Document KG2rg4bmbv1wpNONR5qK9YXNr
tr*n w:
E. I. du Pont de Nemours & Company
Wilmington. Delaware 19898
ENGINEERING OEP4RTMENT LOUVIERS BUILDING
H.L.Acam-Emc. Re 1.-Nemours S. Z.Bye-Petrochem-Seneca T. A.Kittleman-ESD (Items 1-2) O.T.Skretveat-CR&D-Haskell Lab
J. W. Bavman-E.r.p . Rel. -Kemcura W. H. Darnell-C&P-Brandywine W.S. Cccton-DuPont Canada,Inc.-Kings S.S.0'Shea-DuPont Canada,Inc.-
Mississauga
J.N.Glenn-Design
IC fl-a--1
October 7, 1980
PRESENT:
ABSENT :
L. T. FREELAND - CHAIRMAN - POLYMER PROD. - BEAUMONT
R. L. BARNHART - PETROCHEMICALS - VICTORIA
D. J. CALVO - POLYMER PRODUCTS - LOUISVILLE
K. A. CHEN - C&P - CHAM3ERS WORKS - BUILDING 1094
R. J. DAM - ER&D - E?L
`
S. W. DIXON - CR&D - HASKELL
J. R. MARTIN - EMPLOYEE RELATIONS - NEMOURS
R. A. MEAD - F&F - BRANDYWINE
J. A. MORELLO - ESD
L. F. PERCIVAL - POLYMER PRODUCTS - DU PONT
.
D. J. STITZER - DESIGN R. W. STOWE - C&P - EDGE MOOR
.`
A. R. GREENING - STANDARDS SECTION
L. H. WILLIAMS TEXTILE FI3ERS - KINSTON
VISITORS
J. 30WMAN - EMPLOYEE RELATIC: J. MATTSON - CR&D - HASKELL LAB
.5
STANDARDS SECTION - AIR QUALITY SUBCOMMITTEE MINUTES FOR THE MEETING HELD THURSDAY, OCTOBER 2, 1980 AT 8:30 A.M.- IN ROOM 13418, NEMOURS BUILDING
APPROVAL OF MINUTES
.
* The minutes of the August 7, 1980 meeting were approved.
AIR QUALITY STANDARDS BOOKLET
Please insert the following in your Air Quality Standards
Booklet.
^
A revised index for the booklet. -
An Alphabetical Index for Du Pont Engineering
Standards.
Revised green sheet copies of jlj, J3J, J5L, and
. J6M.
* *-
Your booklet should be up to date with the above additions. Please contact Charlene Erthal at 366-2364 if you need up-todate copies of any other standards.
DUP 0905968
SC-DP-06485
Air Quality Subcommittee Minutes
2
October 7, 1980
NEW STANDARDS -
1. S8H (Proposed) - Respiratory Protection Fit Testing J. R. Martin
Replies to serial letter comments were issued August 18, 1980. No additional comments were received. A revised draft is in composition. It will be circulated to the subcommittee for final review and approval prior to issue.
L. T. Freeland reported the additional suggestions had been received from 0. T. Skretvedt and T. J. Nelson. After reviewing these suggestions with several members of the subcommittee, the following action was taken:
Paragraph 3.7.2 was revised to require a 5X safety factor when a single fit test is used.
Suggestions to provide masks from at least two vendors and to not allow adjustment of the mask during testing were not accepted.
_
The 5X safety factor will provide a 95 percent confidence level that protection will be adequate while the 10X safety factor suggested would provide a 99 percent con
fidence level. The 95 percent confidence level is consistent with S12T.
2. S7H (Proposed) - Chemical Protective Clothing (Safety & Fire
Protection Subcommittee responsibility - K. A. Chen, L. F. Perci"
Jl Mattson of Haskell Lab reported that the monograph on
glove protection will be issued by the end of October.
The report will include a description of the test procedure, a summary of available data, and guidance on application.
It was agreed that work on the standard should be expedited. Members of the Ad Hoc Committee on the standard are:
. -
J. W. Bowman D. E-. Speier L. F. Percival K. A. Chen N. W. Henry J. E. Wright A. R. Greening
^
3. S-G (Proposed) , - Microwave and Radio-Frequency Radiation Safety R. J. Dam
A revised draft dated 10/10/80, which incorporates comments on earlier drafts, was circulatectrto the subcommittee. The draft was approved for preparation in standard format pending resolution of questions on the exposure limits set by Haskell Lab.
R. J. Dam is to forward a revised copy to A. R. Greening for composition.
0905969 DUP
Air Quality Subcommittee Minutes
3
October 7, 1980
REVISED STANDARDS
4. S13T - Hardware for Workspace Sampling and Analytical Methods (12/78) - S. W. Dixon, L. T. Freeland
Pink sheet copies of S13T were circulated to the subcommittee. The standard will be released for issue on October 9, 1980, unless objections are received by that date.
5. S2T - Threshold Limit Values of Airborne Contaminants (1/80) A draft of S2T prepared by L. T. Freeland and J. R. Martin was reviewed and approved for composition. Before sub mitting to composition, A. R. Greening is to revise the Scope section into separate Scope and General sections and indicate in the General section how the various exposure limits are to be used. Greening is also to have the Z tables checked by the Legal Library to ensure that they are current.
Pink sheet copies will be circulated for final review prior to issue.
6. S11T - Priorities for Workspace Sampling for Exposure to Chemicals (8/79) - D. J. Calvo, S. W. Dixon
A revised draft of S11T is in composition. Pink sheet copies will be distributed for final review and approval prior to issue.
7. JIM - Measurement of Visible Emissions - R. W. Stowe
JIM was approved or"`rea f f irma t ion with a minor change to
Paragraph 2.6.
8. S12T - Strategy for Workspace SamDling for ExDOSure to Chemicals
(11/78) It was agreed that the table on return sampling requirements in Paragraph 6.4.1.5 is to be revised by K. A. Chen, S. W. Dixon, and R. L. Barnhart. A. R. Greening is to add the qualifica tions developed by J. R. Martin for S2T to the references in S12T. Greening is also to check with R. E. Wheeler to determine if his revisions have been completed.
9. 1981 WORK SCHEDULE
'
The following assignments for 1981 reviews were made:
J2M - R. A. Mead J8M - R. L. Barnhart
S'
'
Marked copies are due to A. R. Greening by December 31, 1980.
The following subjects were suggested for possible new standards to be developed:
A roadmap standard for complying with PSD regulations.
DUP 0905970
Air Quality Subcommittee Minutes
4
October 7, 1980
A standard on spill and leak protection.
A standard on preparation of MSDS (Material Safety Data Sheets).
A standard on communication of chemical hazards
information.
......................
- -----
A standard on food handling and sanitary facilities.
It was agreed that a meeting would be held at Haskell Lab in the spring with a 1/2-day business meeting and a 1/2-day tour.
10. S4T - Measurement and Control of Asbestos Dust Exposure L. F. Percival reported that there was confusion on the requirements for maintaining lists of personnel with exposure to asbestos in previous Du Pont jobs or off-plant prior to or during Du Pont employment. He will prepare a proposed revision.
ADJOURNMENT The meeting adjourned at 3:00 p.m.
NEXT MEETING The next meeting of the Air Quality Subcommittee was rescheduled for Thursday, January 22, 1980, at 8:30 a.m.
ARG:ce Atch
JT
DUP 0905971