Document K7xayVzVjLjbzNnEEZkggYbX
SHERWIN ASBESTOS AMBIENT AIR SAMPLES
DATE:
August 18, 1999
TO: Homer Cole
FROM:
Richard (Rick) Hicks
RE: Asbestos Ambient Air Samples Collected at Sherwin Plant - July 1999.
During the month of July there were forty-six (46) asbestos ambient area samples collected at the Sherwin Plant. The samples were collected and analyzed utilizing the NIOSH 7400 Analytical Method.
Asbestos ambient air samples are collected throughout the Sherwin Plant. Typically they are collected in the clean area adjacent to an asbestos abatement project. The project may be a full enclosure, glovebag, or other approved abatement method. The samples serve as a means to ensure the abatement method was conducted properly. The sample also serves as a means to collect data throughout the Plant and helps demonstrate that levels are well below the Occupational Exposure Limit.
Asbestos abatement jobs vary in the amount oftime in which may be needed for their completion. Sample results may appear elevated due to short run times and low volumes of air that were needed to complete an asbestos abatement job. The short duration of some removal projects effects the minimum detection limit of the analytical method and therefore the concentration may appear elevated. For those short projects the goal is to achieve a less than value "<" for the concentration.
One hundred percent (100%) of the samples that were taken were < 50% of the Reynolds Occupational Exposure Limits (OEL) of 0.1 tfcc. One Hundred (100%) of the samples analyzed were below the detection limits of the NIOSH 7400 Analytical Method. See the attached table for a summary ofthe information.
Ifyou have any question regarding this data please contact me at (512) 777-2574.
RMC080014010020885
UMC08001401002G886
/
<
t-
uw Vm
s
oi ** cws
s
Vue
o
cn _ M.
M \o l/*S
oo o
o
- *
' (N
oCO
O-
o V V V V V V v V V V V V V V V \ ' * '
a
Si
to cn On
vo
C3N
o O *o
un
vo
m3
o
3NO
cn 00
m
m
CMO. Tf
VO
mm rr
VO VO
mm
vO
o vo
m rr
cn
VO, o m
0 cn
vo VO, cn
vo. VO. m
-- *o,
ca H o.
1
35 6-v
<0 CN 90
3
CN m
o 00
VO oo
m cn 00
cn m 90
cn cn f**
iri
<r, On
CO 90
o
cn 90
S <N 90
VO 90
VO 90
cn
cn P^
CN
CN r-
o, (N cn
*o. <N cn
__; cn
C: m* mm mm
s>
o.~ |J
*5. E
CA
u uMi
CA . <s:
"3
*
|
3
aV 2*"
S <c J --=
as2
JS O s >4>
'I 4) * M
<oM MV
-fi VI
<
C4WO) < *2
M
CO eCJ im3
Q o wo *o*
CA C/3 CA CA
U 2
w
3
u ,}
o
CO a
CaO
tn
a
cn a
EsEE
3333
aaaa
M
Wo
5
4a
8
.as SEoco
LoU W*
'5 QQ %O'
f<u Sf C3/3 D
E
3
ocn
UrCO.i
(4
5 a o s CL. s
3
*u*
3 CO
u
3
f> 5 a O
ON
o u. co 'J 'wo
3 3
u
c0
o 5 a Lsu is) a
33
u
3
*
5 a o
E
L2i. Oc 2 CJ
3 3
aa w3 us o
c/s 3 3
U
8 a
' 3 ok.
a % O
m
a u3.
'S => wo
oou D
% om u L3u
9 a>
oc o3q>O>
o wV.
aW4>
o '5 03 ffi
c%n c%n
2
3
jo *c3 u
E
ii
W4)i '3 CQ
cn
s eM
cOtf e 3 o
E
vT
CN
TeOp TaOp -9aC -OoQ TcOb
m m m CQ m
oco
sco
MC
0Q
G
scfl
aoo
T(O3S
3 3O
a 3
o 3O
"E c c *m c 3 Z> 5 ZD
([} 8> a C.i ->
EEEEE
Jj
rr 3" 3" 3
CN (N CN CN IN
_o T355
wO "5 ffi
cn
_o v3s s wo
o
ffi
cn
o 3 c
o**
3 VS n
On
On
On
ON
On
ON
ON On
On
On
O'
ON
ON
O
o
O
4) On ON On ON ON ON ON On O' O'
"a.
On
O'
ON
O'
mm
mm
mm
mm
mm
mmt
mm
\
M
S -22 5 A cn NO NO NO
CN CN cn cn 3* 3* CN CN rn 00 00 oo 90 O'
CA A
p~ r- r^-
r*
p* r*
r- r-
P^ p^
_
u J3
oi
~2
-, &^
s<
08 g
_
3 CN o
p00 CN vo
On r-* CN vo
o
90 CN VO
o
m un
_
mm
m vn
m (N NTS
vn (N m vrs
CN u->
(N cn VO
cn
m
vo
CN rcn vo
VO cn vo
p-
*mo
vo
_
cn vo
<N m vO
v./no *o
nC 3 o
cn 9C cn *o.
3 9C cn o,
9C n 1
}
Cfl w
_J
z o a: => Xu mX r, u
Sample ID
Sample
(RM C Number) Date
15549
7/13/1999
15422
7/14/1999
15423
I 7/14/1999
15430
7/14/1999
15437
7/15/1999
O'
O'
O'
w
15399 15584 15591 15592 15447 15448 15457 15465 15473 | 15511 15530 15531 15538 15539 15626 1 15565 15572 15659 15652
<N
<N CN PM
90
r* 30
7/14/1999 7/14/1999 7/15/1999 7/15/1999 7/20/1999 7/20/1999 7/20/1999 7/21/1999 7/22/1999 7/22/1999 7/26/1999 7/26/1999 7/27/1999
1
7/28/1999 7/28/1999
Os
Os Os O'
O'
Os Os O'
O'
as Os O'
Location/Area
90's at Powerhouse 83 Boiler Doors & Ducts
83 Boiler Doors & Ducts .
82 Boiler Top Deck Door
#2 Boiler Door
#2 Boiler Door
85 Digester, 5-6 Train Bottoms-North & Middle Vessels
89 Evaporator
-83 Boiler Doors & Gaskets
-83 Boiler Doors & Gaskets
.
Fac. 26 82 Feed Pump Discharge Line
Fac. 26 82 Feed Pump Discharge Line
83 Boiler Doors, Door Gaskets & Hand Hole Plate Gskts 83 Boiler Doors, Door Gaskets & Hand Hole Plate Gskts
83 Boiler Doors, Door Gaskets & Hand Hole Plate Gskts
83 Boiler Plate Cutting
24 Lime Unloading Bldg.
! 24 Lime Unloading Bldg.
24 Lime Unloading Bldg.
24 Lime Unloading Bldg.
83 Boiler Piping
Fac. 42, 88 Evaporator
83 Boiler Doors/Inside Clean Room o f Decon Trailer
83 Boiler - Last Door
88 Evaporator
T?
OO
Start Time
1255 0907 0905 1350 1452 1456
0840 0920 0750 0755 1129 1130 0805
1257
0840 0820 0820 0805
1300 1420 0745
| 0160
WO CO
0011
\r.
**>
3ro
Stop Time
1510 1250 1433 1530 2230 2225 0940 1055 1330 1330 1500 1500 j 1440 1025 1400 1445 1440 1440 1300
1020
1400 1450
CO CO r^. * V* v' V \/ V V
ON PoM V v`
Concentration (f/cc) (TWA) <02 <01 <01
10 >
I0>
i i ! i
i
1 o v'
<02 <01
<01
<.01
<01
<03 <03 <01 I <01 <01
<02
]
J
|
KMC080014010020887