CATALYTIC CRACKING ICC!/GAS (GR) (GREY) (CONTINUED)
NPRU MDO Line
601135
SWS Skim oil Vessel
701469
HFT to CCU Tie-in
701959
SWS 1st Stage Bottoms Pump
702037
CCU Sample Stations
870367
Air Blower Inlet Piece
CL-9 Spent Riser Fix
CCU T/A Feed Nozzle Repair
CFH Charge Pump Failure Cat
DHT Recirculation
0735
Sour Water Pump P-4167 Replacement
1597
Antimony Injection
035465
CCU Feed Manifold RV's
702304
Straight Run Residue to CCU
702307
NCR Revisions
702457
DHT Tops to HDU-1 (Relates to AR & CCG See AR) 702463
CCU Catalyst Addition System
701930
CCU 4th Stage Reliability
1095/702256
CCU 02 Piping Revisions
0958/870368
CCU Surface Condenser Vacuum System
702366
CCU T-6204 Pipe Stress Reduction
702396
Cat Adder
Control Rooms Asbestos Abatement
Replace Emergency Generator @ CCG
1048
CCU Flare Purge
1529
CCG Freeze Protection
1650
V-620 Sour Water Sample
1703
LGO Sample PT Relocation
1753
CCU Cooler Box Demo
1905
DHT Compressor Suction Vibration
1928
EJ-2A Replacement
031124
E.B.T. ST. Vane Removal
055124
DHT Vacuum Drier Sep Revisions
701402
CCU Catalyst System Revisions - Phase III
701930
V--1357 Replacement @ FGT
702468
N.W. CCU Paving
702554
Wheel Chair Accessibility
702577
CCU C.W. Blow Down Improvement CCU Control Room Furniture
702686
. 702698
DHT Field Lab
702710
CCU Seal Oil System Reliability
702319
DATE
1989 1989 1989 1989 1989 1990 1990 1990 1990 1990 1990 1990 1990 1990 1990 1990 1990 1990 1990 1990 1990 1991 1991 1991 1991 1991 1991 1991 1991 1991 1991 1991 1991 1991 1991 1991 1991 1991 1991 1991 1992
* MORATORIUM FUELENGR.DOC - 00020
LAM 016122
12/15/92 DPMC-12893
FUELS PLANT ENGINEERING COMPLETED PROJECTS
DEPARTMENT/PROJECT TITLE
ECN/AFE W.O./ACCT. NO.
DISTILLING (PINK) (CONTINUED)
DU-1 Exchanger Bypasses DU-1 Platform Additions DU-1 Water Wash E-7424 Blinding Station Replacement of DU-2 A/C Units E-5124 A-C Retube North Switchgear A/C System DU-1 Naptha Off Spec Line Replacement LCR Split Draw CC Tops Reflux Pump S-339 Brine Oxidizer Revisions CV-188 A/B By Passes/DU-2 DU-2 Steam Trace Pitch Line Pressure Alarm-Secondary Crude Booster Pump Flame Arrestor Modifications DU-1 Secondary Overhead Revisions DU-1 Steam-Air Decoking Tie-ins DU-2 Crude Heater Isolation Valves Tertiary Crude Pump Revisions DU-1 Brine Cooler Replacement E-5008 DU-1 Phase Separator DU-2 Crude Column Pressure Control ~ Asbestos Cable Tray Cover Removal Secondary Crude Booster Seal Pot Removal DU-1 Emergency Evaculation Alarm System DU-1 Condensate Pump DU-1 XHGO Routing Flexibility CWT 12 Chromate Tank Containment Wall DU-2 Residue Stripper Tray (1-11) Replacement DU-2 Naphtha Splitter Reflux Dist. Revisions Tray 12 Spray Header Installation Tray #1 Flasher Replacement Tail Flange Replacement E-5200 A-H Hot Accumulator (V-5106) Removal From Structure Pipe Stress Reduction (LCR/ASTF Pumps) Crude Train Relief Relocation DU-2 Turnaround Desalter Repair (V5100/01) Repairs to 1# Vent Line System DU-1 1# Vent Jump Over to Flare DU-2 Deluge
701803 701815 701835 870228 870281
032906 052117 700943 701284 701565 701590 701962 701759 701801 701819 701842 755366 870331
1280 1357 052121 0601266 702179 702180 702363 702415
0884
052527 349593 360891 702119
DATE
1988 1988 1988 1988 1988 1989 1989 1989 1989 1989 1989 1989 1989 1989 1989 1989 1989 1989 1989 1990 1990 1990 1990 1990 1990 1990 1990 1990 1991 1991 1991 1991 1991 1991 1991 1991 1991 1991 1991 1991
/<r\
* MORATORIUM FUELENGR.DOC - 00027
LAM 016123
12/15/92 DPMC-12894
LAM 016121
D P M C 12892.1