gasifiergas turbine system which can generate electric power from solids and liauid wastes. (39) The process chemistry has been proven in batch and continuous bench-scale equipment. Tests demonstrated that process conditions providing 11C0F, 300 psi, an alkaline catalyst and 1 hour dwell time would completely destroy PCPs absorbed in paper. HONS 007923 A one megawatt pilot plant could be constructed with operation to connence within two years. It would handle a mixture of 20 tons of solid waste and 30 tons of sewage sludge per day or 15 tons of solid waste and 35 tons of dredge spoil per day. Approximately, 10,000 tons (11,000 yd^) of dredged material could be treated per year at an estimated total annual operating cost of $650,000. Subtracting revenues from electricity generated, the cost would be approximately $50/ton (*57/yd^) of dredge apoil assuming no cost was assigned to concommitant solid waste disposal, b. Biodegradation Research has been carried out by GE to explore the possibility of using naturally occurring microorganisms to reclaim PCB-contaadnated Hudson River dredge spoils. This research was predicated upon the development of PCB-degrading enrichment cultures isolated from various contaminated sources and the study of practical methods of enhancing biodegradation rates of PC? in Twenty-two strains (6 species) of naturally occurring microorganisms that degrade PCBs have been isolated and purified. PCR degradation was confirmed by measuring the loss of PCB and the formation of yellow-colored metabolic intermediates. Measureable PCB biodegradation rates were observed in shake-flask studies using pure and mixed cultures (Figure 17). Satisfactory mixed culture growth was observed in the presence of metal ion concentrations similar to those observed in dredge-spoil samples. Mixed-culture pH optiaia varied from about 5 to 8 and should be compatible with conditions attainable in dredge spoils. Certain surfactants have been shown to significantly enhance PCB biodegradation rates. Biochemical Corporation of America has reported that they success fully applied an adapted strain of bacteria to degrade the TCBs in a MOKS 0 0 7 9 2 ** -58Figure 17 RELATIVE BIODEGRADABILITY OF 1221 COMPOUNDS sample of a sewage sludge received from the City of Bloomington, Indiana^ The sludge, containing 15% solids and 198 ppm PCB, was distributed into chemically clean Hirlenmeyer flasks to which were added minimal salts for nutrients plus the specialized culture (except for the control flask). After two days of shaking, the PCB level was reduced to 54 ppm (74% reductlon). No degradation occurred in the control flask (without the culture). A stellar flask was run at the same tine except that the sludge was diluted with five parts water. After five days of shaking with the culture, the HON5 0 0 7 9 2 5 -59- PCB level vas less than detectable (99.9* reduction). They conclude from this that PCBs in sewage sludge can be degraded by bacterial cultures and that the extent of this reduction is a function of time. These tests Imply that other sludges could also be handled in a similar manner given proper conditions. Because of the rapid development in this area, it is difficult at this time to assess the actual practicability of biodegradation as a disposal alternate. Although sufficient information does not now exist to design for biodegradation, its environmental acceptability and potential low cost make it a highly desirable option, and it would be unwise to take any management action at this time that would preclude its use in the future. c. Engineered encapsulation 1. General description Engineered encapsulation of contaminated dredged materials involves placing the contaminated material in a land burial facility in such a manner that it is permanently removed from man's normal environment. Vithin recent years, governments have Issued detailed regulations regarding the design and operation of chemical landfills which are applicable to encapsulation of Hudson Pdver FOB contaminated dredged sediments. These criteria relate to three aspects of the design of such a facility, i.e. site selection, lining and leachate prevention, and long-term operation and maintenance. 2. Design criteria MUNS 007926 a. Site Selection Potential sites for landfilling PCB-contaminated sediment from the Upper Hudson River Study area were identified based on the criteria / HONS 007927 -61- shown in Table 24. Using these criteria, 40 parcels of land with a total of 3200 acres were found to be generally acceptable as sites.(7L) Detailed field studies would be required before final site selection can be made. Because the size and location of a disposal site depend on the actual dredging program selected, the detailed field studies and final site selection must await selection of an actual dredging program. b. Lining and leachate prevention Figure 18 illustrates potential paths through which FOB can be lost to the environment from a poorly-designed spoil site or landfill. Proper design of an engineered encapsulation site secures the contaminated material so that the potential for these losses are minimized. This includes placing an impermeable barrier beneath the contaminated materials and an impermeable cap above it to prevent excessive infiltration of precipitation from entering the contaminated spoils. The concept of limiting infiltration and percolation to the greatest possible extent is a necessary part of the design plans for any facility. A leachate-collection system should also be installed beneath the spoils and a leachate-treatment facility designed for these sites to collect nd treat any leachate that may be produced. An extensive ground water monitoring system should be installed prior to deposition of any wastes to detect any contamination that might leach from the site and enter the groundwater system. Figure 19 shows a sketch of a typical engineered encapsulation site. Features of such a site include: -A natural impermeable layer (K<10 cm/cec) at least 4 ft thick over the bottom of the site. -Dikes (average height 14 ft) lined with at least 2 ft of impermeable material (K<10"7 cm/sec). MONS 007928 Figure 18 TYPICAL LANDFILL PROBLEMS SHOWING PRIMARY ROUTES OF CONTAMINANT LOSS VOLATILIZATION TO ATMOSPHERE -29- HONS 0 0 7 9 2 9 Figure 19 CONSTRUCTION OF TYPICAL ENGINEERED ENCAPSULATION SITE MONITORING SOURCE > modified from Malcolm PirAlt*(24| MONS 0 0 7 9 3 0 -An impermeable cover (K<1C cm/sec) at least 16 in. thick over the top of the site. This,, together with the 5 percent slope River the top of the dredged material will facilitate runoff and minimize the amount of rainfall penetrating the fill. -An 16-inch layer of select material for turf establishment over the top of the site. This will be seeded and graded and a vegetative cover established to stabilize the site. -A system of monitoring wells into the site to monitor leachate generation, and collect leachate for treatment. -A system of groundvater-monitoring wells to detect contamination that might leach from the site and contaminate groundwater (not shown). A model disposal site for containing FCF-contaminated spoils taken from the channel at Rogers Island was designed and put into operation in 1^77. This site's design varied somewhat from the criteria described above in that it was designed before these criteria were available. Preliminary data indicate that PCP losses from the site are and will continue to be minimal. Additional monitoring of the site is planned, c. Long-term operation An engineered encapsulation site is a manmade structure and as such will require long-term maintenance and operation. Fssential elements of a maintenance and operation program include: -Continued compatible use of the land surface (e.g. ecological study, recreation, material storage, etc.). -Structural maintenance sufficient to insure the integrity of the impermeable harrier. -Proper collection and disposal of any leachate developed (either via on site treatment or by removal to an adequate, off-site treatment facility). -Monitoring to insure that TCP losses to the environment are not occurring (i.e. air, biota, ground and surface water). There is little experience with long-term operation of such facilities; ar.d thus, there ore uncertainties regarding operational costs. If no major problems occur, such costs should be minimal; however, if unforeseen problems occur, ccr-t could be high. MGNS 007931 -65- III. Management Alternatives A. Overview Although an infinite nunber of alternate dredging programs for removal of PCB-contaainated sediments from the Hudson River are possible, distribution of PCPs, existing technology and practical considerations limit the number of actual practical alternatives. Pour alternatives which appear feasible are outlined in Table 25. The following is a description of each of these alternatives along with the technologies and an assessment of the effectiveness of each in removing PCP from the river. 1 . Maintenance dredging Even if no action is taken to dredge PCP-contaminated sediments from the Upper Hudson, dredging will occut there in the future. The Hew York State Constitution gives the State Department of Transportation (DOT) the task of maintaining and improving the State canal system. DOT generally maintains a 12-foot deep channel 200 feet vide. The dredging history from 1Q50 to 176 for the Champlain Canal from Troy to Ft. Edward has been summarized by DOT.^^ In the last 25 years, about 650,000 cu. yds. were dredged from this reach of the canal and wet-dumped inside designated areas. Another 1,600,000 cubic yards were dredged and placed in upland disposal sites. In 1Q73, vhen the Ft. Fdvard Dam was removed, dredging quantities near the Rogers Island and Ft. Edward area greatly increased. From 1Qe:0 to 170 dredging in this area totaled 550,000 cu. yds. However, the total from this area between 1n74 and 1976 was 650,000 cu. yds. Floods in 1976 ar.d 1977 necessitated dredging of the river near Rogers Island again in 177 and 1978, removing an additional 170,000 cubic yards. MQNS 007932 Table 25: Siusnary description and evaluation of possible manageaent strategies for the Hudson River. Possible Management Action Yd^ Dredged from River (1978-1988) Lbs. PCBs Removed from River System (1978-1988) Types of Technology Status 1. Further study ho management action 916,000 50,800 Modified DOT maintenance Continuous DOT maintenance dredging program to assure dredging necessary for permanent removal of >90 Barge Canal operation. of PCPs dredged from river as part of mainten ance program. 2. Stabilize and/or remove remnant deposits. 1,082,000** (888,000)** 165,000* (07,500)** Bank stabilization and/or remove remnant deposits and modified DOT main tenance dredging program as outlined above. Environmental assessment prepared 2-year program anticipated (1978-7), 3. Remove remnant deposits and remove all river sediments with PCD concentra tions greater than 50 ppm (hot spot dredging). 1,660,000 313,000 Removal of remnant de posits and hot spot dredging technology to vary from small special ized hydraulic dredges to large clamshell dredges. Maximum practical PCB containment technology would be used. Remnant deposit environ mental assessment pre pared; 2-year program anticipated; hot spot environmental assessment under preparation; 3-year program anticipated (1979-81). 4. Removal of all river deposits greater than 1 ppm (>5 ppm in rem nant deposit areas). 15,000,000 410,000 Massive clamshell dredg ing effort. Maximum practical PCB contain ment technology would be used. flivironmental assessment not as yet authorized; 10-year program antici pated (197Q-89). Source: calculated from Malcolm Pimie(24> 25> 36^ and Tofflemire and Quirm<26). * Assures area 3, 3A, and 5 are removed from the basin, Assures area 3A and 5 are removed and area 3 is stabilized. HUNS 00793i -67- Using the past dredging experience and assuming that no other extensive dredging occurs, POT will have to dredge and remove from the river more than c00,CC0 y<P of sediment in the next 10 years. Assuming a PC? concentration in the sediment of 35 ppm and a PPf removal efficiency, this activity vill remove approximately 51,000 pounds of POP from the river system. 2. Remnant deposits The remnant deposits are those deposits between the former Fort Edward Dam site and Eakers Falls Dam, 2 miles upstream. These deposits, formed by sediment settling in the former Ft. Edward Dam pool, are highly erosible now that the dam has been removed, and during high river flows, material continues to be eroded and move downstream. The deposits reside in five distinct areas (areas 1 through 5) which can be handled by removal or covering and stabilization (Figure 20). Soils in areas 1, 2 and 4 have POP concentrations of 1-20 ppm; whereas in areas 3 and 5, the soil is contaminated to about 25-2CO ppm. Area 3A has ft surface (top 12 inches) contamination which averages approximately 1000 ppm. Because of their variable PCR concentration and erosibilitv, each of the remnant deposit areas should be treated differently. (25) Vo structural action is planned for areas 1, 2 and 4 because of their low PCP content. Area 5, although high in PCFs, has been previously stabilized and is not now actively contributing PCPs to the river. However, Niagara Mohawk Power Corporation is considering rebuilding the Ft. Edward Dam, and they would have to remove much or all of area 5 to construct the dam. Because of its high PC? content, the surface sediments in area 3A would be removed immediately (l7B). Area 3 is now eroding, hut a combination of further stabilization efforts and removal would he able to treat the variable contamination there. Excavation of areas 3, 'A and 5 would remove approximately 124,CCO pounds MOMS 007934 -M- MONS 007935 -69- of PCE from the river. Normal maintenance dredging during the next 10 years is estimated to remove an additional 41,000 pounds. Whether stabilized or removed, losses of POP from the remnant deposits would be reduced by about 7C*.^^ 3. Contaminant removal - a. Pot-spot dredging Areas of the river where the FCB level in the sediments exceeds 50 ppm have been referred to as hot spots. Dredging only these areas was considered because the greatest PCE removal can be achieved with the least environmental disruption and at the same time the unit costs f-Vpound PCP) of removal are lowest. Dredging can be 94* efficient in removing PCB contaminated (24) sediments whether hydraulic or clamshell equipment is utilized. Thus, 160,000 pounds of PCP can be removed from the Upper uudson River by dredging hot spots which comprise only 8?- of the riverbed surface area. Additionally, the remnant deposit program and normal maintenance dredging (for 10 years) is expected to remove an estimated 153,000 pounds of PCP. The total, 313,000 pounds of PCB, represents 72* of the PCP in the Upper Hudson River and 4* of the PCB in the entire riverbed (Table 19 and 25). This project would require careful examination of each major hot spot so that equipment best suited for each area could be selected. Although some additional sampling would be needed to delineate the hot spots more accurately, the dredging could probably be completed within three years. b. Complete removal of PCB contaminated sediments The most extensive reclamation program would involve dredging the entire 40-mile section of the Upper Hudson Fiver from Pakers Falls to Troy. The dredging yardnges involved are extensive (Table ?5), but essentially all (4^) of the FCB could be removed from the riverbed above HONS 007936 -70- Troy, thus eliminating a major source of PCB to the water and biota of the entire Hudson River. A dredging project of this magnitude would require approximately ten years. . B. Cost The cost of each of the management alternatives discussed above are given in Table 26. MONS 007937 Table 26: Total ten-year costa of potential management alternatives. Total costs are In Billions of dollars. Unit costs are dollars/pound of FCB recoved fron the river systep. Maintenance Dredging' Total$ Unit$/lb. Remnant Deposits Hot Spot Dredging Complete Removal Study and. Total? Unit$/lb. Total? Unit$/lb.Total? Unit$/lb.Monitoring2 Total Coot*3 *2 Total? Unit$/lb. Further study - 2.3 No management action Stabilize and/or tmovq r servant deposits 1.9 Remove recnant deposits end hot spot dredging. 1-3 Removal all river sediments 45 46 45 ---- 3.8" 31" (39) 5 3.8 31 ---- -- 21 121 -- --" -- 3.8 31 - 182 654 0.23 0.57" (0.41)5 2.61 18.6 2.5 50 6.3" 3?" (4.5)5 (46)5 28.7 92 204 499 MOMS 0 0 7 9 3 8 Source: cospiled and modified from Malcolm Pimie-Inc. ^ 'Assures CCT maintenance dredging cost of $2.50/yd . Maintenance dredging in alternative 4 was assumed to be minimal end not recove substantial amounts of FCB. 2I>.vircrccr.tal study and conitorlng will require 1G$ of project coet, 3Lcr.g term maintenance ccsts are not included. `'Assures removal of areas 3, 3A and 5. 5Assures removal of areas 3A and 5 and stabilization of area 3. -73- C. Frvlronrental Impact 1. General considerations Kajor contamination of Hudson River water with PCB has been occurring, even in the estuary, for approximately 20 years. As a result, the fishery resource is now largely unavailable to residents and visitors of New York State because of severe PCB contamination of fish flesh. Sport fishing and illegal commercial fishing still do occur on the Hudson River, however, and a reduction of PCB levels in the fish would go a long way towards ameliorating this public-health impact. Ecological effects of this contamination have not been systematically investigated even during the studies reported here. Subtle, yet serious ecological effects of PCB in the Hudson River may easily have escaped the notice of limited investigation. For example, in the vicinity of Lake Ontario fish eating birds such as herring gulls appear to be suffering reproductive failure caused by embryonic mortality which is correlated with PCB contamination^^. Whether one is primarily concerned with human health or ecological stability, the known impact of PCB contamination on fish edibility is sufficient to warrant consideration of remedial action. Any action which can reduce PCB levels in fish flesh would also help reduce any ecological effects. For reasons explained in Section II, dredging was the only form of remedial action given extensive consideration. Two types of environmental impacts would be expected: short term or those associated with the actual dredging activity and lonfi term or the ultimate effect of moving the con taminated dredge spoil from the river to a disposal site. An adequate evaluation requires that the impacts of dredging need to be compared with the effect of na direct ruir.agorent action. The impacts of various MGNS 007939 -74- alternatives management strategies are summarized in Tables 27 and 28. 2. Short-term impacts (Table 27) In general, as demonstrated in Section II, dredging programs can be designed such that the shor-t-term impacts are relatively small, local and temporary. Fcological disruption can be limited to the area being dredged and, if timed properly, dredging will affect only the benthic organisms. Some land, the amount depending on the alternative, would have to be cleared and prepared to receive spoil; again a local disruption which would be temporary. (N.B. Replanting can rapidly restore vegetation). PCB levels in the air near the dredging and disposal sites would be elevated, during activity, but the levels would not pose a human health threat, nor create a noticeable effect on surrounding biota. Water supplies should also not be affected. And finally, aesthetic impacts would not be significantly greater than presently experienced with maintenance dredging unless the full dredging program is chosen. Then, 8-10 years of substantial activity could create local, temporary aesthetic problems. Even if no management action is taken, dredging will occur in the Tipper Hudson and the Estuary in order to keep the canal and docks open to navigation. This dredging activity will be much less extensive than either hot-spot dredging or total removal of all river sediments and can be carried out in such a way that short-term disturbances are minimal. 3. Long-term impacts (Table 28) The long-term impacts of remedial action are much more difficult to assess than the short-term ones. On the positive side PCB-contaminated sediments can be removed from the river in such a way that PCB does not remain in the riverbed and this material can be stored or incinerated with concommitant PCB containment or destruction. Each of the three dredging HONS 0 0 7 9 4 0 Tab-e 27: Curmsry of short tera environment*! impect of various eanagevent alternatives. Aesthetic Biota Water Supply Land '.'o r-ir.-gcaer.t action <. S*i:ilize/r*ove rcr.-.or.t deposits Minis*! di3tarber.ee in sections of river dredged as part of DOT maintenance dredging pregras. Extreeely localized. Localized elinination of benthic fauna in main tenance dredging areas. Tcrporary increase of PCB levels in aacroinvertebrates isrcdiately dovn3treoa of dredging. Kinical increase in TC3s in vicinity of Waterford water supply intake when areas adjacent to water intake are dredged. Land areas involved ere caall t:d land based operation '.ill be Iceel end of elniaal environmental significance. Kc abort ten impact ether than an stated above for eaintenance dredging. 5-20 acres of lend ray be eonpletely disrupted. . Feaore rer.'.ant Local water quality atand- plus hot spot . ard for turbidity will be treeing violetcd during dredging operation {2-3 yrs). Temporary (1-2 years) loss of bcr.thlc fauna in dredged hot spot areas. Short terra rise in PCB concentration in biota iaarcdictely dovnstrcaa froia dredging area. Temporary increase of TTB ' levels in eacroinvertebratvs inaedLately dovnstreaa of dredging* Since there are no hot spota 75-175 acres if lar.d will be in vicinity of Waterford Intake, no water supply completely disrupted. impacts are expected other than the saintenance dredg ing impact stated above. /travel of all river deposits with KDs gr^tor^Mr. 1 ppi ^;`:its) ' Potentially extensive. Con tinued local disturbance in the areas under active dredging will ccuoe aesthe tic protleas for -10 yrs. Temporary elinination of benthic fauna in dredged areas for period of up to 3 yrs after dredging. Terrorary increase of PCD levels in racroinvcrtetratea larcdLately downstrcao of dredging. Teaporary increase in PCB concentrations in vicinity of Waterford water supply intake when that segnent of the river is dredged. Dp to 1,000 acres of land will be disrupted. MOMS 007941 -76- options removes successively more of the PCB (from 32$ to 97$) located in the Upper River sediments. Maintenance dredging ia estimated to remove only about 11$ of the PCB. As the precise regions of sediment that act as a source of PCBs to the estuary is still unknown, comparable reductions in PCB load to the estuary cannot be calculated and may not occur immediately but should be hastened by dredging. PCB levels in fish should respond relatively quickly to reductions of PCB in the water though substantial (27) data to support this statement do not exist . Anadromous fish in the lover Estuary (e.g, striped bass) are expected to recover more quickly than resident species because much of their life span is spent in cleaner coastal waters. In the Upper River, recovery of the fishery (i.e. PCB levels in flesh <5 ppm) will probably take much longer even if all the PCB-contaminated sediment is removed as the fish here are much more contaminated than those in the estuary (27) . Many unknowns, however, cloud these estimates. Food- web dynamics for PCBs are essentially unknown and could prolong the process of recovery. But, volatilization from water and microbial or other biological degradation, might hasten recovery. No quantitative information is available for these processes in the Hudson River. In addition to these probable improvements expected from dredging several other benefita have been identified. Removal of PCB-contaminated sediment will probably reduce the concentration of PCB carried in the water end suspended sediment, particularly above Troy. Villages (e.g. Waterford) uaing the river water would therefore have one less problem to contend with, although the present levels are not considered to be an immediate health problem. Estuary water supplies would probably not be affected for several years unless total dredging is accomplished. In addition to removing PCBs while dredging, a number of other toxic 7abl* 21: Stcsery of lent envlrowental PCI Cseteln^vat af urlwi iUiiiuIUm. jrrr llaca wtT Supply Laad Air l. fHMt study Ka u(|iwt aclioa a?pt.iri*V, Si,004 lb* ot PCI* will be ravevvd fro* the riverbed by valnt.-ante dodging. U,>U( )5,000 lha far * af the lr.?lca upper river fClii IS dlapetle tod probably lcycla through |S< rtotitrMat, PCI levels In fish and other biota Water eelirn PCS concentration. ps long taro land laytet la la the upper and lower river will not will continue to cauea public foreeeea. change la the foreseeable future (up* health concerns lot people using per river J10 yre, lower river >20); the river sa o source of drlnh- toesr river concentrations nay riaa In* water. Ary plana to use ae highly contaminated PCS sediments the Huda on for drinking water in rove fro* the upper river Into the the future will have to eccoaodata estuary. this conte*iattoo. Cant lowed probable vole* tlllietloe fro* the rlvtr rod dredge spall fro* oalotenaoc* dredging. 2. Stsblllsr/re^ere reenaac depoilt* - A# r-h ,t US,COO lbs of PCIa will b- per.tnatlv tsvovad (ron th t lurched leaving IH.fTJ Us (>r ST. of the up. per rlvrr Inpiate PCI') is disperse and continually recycle thrnuijh II* environ* r*r( Stabilisation of t * r.nnanc <*pail will aAnts.it lally 11 initial* a kriio active source of ?CSa to the up* f*i rlvrr ajracro; will reduce silt and PCS o-rlMlliil af *OT ntlnleesac* dreJg lr.| prnqran. Will reduce by aa unknown anount she tine required for PCS levels In the upper river biota to fall. Klalt-al offsets oa the lower rlTer biota era anticipated. Hay reduce water coiisrn PCI con* centrations In vicinity af Waterford wotsr Intake by reduc ing an active aoucca to the upper rivet. Will her* only a *|ol*el affect on any lower rivet water auppliea, end planned flood all** log far SVC water supply In the foreseeable future. 5-?0 acres of lend will be re Baducttaa of voUtllilstlb* quired for spoil dliposal. Per- fra* river probably slight. BSMAt reitrUtlona on uee el the land will be required, beatrictlont jy be mitigated by using * and es s "Sturt preserve or ecological study area. (Peroanent restrictions could be changed by technological advancement to KB Wctoricl, M# degradation research.) ). Im ree-nt'.t deposit* rtoo ail liver cert* w i (n PC2 ccactcc rt to- >S pp-. C it spot dragging). spprsilxatei* JI3.050 lb* of pets Can reduca PCS biota concontrecleae *lil be per-imotly reej/ed fra* the llrrrb.d |<iv|n| lb* (or 2?) of In upper river by SOI to flah flesh levels el 20>40 pp*. |n the lower the ',ppr liver inplaco TCSs) to dis rlvtr, tish hordes* nay drop by perse aid continually (code through Il.e e e I roe- nt . This opl Ion vlll about 201 to about A*H pp*. ll-'l-aie ill hi.h conccnirat i nn aedl- icr.ti 0)0 pp ) iroe the river system. It vlll subs:sniI elIy reduce the eiie A PCI cvplrrlty of IX7T nlilcnnect drilling epriitl'ri. The dl*i-ntl to be re:u.rd are aiio genrrsily cgntaxlnstcd with or/anlc pellutarie A other toatc rtttrljl*. This project would reoova thee* eateriaia (to* lie river environment. Should eubstont i*l iy reduce water Coltssn PCI toncentrattoot l vicinity of Wecerlord water sup ply (stake. Will have a *argl- nn] affect on lower river water auppliea, dialing A plan ned in the foreseeable future. ))!)} seres of land will be re* Should SubataatlaUe redoes qulrad for ctMivlutri spoils dla- PCS volatilisation fro* posai. Permanent restrictions on tho upper river. uee sf land wilt be required. Ac* atrlctiem* may be nltipated b uslos lend aa e nstura piceerve or <<oltgltsi study area. tPermaacnC restrictions could be changed by techcaologtcel advanceoent In PCI bacterial, blodcgradetioa research). *, Strove all kp;cr About 41,C30 <->4') at the PCI* in the tlvt itpilii upp-r rivet will be permanently removed >1 ;?% OS p-- It-- the riverbed and the e nv | r ar.-ent. la irount d,;ll fult*-tltl reduction* in the iln 4 PC* aicaaj. c vr.-I . < t: tee of (u*ure >"T i'.;*n*nc# the stdi-ents to be rr o.l ere alia rerie'lneod wit* ih*r a.genic poliutanta end eth'-f caa>c ra'.erlala. Tbia project will terxe tlcee aatarltla ttaa tie river ca.I const at. Can redura PCS biota concentrations in the upper rlvtr to flth flesh levels of 10-20 ppm. Iy stgrlti- c.-tky reducing PCI Input Into the l.er river, it nay redoes the body burden of larger flah by about )D-)Cn It levels ctoss e S pp. Will aubacantialIy all*laa(e tho About 1,003 acres ol land will be probli* of PCIa in the village af required far cont**lneted spell Waterford voter supply Intake. dlapotal. Permanent rcatrlctlsne Will alto lower level ol ether an use u( land will be resulted, roalc contaminants i* Waterford levtr let lone oar be m|CI*alrd ky water t\iyylf C-.l KU.iaMt re aln land aa a saline peateeve duce Pvt water column rtallee* |n or .-colaflrai itudy area. (Pet* vicinity of estuary water eupply i-anent re.irUtloS could be tnt*ke by acafflnq aitiv* seuttea rhanyrd br sechnoloilcal advance* ei PCa ca the lower river. Ray aunt in PCS bacterial, biedagreda- educe PCI problems aseoclated vl<h flood skis*iog ptaject. Will lt*tnate alMipher*. Od soe lated v i lb a iud|* beds she b osseattaily HONS 0Q79hi -78- substances and organic pollutants would be removed. Paper fiber and wood wastes from a variety of industries have accumulated on the river bottom ever ainca the dams were constructed more than 60 years ago. Heavy metals and other toxic Bubatances have also been identified in these sediments^. Any dredging to remove PCB-contaminated river sediments will also reduce maintenance dredging requirements in the future. The amount of required future dredging could be considerably reduced and the complexity of handling contaminated material in the future could be substantially alleviated if hot-spot or complete dredging were carried out. Finally, atmospheric levels of PCB that can be associated with volatilisation from the river should be reduced in the long term by 'dredging. Odors associated with existing sludge beds would also be essentially eliminated when these beds are removed. Unfortunately, not all the long term-impacts associated with remedial action are positive. The most serious possible environmental problem is what to do with the dredged material. The PCS can be destroyed by proper incineration, leaving an ash which would not constitute an environmental problem. If incineration is used, a disposal site must still be specially constructed to temporarily hold the dredge spoil . This site would have to contain 9000 acre feet (15 million cu. yd) if total dredging occurs, thus requiring more than 1000 acres of land. Hot-spot dredging or removal of the remnant deposits in the Ft. Edward pool will require much less land as would a temporary site for incineration. This land should be set aside as a nature preserve or ecological study area if the material is not eventually incinerated. Although it appears to be unlikely, the pos sibility still exists that deep-rooted plants can transport PCB from the soil to their leaves. It would be possible to prevent these plants from growing MOMS 007944 -79- on the site, but it also may not be necessary. Further study of this problem could be carried out on the completed disposal site. No long-term, negative impacts are foreseen for the river as a consequence of any of the action alternatives. In fact, one should find an improved quality of biota in the Upper River if most of the sludge beds and contaminated sediments are removed. If no remedial action is taken, some dredging will still occur in the Upper River and the Estuary to maintain the navigation channel. Over the next ten years approximately 40,000 lbs. of PCB (<10% of PCB in the Upper Hudson River) are estimated to be removed from the riverbed. Additionally, PCB in the sediment will continue to move from the Upper Hudson into the Estuary for at least the next 20 years(v9) . Fish throughout the river will therefore still be exposed to PCBs in the water column. PCB levels in fish flesh would probably not begin to decline for at least a (27) decade or two . This recovery would be slower in the Estuary as that would be the last part of the river to be ^flushed out" by river flow. Again, unknown aspects of the fate of PCBs in the biota of the Hudson River make these estimates very tentative. D. Economic Impact to Fishery (written by J.D. Sheppard) 1. Economic value of fisheries The Hudson River has influenced and continues to influence a variety of recreational and commercial fisheries. The magnitude of this influence is difficult to quantify in certain areas, particularly those involving anadromous and marine species. Nevertheless, it is believed that the actual contributions and related economic values fall within the range MGNS 007945 -80- of tha estimates presented in Tables 29 and 10. a. Commerical fisheries The Hudson River is estimated to be currently making a multi million dollar economic contribution through a variety of commercial and recreational fisheries, both marine and freshwater. In the ten years prior to a ban on a major portion of the commercial fishery In 1976, the commer cial finfish fishery (for American shad, striped bass, Atlantic sturgeon, American eel, herring and other species) was reported to be in the order of 300,000 poundB with a landed market value approximating $53,000. However, these statistics should be regarded as the minimum values and, when reporting errors are taken into consideration, the commercial fishery is probably closer to 600,000 pounds and $150,000 - $200,000 in value. In addition, there is an active commercial bait fishery operating in the Hudson River; but, no catches or associated values are available at this time. Several anadromous and marine mid-Atlantic commercial fisheries could also have a portion of their catches associated with the Hudson Elver. These fisheries would be those for striped, bass, American shad, blueflsh, butterfish, winter flounder, summer flounder, menhaden, weakfish, tidal silversides and sea robin. Because no detailed stock assessments are avaiable for most of the species mentioned above, it can only be noted that at least some portion of the New York commercial marine landings (e.g. 1974 New York marine landing: 7.05 million pounds with a landed value approximating $1.8 million dollars) is of Hudson River origin and that the value is in the order of magnitude of at least $100,000's. .b. ,,Recreational fish, eri,es MONS 00 7946 In comparison to the commercial fisheries, the recreational fisheries associated with the Hudson River are more recent and less under- -81- Tabls 29: Sucxary of past, present and potential values for the commercial fisheries of the Hudson River. Fishery Location Flnfish Estuary (Atlantic sturgeon, Striped bass, shad, eel, herring, carp, etc.) Marine Shellfish Estuary (Blue-claw crabs t clams, mussels and oysters) Source: Sheppard(' 4? ) . , Annual value Annual catch Pa3t ''$150,000 to $200,000 -^00,000 lbs. Present'll50.000 '100.000 lbs. Future s^SO.OOO to $A50.000 vl.250.000 2,000,000 lbs. $100,000'b Unknown Past $ Multi-Million Present $ 0 Future $ Multi-Million Table 30: Summary of present and future values of the recreational fisheries of the Hudson. Location Annual Angler-Days Annual Value Glens Falls to Troy Dam Present Future Troy Dam to Poughkeepsie Poughkeepsie to Battery Present Future Present Future Source: Sheppard uFT 0 Dp to 100,000 -'-30,000 Dp to 1,000,000 v| 35,000 Up to 1,000,000 Up to $1.25 million Annually %$300,000 Up to $12.5 million ^$1.35 million Up to $12.5 million MQNS 007997 -82- etood. Between Glens Falls and the Federal Dan at Troy, there has been a small but unquantified recreational fishery has been reported for black bass, black crappie, walleye, yellow perch, brown bullhead and an occasional striped bass. No estimates of the effort or the related expenditures are presently available for this section of. the river. From the Federal Dam at Troy to Poughkeepsie, it has been estimated that at least 30,000 angler-days are spent annually fishing for largemouth and gmallmouth bass,brown bullhead, yellow perch, blueback herring, alevife, rainbow smelt, eunfish, black crappie and incidental catches of atriped bass and American shad. Assuming expenditures for an angler-day approximate $10,00, then this freshwater segment of the Hudson River fishery is generating at least $300,000 annually. Below Poughkeepsie, the recreational fishery is dominated by estuarine and anadromous species including striped baas, spots, eels, white perch, blueback herring, alewife and white catfish. Catches of Atlantic tomcod, juvenile bluefish, veakfish, winter Bummer flounder and American shad have also been reported; however their Importance is presently unknown. Based on limited data, it was estimated that prior to 1976,a recreational effort of at least 135,000 angler-daya occurs annually in the 45-mile section between Poughkeepsie and Tappan Zee Bridge. Assuming the current expenditures for an angler-day is approximately $10.00, then a minimum annual economic value of $1.35 million can be associated with this fishery. As with the marine commercial fisheries, the Hudson River also influences several marine recreational fisheries. However, lack of stock identification precludes any precise estimation except for striped bass. For the striped bass, it has been estimated that contributions could range from 61,000 to 7,058,000 angler-days with a median estimate of 698,000 angler-daya with an associated value of $10.5-14U million annually. HONS OOVUtU -83- Vhcn the contributions tc the marine recreational fisheries for bluefish, American shad, weakfish, flounders and other marine and anadrorr.ous fish species which utilize the Hudson River during a portion of their lifehistories are finally ascertained, total value for the marine segment could approach $3C-40 million annually. 2. Effect of PCB contamination on fisheries Prior to the discovery of PCBs in Hudson River fish, it is generally agreed that the fisheries on the Hudson River were improving. As noted in Table 29, there is an estimated potential for doubling the commercial fisheries in the Hudson River proper and an unknown potential for the marine sector. At the same time, a tremendous potential for recreational fishing exists in the Hudson River (Table 30). In the section of the Hudson River currently closed because of PCB pollution (Glens Falls to the Federal Dam at Troy), there is an estimated potential for 100,000 angler days vith an associated annual economic value of $1.25 million or more. Pelow the Federal Dam at Troy, an estimated potential of 2.0 million angler-days vith an associated economic value in the order of $25 million is not unrealistic. As well, the potential for commercial and recreational shellfish fisheries (e.g. clams, oysters, mussels and blue-claw crabs) in the Hudson River estuary cannot be overstated. Vith the improvement of water quality, toxic substances (e.g. PCPs) would become the primary limiting factor in the reestablishment of a multi-million dollar industry. Besides the closure of the Hudson River commercial fishery except for shad, sturgeon greater than 4 feet in length and goldfish,which currently represents a 60? loss based on 1976 data, the continued presence of PCPs in the sediments and water column of the Hudson River also poses a potential threat to both the marine commercial and recreational fisheries for certain M0NS 007949 -84anadrosous and marine fishes. For example, analyses of striped bass from both Long Island Sound and the New Xork Bight have Shown PCE concentrations generally greater than 2.0 ppm., but less than 5.0 ppm. If the U.S. Food and Drug Administration adopts'a 2.0 ppm standard for PCBs, this represents a serious threat for the marine striped bass fisheries. MGNS 007950 -85- IV. References 1. Hetling, Leo J. and Edvard G. Horn. July 1977. Hudson River PCB Study Description and Detailed Work Plan. NTS Department of Environmental Conservation, Albahy, New York. 2 pp. 2. Normandeau Associates, Inc. . September 1977. Hudson River Survey 1976-1977 with Cross-section and Planimetric Haps. Bedford, New Hampshire. ?f1 pp. 3- Division of Pure Waters. October 1975. PCB Monitoring in the Upper Hudson River Pasin. NTS Department of Environmental Conservation, Albany, Hew York. 110 pp. 4. Division of Pure Waters and Division of Fish and Wildlife . October 1976. Hudson River PCB Monitoring: Data Summary - Past, Present, Proposed. NTS Department of Environmental Conservation, Albany, New Tork. 106 pp. 5. U.S. EPA, Region II . February 1977. PCBs in Lower Hudson River Sediments: A Preliminary Survey. Surveillance and Analysis Division, Edison, New Jersey. 40 pp. 6. Toffleaire, T.J. and T.F. Zimmie . September 1977. Hudson River Sediment Distributions and Water Interactions Relative to PCB: Preliminary Indications. Manuscript for Kepone Seminar II, U.S. EPA, Region III, Easton, KD, 26 pp. 7. Bopp, Richard . 1978. Personal communication. 8. Turk, John. 1978. Personal communication. . 9. Lawler, Matusky & Skelly Engineers. March 1978. Upper Hudson River PCB No Action Alternative Study: Final Report. Pearl River, New York. 190 pp. 10. Anonymous. 1977 Fish Sampling and Analysis Program - Hudson River. NTS Department of Environmental Conservation, Pureau of Environmental Protection (unpublished). 7 pp. 11. Spagnoli, J. & L. Skinner. September 1977. FCBs in fish from selected waters of New Tork State. Pest. Monitoring Journal 11_(2): 69-87. 12. Sloan, Ronald. January 1978. Report presented to PCB Settlement Advisory Committee (unpublished). 13. Stone, Ward. February 197F. Personal communication. MONS 007951 14* Simpson, Karl V., Russell C. Kt.Pleasant and Erian Bush. September 1977. The Use of Artifical Substrates for Monitoring Toxic Organic Compounds; A Preliminary Evaluation Involving the PCB Problem in the Hudson River, New York. Manuscript for Fepcne Seminar TI, U.S. EPA, Region II, Easton, KD. 17 pp. -86- 15. Simpson, Karl. March 1978. Personal communication. 16. Clayton, J.R.,Jr., S.P.Favlou, and N.F. Ereitner. 1977. Poly chlorinated biphenyls in coastal marine zooplankton: Bioaccumulation by equilibrium partitioning. Environ. Sci. Technol. 1J_: 676-682. 17. Simpson, Karl. January 1978. Report to PCB Settlement Advisory Committee (unpublished). 18. General Electric Corporate Research & Development. January 1978. Report to PCB Settlement Advisory Committee (unpublished). 19. McFarland, Charles. March 1978. Personal communication. 20. Lais, Walter (Veston Environmental Consultants). March 1978. Personal communication. 21. Romano, David. January 1978. Report to PCB Settlement Advisory Committee (unpublished). 22. Fuller, B., J. Gordon, and M. Komreich. April 1976. Environmental Assessment of PCBs in the Atmosphere. Mitre Corporation, McLean, Va. for U.S. EPA. 336 pp. 23. Benenati, Frank (Weston Associates). January 1978. Report to PCB Settlement Advisory Committee (unpublished). 24. Malcolm Pirnie, Inc. January 1978. Dredging of PCB-contaminated River Eed Materials from the Dpper Hudson River, New York: Feasibility Report. White Plains, New York. 25. Malcolm Pirnie, Inc. March 1978. Environmental Assessment of Remedial Measures at the Remnant Deposits of the Former Fort Edward Pool. White Plains, New York. 173 pp. 26. Tofflemire, T.J. and S.O. Quinn. In preparation. PCB in the Upper Hudson River: Mapping and sediment relationships. 27. Hydroscience Associates, Inc. April 1978. Estimation of PCB Reduction by Remedial Action on the Hudson River Ecosystem. Westwood, New Jersey. 107 pp. 28. Sofaer, A. February 1976. Interim Opinion and Order, unpublished opinion in the matter of violations of FCL by GE Company New York State Department of Environmental Conservation, File H 2833. 77 pp. 29. U.S. Environmental Protection Agency. January 1975. Scientific and Technical Assessment Report on Polychlorinated Biphenyls. Washington, D.C. EPA-600/6-75-OOX. 10 pp. 30. U.S. Environmental Protection Agency. January 1976. Review of PCB Levels in the Environment. Washington, D.C. EPA-560/7-76-001. 1A'1 pp. HONS 00 7952 -87- 31. Follution from Land Use Activities Reference Group (PLUAP.G). April 1976. Final Report (Draft forking Document). International Joint Commission, Windsor, Ontario. 132 pp. 32. Korstman, K.H. Kay 1,977. Evaluation of Non-dredging Alternatives to the Removal of PCB Contamination"in the Hudson River. Comp. Ed. 18 thesis, Union College, Schenectady, N.Y. 51 pp. 33- U.S. Environmental Protection Agency. January 1978. Mitigation Feasibility for the Kepone contaminated Hopewell/James River Areas. Washington, D.C. (preliminary draft). 34* Tofflemire, T.J. unpublished data from October 1977. 35* Tofflemire, T.J. April 1976. Preliminary Report on Sediment Characteristics and Water Column Interactions Relative to Dredging the Upper Hudson River for PCB Removal. New York State Department of Environmental Conservation, Albany, New York. 62 pp. 36. Malcolm Fimie, Inc. April 1977. Environmental Assessment of Maintenance Dredging at Fort Edvard Terminal Channel, Champlain Canal. White Plains, New York. 271 pp. 37. Mt.Pleasant, R, January 1978. presentation to PCB Settlement Advisory Committee, data summarized from Miner, W. January 1978. Fort Edward Maintenance Dredging Project Monitoring Report. New York State Department of Environmental Conservation, Albany, New York. 38. Griffen, F.M., C.M. McFarland and A.R. Sears. February 1978. Research on Removal or Treatment of PCB in Liquid or Sediments Dredged from the Hudson River: Semi-annual Progress Report. General Electric Company, Corporate Research and Development, Schenectady, Hew York. 39. Coffman, John A. (Wright-Malta Corporation, Ballaton Spa, New York). February 1978. personal communication. 40. Blair, James E. (Biochemical Corporation of America, Salem, Virginia). February 1978. personal communication. 41. Gilbertson, M. & G. Fox. 1977. Pollutant associated embryonic mortality of Great Lakes herring gulls. Environ. Pollut. T2.: 211. >' 42. Sheppard, J.D. April 1976. Valuation of the Hudson River Fishery Resources: Past, Present and Future. New York State Department of Ehvironmental Conservation Report, Albany, New York. 43. Malcolm Fimie, Inc. August 1977. Investigation of Conditions Associated with the Removal of the Fort Edward Dam: Review of 1975 Report. White Plains, New York. 141 pp. HONS 007953 -8844. United States Department of Interior, Geological Survey. 1977. Chemical Quality of Water in Community Systems in New Tork: Kay 1974-May 1975. Open-file report 77-731. Albany, New York. 93 pp. 45. Syrotynski, Samuel. May 1978. personal communication of 1976. Hew York Department of Health Public Water Supply data. 46. D.S. Department of Interior, Geological Survey. 1976. Water Resources Data for New York Water Year 1975, Volume 1: New York excluding Long Island. Albany, New York. 47. Bureau of Environmental Protection. Monthly Report on Toxic Substances Impacting on Pish and Wildlife. Kev York State Department of Environmental Conservation, Albany, New York. HONS 007954