Document KGEx8LKjb1XM0o55R9r8wQGM2
PLAINTIFF'S EXHIBIT CAP-1031
REPORT ON ASBESTOS/CEMENT PIPE USE IN THE
CITY OF ABILENE, TEXAS
PREPARED FOR: THE A/C PIPE PRODUCERS ASSOCIATION
1600 WILSON BOULEVARD ARLINGTON, VA 22209
PREPARED BY: WADE MILLER ASSOCIATES, INC.
6260 15TH PLACE NORTH ARLINGTON, VA 22205
APRIL 19, 1982
CAPCO JEN 0023499
REPORT ON ASBESTOS/CEMENT PIPE USE
IN THE
CITY OF ABILENE, TEXAS
Introduction The City of Abilene's Water Utilities Department is the
seventh of ten systems studied as part of the Municipal Analysis Program of the A/C Pipe Producers Association. In this site visit, as well as the other nine, the objective was to investigate the use of A/C pipe from various perspectives in order to build a comprehensive data base. The broad func tional categories covered by this fact-finding mission are as follows:
o Institutional
o Operational - Specification, Decisionmaking, and Procurement
- Installation and Testing - Operation and Maintenance - Repair and Replacement
- Detection and Prevention
o Financial Information was obtained in most of the categories listed above, and each is discussed in the report. Background on the Abilene Site Visit
The site visit to Abilene was completed in one day on Monday, February 8. The reason for truncating the visit was due to the nature of the operation itself. The Water Utilities Director is Dwayne Hargesheimer, an- efficient, matter of fact manager who had most information requested either in his office or nearby. Unlike visits to other systems in which time was split among several persons, a full 90 percent of the Abilene visit was spent with Hargesheimer himself. Near the end of the day, the purchasing agent and a long-time maintenance supervisor (James Cheek) also were interviewed.
i
CAPCO JEN 0023500
2- -
Abilene officials ax pipe. They have used A/C but are now beginning to well. In fact, Hargeshei pay as much as 15 percent of installation."
not enthusiastic about the use of A/C predominantly since about 1960, uy substantial amounts of PVC as er notes "developers are willing to more for PVC, due to greater ease
There was one inters is unique to the site vis tried to get on the Abile buy the Belgian pipe and court, and Johns-Manville court fight. The judge x is unknown.
ting anecdote heard in Abilene that ts. In the early 1960's, the Belgians e bidders list. Abilene refused to he Belgians sued. The suit went to assisted the city financially in its led in favor of Abilene; the reason
Abilene has used for ign pipe. Like several California cities, they laid some Ja anese pipe in the mid-1960's.
Institutional and Organiz tional Information
Abilene has a strong The current city manager fund is an enterprise fur According to Hargesheimex a franchise." The utilit in city hall and pays fox in turn pays for all wate
city manager form of government. s Ed Seegmiller. The water utility , separate from the general fund.
the water utility is operated "like pays a franchise tax, it pays rent other services received. The city use.
From 1960-80, the wa er utility did not float any bonds. In 1980, however, a $12.1 million bond issue was floated, the proceeds of which will be expended for sewer ($2.1 million) and various water improve .ent projects ($10 million). The bonds are general obligat on, but will be paid for exclusively out of water revenues. P `proximately $2 million of this total will be expended on pipel ne replacements.
The City of Abilene .as a population of about 102,000 and growth is occurring a the rate of 2 percent annually, The water system has appx ximately 35,000 service connections, and this figure is growir at the rate of 2200 per year. The city supplies treated wat r to various customers outside the city limits under contrac , including Dyess Air Force Base, the Cities of Merkel and ye, and several unincorporated communities and rural wat r supply corporation.
The City depends on of water. These three la are all manmade and have from surface runoff. The lakes is 27.3 billion gal elevation. Abilene's wat is about 40 mgd. Average
hree lakes for its primary source es, Abilene, Kirby, and Fort Phanton, arthen dams which impound the water combined total capacity of these ons when they are standing at spillway r usage is about 19 mgd; peak demand per capita usage is 171 gallons.
i CAPCO JEN 0023501
-3-
With regard to organization, the Water Utilities Depart ment consists of seven divisions, four of which handle water production, treatment, distribution and administrative functions. The other three divisions handle wastewater collection, treat ment and disposal. Organization charts for the Water Utilities Department and the Water Distribution Division are shown on the following pages. The present work force consists of 145 employees.
The Transmission and Distribution System
Abilene's transmission and distribution system consists of approximately 660 miles of pipe, the majority of which is cast iron (400 miles). Transmission mains are cast steel cylinders. The largest main is the 39-inch steel lined with concrete line connecting the Ft. Phantom Hill Pumping Station and the Northeast Treatment Plant.
The Water distribution system is divided into two pressure zones. A schematic of the system as it existed in 1977, com plete with maximum hour pressure contours is shown on page 6. Service pressure varies from 32-80 psi. One pressure zone has pressures of 30-58 psi; the second has pressures maintained between 58 and 80 psi.
Abilene has about 250 miles of A/C pipe, most of it 6 inches to 16 inches in diameter. Some 18-inch A/C is purchased for repair purposes. On the lower end, Hargesheimer will not buy 4-inch A/C because of its lack of beam strength.
There is a definite trend toward PVC use in Abilene. Although the system contains only 10 miles of PVC currently, old cast iron mains are being replaced with PVC C-900. Some PVC also is being used in water main extensions, both by city forces and developers.
Actual statistics reflect this trend. Installation figures for a 13-month period, January 1981 through January 1982 are shown below.
Material
A/C PVC Cast Iron Other
INSTALLATIONS (January 1981 through January 1982)
______________________Size (inches)__________ 2 4 6 8 10 12 14
16 Total
900
4418 9
8984 1658
35
5315 163
1641 35
4343 360
3214
1121
24,618 7,534 9 35
TOTAL
32,196
i 'i CAPCO JEN 0023502
CAPCO JEN 0023503
CAPCO JEN 0023504
Stores Worker _____________
Draftsman _______ _______
Heavy Equip Operator
Maint Worker
I" * I
CAPCO JEN 0023505
-7-
pVC installations during this period accounted for 23.4 per cent of total, while A/C accounted for 76.5 percent. The majority of PVC installed was in 2-6 inch; however, more than 500 feet of 8-12 inch pipe was installed. PVC is approved for use in the 4-16 inch size range.
PVC also has become extremely competitive from an initial cost standpoint in smaller sizes. The latest competitive bid figures had A/C at $2.34 per linear foot and PVC C-900 at $2.41 per linear foot for 6-inch pipe.
OPERATIONS
Specification, Decisionmaking, and Procurement
Purchase specifications for water pressure pipe are developed by the utilities director, depending heavily on AWWA and ASTM specs. Installation and construction specifications are developed by the city's engineering department, a division of public works. The water department specifies materials and the parameters of the job, but development and final approvals come from the city engineer.
The purchasing specification for A/C, shown on page 8, is short and simple. An annual contract is awarded; only the quantities part of the specifications changes in a given year. As can be noted, the amount contracted for in 1980 was 27,250 feet; 66 percent of this total was for 6- and 8-inch pipe. The annual budget for pipe purchases is about $250,000. Class 150 pipe is purchased except in the 4-inch size. This was an attempt to obtain more beam strength. However, in 1981, no 4-inch A/C was purchased. Although the specifications do not include a list of acceptable bidders, only the three U.S.
manufacturers are allowed to bid. CAPCO has been the success
ful bidder in the past two years.
With regard to design considerations, the primary external consideration is soil conditions. The soils in and around the city are predominantly clay and caliche. Primary internal design considerations appear to be fire flow and service pressure. Hargesheimer explicitly stated, however, that design decisions are based on "results and price."
Hargesheimer personally makes decisions on pipe purchases with respect to quantities and construction materials. There are no so-called consumer constraints. Hargesheimer can remember only one phone call regarding pipe materials.
CAPCO JEN 0023506
8- -
SPECIFICATIONS FOR ASBESTOS CEMENT FLUID-TITE PRESSURE WATER PIPE All pipe must meet AWA Specification C-400, Federal Specification SS-P-351-A and A. S. T. M. C-296 and D1869 or latest revision thereof.
1. All pipe must be tested within Continental United States. 2. All pipe must be Class 150 with the exception of 4 inch which
shall be Class 200 with a standard length of 13 feet with a plus or minus tolerance of 1 inch. 3. All machined nipples will be ordered as needed by the City. 4. All pipe must be supplied with couplings, rubber gaskets and solvent necessary for installation. 5. Pipe will be ordered as needed with a minimum order of one truck load for a period of one year from date of contract. 6. Quantities for bids shall be: 250 Ft. of 4 inch - 200 Lb. Class 10,000 Ft. of 6 inch - 150 Lb. Class 8,000 Ft. of 8 inch - 150 Lb. Class 2,000 Ft. of 10 inch - 150 Lb. Class 2,000 Ft. of 12 inch - 150 Lb. Class 5,000 Ft. of 14 inch - 150 Lb. Class
ir CAPCO JEN 0023507
-9-
A/C is purchased for two reasons: competitive price and non-corrosivity. The Director also feels A/C "expands and contracts as conditions dictate, resulting in fewer breaks. He believes cast iron is more rigid. The Director notes that "he can't fault the asbestos/cement in our system too much." Too many breaks resulting in increased maintenance problems coupled with price of cast iron led to the initial use of A/C around 1960.
Abilene 'officials have only one request to make of the industry. Hargesheimer noted CAPCO uses 0-rings that do not require water pressure for sealing the joint whereas JohnsManville and CertainTeed rings do. The CAPCO rings are "harder to hit home," however. The Director would like to see this inconsistency resolved, preferably by making the 0-rings sealable without water pressure, but with less difficulty than currently experienced with CAPCO rings.
Installation and Testing
Most of the pipe installed in Abilene for main extensions is laid by contractors acting on behalf of developers. City forces make all repairs in addition to handling some main replace ment. To illustrate the point, during the one-year period, October 1980 to September 1981. developers or their contractors installed 8.6 miles (81.5%) of pipe while city forces laid 1.95 miles (18.5%).
As noted earlier, construction specifications are developed by the public works department. The specs currently are being revised; thus, neither a copy of the new specs nor the old ones was available.
Water pressure pipe is installed in alleys, which are small service ways between streets. More than 95 percent of the city has its utility lines installed in these alleys. This is a concept not encountered in the other nine systems visited.
Abilene's city forces are "very careful" in the handling of A/C, noting if the chain is placed in the middle of the pipe, breaks can occur. The depth of cover is 30 inches from finished grade. The frost line in Abilene is 18 inches.
The Director believes strongly that the key to successful A/C use is proper bedding. Special precautions are taken to keep the pipe level and not "hump it." In caliche soils, aggregate or rock .is used as bedding materials. Normally a very fine sand similar to a beach type sand is used. An advantage of this type sand is the ease in digging whether it is wet, dry, or cold.
CAPCO JEN 0023508
-10
Backfill materials, depending on conditions, range from native materials to sand, buckshot (very small rock), or "bend fines" obtained from a local rock crushing operation. Compaction typically is accomplished through jetting or flooding.
Abilene can only be termed very lax in the areas of pressure testing and disinfection. They have not pressure tested for 15 years, and their policy regarding disinfection is that they "just flush until they get a chlorine residual." City engineers do inspect developers work. The greatest installation difficulty is getting the pipe laid right. Most pipe is actually installed by "wetbacks."
The Director is not familiar with "Recommended Work Practices for A/C Pipe." It is recommended that he be sent a dozen copies.
Installation costs for 6- and 8-inch A/C are running about $10.25 per foot, excluding paving and engineering. Asstiming that paving costs $3 per foot and engineering 10 percent of costs, total installation costs amount to $14.60 per foot. This figure is based on one developer job which cost $465,411 for the installation of 8.6 miles of pipe. The city has estimated costs of installation by city forces at approximately $11 per foot for 6- and 8-inch pipe.
Tapping is accomplished by Mueller tapping machines of the non-purging variety. Little detail was made available on specific procedures.
Operation and Maintenance
Mainbreaks
Most mainbreaks in Abilene are cast iron breaks occurring at the bell. The majority are bell joint leaks in leadite joints of 4-, 6-, and 8-inch pipe. Abilene also has had some joint leaks on PVC pipe. Officials feel that most of their . breaks are caused by temperature changes and increased system pressure in the summer months, resulting from increased demand.
The Abilene area receives an average of 21 inches of rain fall annually. Heavy rainfalls are experienced in September and October. However, officials feel more breaks result from dry-hot and dry-cold weather than wet-cold.
A/C pipe failures occur infrequently. These are usually beam breaks. Hargesheimer could not recall any A/C breaks, but reckoned as how they may get one per month. An inspection of January 1982 recrods revealed 80 leaks or breaks; only 4 of 80 or 5 percent were in A/C.
i r
CAPCO JEN 0023509
-11
Water department records show that the following leaks were repaired in past years:
Year
Number of Leaks
1970
1971 1972 1973 1974
1975 1976
1977 1978 1979 1980 1981
423 476 410
444 542
413 477 437 638
750 600 677
Over the past four years, the highest number of breaks occurred in December/January or July/August, bearing out the belief that most breaks take place in dry-cold and dry-hot periods. The data which defy explanation are total number of leaks. Since old, leaky cast iron mains are being replaced, one would expect the total number of leaks to decrease as new pipe is installed.
C-Factor
Freese and Nichols Consulting Engineers conducted a municipal water system analysis for the city in 1978. As part of this analysis, the Hazen-Williams coefficient (C-Factor) was determined for 10 locations within the distribution system.
C-Factors determined were unusually high, ranging from 43 in a section of 20-inch cast iron to 180 in a section of 12-inch A/C. The C-Factor for five sections of cast iron averaged 87 while the five data points for A/C averaged 152.6.
Freese and Nichols officials, believing an error had been made, rechecked each test point and derived the same figures.
A comparison of results is shown on page 12.
Repair Costs and Practices
An inspection of leak repair records (a practice initiated only recently) for October and November of 1981 reveals average costs of $1097 per leak repair for 102 leaks. This includes labor, equipment, and paving.
Abilene fields four repair crews, one to service actual main breaks and three crews to repair leaks. Most leaks are repaired by applying a leak clamp. When a section of cast iron must be replaced, PVC is used to make the repair because they have the same outside diameter. Only those repairs in
CAPCO JEN 0023510
-12-
Comparison of "C" Factor Results
Test
1 2 3 4 5 6 7 8 9 ' 10
Size (in)
10 20 20 12 12 12 12 12 12 18
Type of Pipe
C.I. C.I. C.I. C.I. A.C. C.I. A.C. A.C. A.C. A.C. ^ *
Pipe Age (Yrs.) 18 52 14 18 18 24 9 6 21 28
Avg. Vel. (fps)
2.29 2.75 2.18 5.20 4.55 2.72 4.11 2.98 2.84 2.10
Flow Rate MGD 0.81 3.84 3.04 2.64 2.31 1.38 2.09 1.51 1.44 2.40
Loss Ft. per
1000 2.41 10.36 4.25 5.82 4.13 1.78 3.02 1.54 1.49 2.33
"C" Test
121 43 55 152 160 151 172 180 173 78
i CAPCO JEN 0023511
-13-
12-inch or smaller sizes are made with PVC. A/C sections presumably are replaced with A/C.
Aggressiveness Index
Hargesheimer is very familiar with the aggressiveness index. Abilene uses the Langelier index as a measurement of corrosiveness; they maintain an index of 1.0-1.3. A typical analysis of treated water from the City's Northeast Plant shows an alkalinity of 48 mg/1, hardness of 108 mg/1, and a pH of 9.9. From this data, an aggressiveness index of 13.36 can be calculated.
Other Repair Problems
Abilene is experiencing problems with service connections in its polybutylene service lines. Quite a few breaks at the corporation stops have occurred--similar to the severe problems experienced in San Antonio.
Leak Detection
Abilene does not have a leak detection program. They do not feel a program is needed since leaks in their right clay soils usually show up on the surface. Unaccounted for water in the system is estimated at 10 percent.
Main Replacement
Unlike almost all other systems studied, Abilene does not appear to have a consistent long-term main replacement program. They have a program but it is planned on a year-to-year basis rather than long term as is the case of San Diego and Houston. The main replacement program is "based on need." Abilene has identified some 2-, 3-, and 4-inch problem lines, and they have been placed on the docket for replacement. Replacement of these small lines is with PVC Class 200 pipe. The replacement level planned is about $2 million over the next two years. About $500,000 will be spent in replacing steel lined with concrete transmission lines; the remaining $1.5 million will be split between smaller (PVC) main replacement and larger size (8-12 inch) A/C replacement
FINANCIAL
Because of a change in the method of accounting for transfers to debt service, the water and sewer enterprise fund posted a "loss" in fiscal year 1980-81. Upon closer inspection of the income statement and balance sheets, the Abilene utility is in excellent financial condition--as are most of the systems studied. The debt service coverage ratio has ranged from 3.54 to 5.47 over the past three years, about three times the industry
i '1
CAPCO JEN 0023512
-14-
average. Even more impressive is the retained earnings level which stands at $18.3 million. Long-term debt amounts to $5.4 million. Compared to total assets of $43.4 million, an excellent debt-asset ratio of 0.12 can be derived. Many eastern public utilities would envy this financial position.
The City of Abilene's bond rating is A1 (Moody's Investor Service) and AA (Standard and Poor's). At times, the Water Utilities Department elects to float revenue bonds and therefore has a rating as well. Its rating is A (Moody's) and AA (Standard and Poor's).
Comparative bid data for A/C and PVC pipe were obtained. For the most recent bid, dated December 29, 1981, the City contracted to purchase 55,000 linear feet of A/C and 5000 feet of PVC. Complete bid data are shown on page 15. Note the November 20, 1979 unit prices displayed. A/C prices have actually decreased by 5-10 percent over a three-year period. By contrast, PVC prices have decreased markedly, by 26 percent in the 6-inch size and 22.3 percent in the 12-inch size. Given the fact that PVC has gained a "foothold" in Abilene, do these figures represent a reduction in production costs or a "loss leader" for the industry?
Conclusions
Of the ten systems visited, Abilene shows the greatest trend away from A/C toward PVC. Purchases by the City are based on "results and price"--and the PVC prices, as illustrated above, are only marginally higher. The problem is exacerbated by developer preferences for PVC; the Water Director noted they are willing to spend 15 percent more for plastic pipe.
Equally as alarming is the fact that Abilene is extremely pleased with A/C's performance. Mainbreaks are rare, the average C-Factor is above 140, and initial costs have decreased over a three-year period. Also, city forces are confident they hold the key to successful A/C use--careful bedding. Abilene officials recommend we refer San Antonio to them and they would "show San Antone how to lay A/C pipe."
Although Abilene is a relatively small customer (compared to Houston or San Antonio), battle lines have been drawn and the A/C industry must respond if Abilene is to be retained as a customer. Substantial PR, attention and technical assistance could go a long way toward securing this key account.
CAPCO JEN 0023513
U.P.
-15l.
SMi" <3^> r. C V>-
a
d>
fj V*
-s&^ sra>
cao-
sS ,v3
ri
rr
VT
n9
/ V-. `J
-.a
o (>-
SS
O0
| 0U9I XI *03<?M CL LZZL xoa *0 *d 3
^uediuoo uBqoy oqi
j-------------- ------------------
LttSL XI `SBllBQ I S80Z1? xog *0 *d 1 iCuBdiuo3 /C[ddns 1 SU3P3 3 S3|M03
1 *r
CL
5
. m6L XI *>poqqm CL SCfrS X08 *0 *d 3
'.dns iBdtoiunw 3 2 0
1 ' Z0L6L XI `pueipiw 229L xog '0 *d 1 uoiqBJOdJOO S3 lbs * 31LtASuew-suqop
a: 3
Bid #491
DATE OF OPENING
12-29-81
1 11091
XI `uoq6ui jjy
I 881 xoa *o *d J'03 ^[ddns xbi-subui
fS
.
l^fe 1 -W
UJ Q
Z
{-3
Si
to 12 00
M
1ix c 5| 5
Ho
f-r,
3 -Q
2
S
K
DESCRIPTION
UNIT PRICE
V*
rs>
Vj
r t
Vi N,
v* N
Vs
<st
si N
t.
*
^V '
<S > si
*
&&$
Vs
KSs V?
NS <3s *N
4.000 f t . 4.000 f t . 4,000 f t .
--------------2--0,--0--0--0--f--t-.---
4J 4J
4- 4-
OOO OOO in CO
<r~4
LaU. a--.*
--
&2UU0JJ:
-----
0mH0Um<CO0J*
----
a
CO r--
r---- "-- 6"
CM C<-
in 10
i9 14" 16"
C900-75 Pipe, Class 150 DR-18:
N^l
>
N.
ft- ' '>$ s$. ''
< 5
Sj >
s?
-
&
vV.. `O
V. VV?i
s >v>
Li *-s
IVi
WV.-* ' O
Vs NS "V
V SS *.v ^Os
> <f X>
S3 *
w N Si
4 >E 5
5
g **
1,000 f t .
2.000 f t .
4J 4H- 4-
O O O
Cc c
r--<
5
12"
B"
c: CO Pv. CO cr O
H
DEPARTMENT
' Water Department
TIME OF OPENING
10:00 a.m .
.*`!J i *T;
CAPCO JEN 0023514
TABULATED & .PREPARED B Y J I
DATE OF AWARD:
| AWARDED TO
I