Document K760o86bnQJxrLa9dbgwYZE6

1 FUELS PLANT ENGINEERING COMPLETED PROJECTS DEPARTMENT/PROJECT TITLE ECN/AFE W.O./ACCT. NO. CATALYTIC CRACKING ICC!/GAS (GR) (GREY) (CONTINUED) NPRU MDO Line 601135 SWS Skim oil Vessel 701469 HFT to CCU Tie-in 701959 SWS 1st Stage Bottoms Pump 702037 CCU Sample Stations 870367 Air Blower Inlet Piece CL-9 Spent Riser Fix CCU T/A Feed Nozzle Repair CFH Charge Pump Failure Cat DHT Recirculation 0735 Sour Water Pump P-4167 Replacement 1597 Antimony Injection 035465 CCU Feed Manifold RV's 702304 Straight Run Residue to CCU 702307 NCR Revisions 702457 DHT Tops to HDU-1 (Relates to AR & CCG See AR) 702463 CCU Catalyst Addition System 701930 CCU 4th Stage Reliability 1095/702256 CCU 02 Piping Revisions 0958/870368 CCU Surface Condenser Vacuum System 702366 CCU T-6204 Pipe Stress Reduction 702396 Cat Adder Control Rooms Asbestos Abatement Replace Emergency Generator @ CCG 1048 CCU Flare Purge 1529 CCG Freeze Protection 1650 V-620 Sour Water Sample 1703 LGO Sample PT Relocation 1753 CCU Cooler Box Demo 1905 DHT Compressor Suction Vibration 1928 EJ-2A Replacement 031124 E.B.T. ST. Vane Removal 055124 DHT Vacuum Drier Sep Revisions 701402 CCU Catalyst System Revisions - Phase III 701930 V--1357 Replacement @ FGT 702468 N.W. CCU Paving 702554 Wheel Chair Accessibility 702577 CCU C.W. Blow Down Improvement CCU Control Room Furniture 702686 . 702698 DHT Field Lab 702710 CCU Seal Oil System Reliability 702319 DATE 1989 1989 1989 1989 1989 1990 1990 1990 1990 1990 1990 1990 1990 1990 1990 1990 1990 1990 1990 1990 1990 1991 1991 1991 1991 1991 1991 1991 1991 1991 1991 1991 1991 1991 1991 1991 1991 1991 1991 1991 1992 * MORATORIUM FUELENGR.DOC - 00020 LAM 016122 12/15/92 DPMC-12893 FUELS PLANT ENGINEERING COMPLETED PROJECTS DEPARTMENT/PROJECT TITLE ECN/AFE W.O./ACCT. NO. DISTILLING (PINK) (CONTINUED) DU-1 Exchanger Bypasses DU-1 Platform Additions DU-1 Water Wash E-7424 Blinding Station Replacement of DU-2 A/C Units E-5124 A-C Retube North Switchgear A/C System DU-1 Naptha Off Spec Line Replacement LCR Split Draw CC Tops Reflux Pump S-339 Brine Oxidizer Revisions CV-188 A/B By Passes/DU-2 DU-2 Steam Trace Pitch Line Pressure Alarm-Secondary Crude Booster Pump Flame Arrestor Modifications DU-1 Secondary Overhead Revisions DU-1 Steam-Air Decoking Tie-ins DU-2 Crude Heater Isolation Valves Tertiary Crude Pump Revisions DU-1 Brine Cooler Replacement E-5008 DU-1 Phase Separator DU-2 Crude Column Pressure Control ~ Asbestos Cable Tray Cover Removal Secondary Crude Booster Seal Pot Removal DU-1 Emergency Evaculation Alarm System DU-1 Condensate Pump DU-1 XHGO Routing Flexibility CWT 12 Chromate Tank Containment Wall DU-2 Residue Stripper Tray (1-11) Replacement DU-2 Naphtha Splitter Reflux Dist. Revisions Tray 12 Spray Header Installation Tray #1 Flasher Replacement Tail Flange Replacement E-5200 A-H Hot Accumulator (V-5106) Removal From Structure Pipe Stress Reduction (LCR/ASTF Pumps) Crude Train Relief Relocation DU-2 Turnaround Desalter Repair (V5100/01) Repairs to 1# Vent Line System DU-1 1# Vent Jump Over to Flare DU-2 Deluge 701803 701815 701835 870228 870281 032906 052117 700943 701284 701565 701590 701962 701759 701801 701819 701842 755366 870331 1280 1357 052121 0601266 702179 702180 702363 702415 0884 052527 349593 360891 702119 DATE 1988 1988 1988 1988 1988 1989 1989 1989 1989 1989 1989 1989 1989 1989 1989 1989 1989 1989 1989 1990 1990 1990 1990 1990 1990 1990 1990 1990 1991 1991 1991 1991 1991 1991 1991 1991 1991 1991 1991 1991 /<r\ * MORATORIUM FUELENGR.DOC - 00027 LAM 016123 12/15/92 DPMC-12894 LAM 016121 D P M C 12892.1