Document K6zeBeEwgNyvoxjMzO5moGvRX

Hazardous Air Pollutants-Abestos August 1978 Air Re n Hazardous Air Pollutants-40 CFR 61 Asbestos Revised June 19,1978 S 61.20 ApplieaWIily. Included, provided * number of such op- v]slbie to the outside The provisions of this subpart are ap plicable to those sources specified In I 81.22. eratlons can be predicted to occur during a given period of time based on operating *p*rl<mce. (o) "Emergency renovation means a cept as provided in paragraph (f) of section, from any building or struc- ture In which the following operations aj-e conducted or directly from any of the 61.21 Definitions. renovation operation that results from a .. -- In the act. In subpart A of this part, or In this section as foUows: tated by non-routine failures of equip- `J* (a) "Asbestos" means actinollte, amo- m^)*iAdSS^ wetted" means suf- ^rovln*''tap' or oth" tex'tUe slte, anthophylllte, chrysotlle, crocldollte. tremollte. <b) "Asbestos material" means as bestos or any material containing as JSj84*0*' --------- ^------ ----v (3) The manufacture of fireproofing bestos. (c) "Particulate asbestos material" (q) Remoyinp;" means taking out I and insulating materials. friable asbestos materials used on arif (4) Tjhe manufacture of friction means finely divided particles of asbestos pipe, duct, boiler. tenlLreacior.iuf 'products. naterlal. bine, furnace, or structural member (5) The manufacture of paper, mill- (d) "Asbestos tailings" means any from any building structure, facility. board. and felt. solid waste product of asbestos mining or or Inspiration. ' -- (6) The manufacture of floor tile. milling operations which contains as L==<iT "if taking off fri (7) The manufacture of paints, coat bestos. able asbestos materials from any nine. ings, caulks, adhesives, sealants. <e> Outside air" means the air out- duct, boiler, tiyik. reactor. turbine. lur7 (8) The manufacture of plastics and side buildings and structures. nace. or strucfiiml rubber materials. if) "Visible emissions" means any (s) "Fabricating" means any process (9) The manufacture of chlorine. emissions which are visually detectable ing of a manufactured product contain (10) The manufacture of shotgun without the aid of Instruments and which ing commercial asbestos, with the ex shells. contain particulate asbestos material. ception of processing at temporary sites (11) The manufacture of asphalt con (g) "Asbestos mOl" meant any facility for the construction or restoration of crete. engaged In the conversion or any inter mediate step In the conversion of asbestoe an Into commercial asbestos. Outside storage of asbestos materials is not con- n ddered a part of such facility. (h) "Commercial asbestos" means any variety of asbestos which Is produced by extracting asbestos from asbestoe ore. (1) "Manufacturing" meant the com bining of commercial asbestos, or In the case of woven friction products the com bining of- textiles containing commercial asbestos, with any other material(a). In cluding commercial asbestos, and the processing of this combination into a product as specified in I 61.22<c>. <J) "Demolition" means the wrecking or taking out of any load-supporting structural member and any related re moving or shipping of friable asbestos materials. s * (k) "Friable asbestos material" means any material that contains more than 1 percent asbestos by weight and that can be crumbled, pulverised, or reduced to powder, when dry, by hand pressure. 1) "Control device asbestos waste" means any asbesto6-oontalnlng waste material that Is collected In a pollution control device.______________ ; (m) "Renovation" means the remov ing,or stripping of friable asbestos ma terials .used on 'arnr pipe," duct, boiler, tank^reactor,*. turbine, -.furnace,;, or - structural member. ' Operations ` In '.whlch^ load-supporting v structural buildings, structures, facilities or Instal (61. Demolition and rertoogfinn. The lations. <t) "Inactive waste disposal site" means any disposal site or portion thereof where additional asbestos-con taining waste material will not be depos ited and where the surface is not dis turbed by vehicular traffic. (u) "Active waste disposal site" means any disposal site other than an Inactive site. (v> "Roadways" means surfaces on which motor vehicles travel Including, but__n_ot limited to, highways, roads. requirements ~5I this paragraph shall apply to any owner or operator of a demolition or renovation operation who intends to demolish any Institu tional. commercial, or Industrial build ing (including apartment buildings having more than four dwelling units), structure, facility. Installation, or por tlon thereof which.contains any pipe duct, boiler, tank, reactor, turbine, fur nace, or structural member that Is cov ered or coated with triable asbestos materials, except as provided In para streets, parking areas, and driveways.-- <dKl> of this section; or who in (w) "Asbestos-containing waste mate rial" means any waste which contains commercial asbestos and Is generated by a source subject to the provisions of this subpart, Including asbestos mill tailings, control device asbestos waste, friable as bestos waste material, and bags or con tainers that previously contained com mercial asbestos, ___ ________ tends to renovate any Institutional commercial, or industrial building structure, facility, Installation, or por tion thereof where more than 80 meters (ca. 260 feet) of pipe covered or coated with friable asbestos materials are stripped or removed, or more than >15 square meters, (ca. 160 square feet) of friable asbestos materials used to (1) "structural member" means any cover or coat any duct, boiler, tank, re load-supporting member, such as beams actor, turbine, furnace, or structural and load-supporting walls; or any non- member are stripped or removed. ____ load-supporting member, such as ceilings ""(1) (i) The owner or operator of a and non-load-supporting walls. demolition operation is exempted from the requirements of this paragraph: 61.22 Emission standard. Provided, (A) The amount of friable (a) Asbestos mills; There shall be no asbestos materials In the building or visible emissions to the outside air from portion thereof to be demolished Is any asbestos mill except as provided In less than 80 meters (ca. 260 feet) used paragraph (f) of this section. Outside on pipes, and less than 15 square meters (ca. 160 square feet) used on xsf?2`zs&"" any duct, boiler, tank, reactor, turbine, ,0 excluded. -, _____* (n) "Planned renovation means a renovation operation, or a number 01 suchn operations., Imn wmhiuchu twhueo ao*muuouu*n*t. weaxrraec<fyaebsp)owjfRlaftoh0sarbdaewsstebtaoemysssptoo:orsTerahtdareeyilpisnourgosriasftasdIc.swiTnaphngyreoesohadfioebrnpopitoaeoasddsln--,i---gftuhrfaretnp,a,nhcoe(Wtd,ifi)orc(irtalt)set(itinori)unacnrrtueeoqrtmaiufileicrmtea. metimoenbnetsrs,ohafanlpdl a(rBbae) rm^^^Sed 'SritWn ^riv^pe^ tlo"of"be5tos U]1,tngf on ro!TJ^Vr- iPosirnarked or delivered to the Admin- removed or stripped withln Blven Perlod of time can be predicted. Operations ered with snow or ice is considered fBcll,K.' sur- llifslttrra.,tonrr aatt least 2200 ddaavyss Dprriloorr ttoo ,coomm-. that are individually non-scheduled are (C) Manufacturing There shall be no Imencement of demolition and shall In- Copyright 1978 by Environment Information Center, tnc. ---- BRG 0120 Air Reg 112 August 1978 Air Regulations elude the Information required by ~ (IT FrEBl^asbestoiTmaterials. -used ting requirements of this paragraph are paragraph (dX2) of this section, with on any pipe, duct, boiler,reactor, suspended when the temperature at the of the tnfonnatln required by paragraphs <dX2) (111), (vl). (vll), (vlll), and (lx) of this section, and shall state the measured or estimated amount of friable asbestos materials turbine, furnace, or structural member, shall be removed from any building, structure, facility or installa tion subject to this paragraph. Such removal shall occur before wrecking or point of wetting Is betow O'C (32'F). When friable asbestos materials are not wetted due to freezing temperatures, speh materials on pipes, ducts, boilers, tanks, reactois, turbines, furnaces, or structural which Is present. Techniques of esti- dismantling of any portion of such matlon shall be explained. building, structure, facility, or Installa "" (2) Written notice of intention to de tion that would break up the friable molish or renovate shall be provided to asbestos materials and before wreck the Administrator by the owner or opera ing or dismantling of any other por tor of the demolition or renovation oper tion of such building, structure, facili ation. Such notice shall be postmarked ty, or installation, that would preclude or delivered to the Administrator at least access to such materials for subse days prior to commencement of demo*' quent removal. Removal of friable as lltlon. or as early as possible prior to4 bestos materials used on any pipe, commencement of emergency demolition duct, or structural member which are subject to paragraph (d> (6) of this sec encased In concrete or other similar tion. and as early as possible prior to structural material is not required commencement of renovation. Such no prior to demolition, but such materials tice shall Include the following Informa shall be adequately wetted whenever tion: exposed during demolition. (I) Name of owner or operator. (11) Friable asbestos materials used <ll). Address of owner or operator. on pipes, ducts, boilers, tanks, reac (ill) Description of the building, tors, turbines, furnaces, or structural structure, facility, or installation to be members shall be adequately wetted demolished or renovated, including during stripping, except as provided In the size, age, and prior use of the paragraphs (d)(4)(iv), (d)(4)(vl), or members shall, to Uic maximum extent possible, be removed as units or In sec tions prior to wrecking. In no case shall the requirements of paragraph (d) (4) (Iv) or (d)(4)(v) be suspended due to freezing temperatures. (vll) For renovation operations. local exhaust ventilation and collection sys tems may be used. Instead of wetting as specified in paragraph (d> (4) (11). to pre vent emissions or particulate asbestos material to outside air when damage to equipment resulting from the wetting would be unavoidable. Upon request and supply of adequate information, the Ad ministrator will determine whether dam age to equipment resulting from wetting to comply with the provisions of this par agraph would be unavoidable. Such local exhaust ventilation systems shall be de signed and operated to capture the asbes tos particulate matter produced by the stripping and removal of friable asbestos structure, and the approximate (dXvli) of this section. material. There shall be no visible emis amount of friable asbestos materials (Iii) Pipes, ducts, boilers, tanks, reac sions to the outside air from such local present. tors, turbines, furnaces, or structural exhaust ventilation and collection sys (Iv) Address or location of the build members that are covered or coated tems, except as provided In paragraph ing, structure, facility, or installation. with friable asbestos materials may be (f) of this section. (v) Scheduled starting and comple taken out of any building, structure, (5> Sources subject to this paragraph tion dates of demolition or renovation. facility, or Installation subject to this are exempt from the requirements of (vl) Nature or planned demolition or paragraph as units or in sections pro- 5} 61.05(a), 61.07. and 61.09. renovation and method-(s) to be em vided the friable asbestos materials ex (6) The demolition ol a building, struc ployed. posed during cutting or disjoining are ture. facility, or installation, pursuant to (vll) Procedures to be employed to adequately wetted during the cutting an order of an authorized representative meet the requirements of tills paragraph or disjoining operation. Such units of a State or local governmental agency. and paragraph (J> of this section. shall not be dropped or thrown to the Issued because that building Is structur (rill) The name and address or loca ground, but shall be carefully lowered ally unsound and In danger of Imminent tion or the waste disposal site where the to ground level. collapse is exempt from all but the fol friable asbestos waste will be deposited. (Iv) The stripping of friable asbestos lowing requirements of paragraph (d> ol (lx) Name, title, and authority of the materials used on any pipe, duct. this section: State or local governmental representa boiler, tank, reactor, turbine, furnace, (i) The notification requirements spec tive who has ordered a demolition which or structural member that has been ified by paragraph <d) (2) of this section; Is subject to paragraph (d)(8) of this removed as a unit or in sections as pro lii) The requirements on stripping of section. vided In paragraph (d)(4)(iil) of this friable asbestos materials from previously (3) (I) FOr purposes of determining section shall be performed in accord removed units or sections as specified in whether a planned renovating operation ance with paragraph (d)(4)(H) of this paragraph (d)(4)<iv) of this section; constitutes a renovation within the section. Rather than comply with the (iii) The wetting, as specified by para meaning of this paragraph, the amount wetting requirement, a local exhaust graph rd>(4i(v) of this section, of fri of friable asbestos material to be re moved or stripped shall be: (A) For planned renovating opera tion involving Individually non-sched- uled operations, the additive amount of friable asbestos material that can be pre dicted will be removed or stripped at a source over the maximum period of time for which a prediction can be made. The period shall be not-less than 30 days and not longer than one year. (B) For each planned renovating op eration not covered by paragraph (d) (3) (1) (A); the total amount of friable asbestos material that can be predicted will be removed or stripped at a source. (11) For purposes ol determining ventilation and collection system may be used to prevent emissions to the outside air. Such local exhaust ventila tion systems shall be designed and op erated to capture the asbestos particu late matter produced by the stripping, of friable asbestos materials. There shall be no visible emissions to the outside air from such local exhaust ventilation and collection systems except as provided in paragraph (f) of this section. ___ (v) All friable asbestos materials that j,ave been removed or stripped shall be adequately wetted to ensure that such materials remain wet during all remain ing stages of demolition or renovation able asbestos materials that have been removed or stripped; (iv) The portion of the structure being demolished that contains friable asbes tos materials shall be adequately wetted during the wrecking operation. (e) Spraying. There" shall be no visi ble emissions to the outside air from the spray-on application of materials containing more than 1 percent asbes tos, on a dry weight basis, used on equipment and machinery, except as provided in paragraph (f) of this sec tion. Materials sprayed on buildings, structures, structural members, pipes, and conduits shall contain less than 1 percent asbestos on_a dry weight basis. whether an emergency renovating op eration constitutes a renovation within and related handling operations. Such materials shall not be dropped or thrown (1) Sources subject to this paragrapn are exempt from the requirements of the meaning of this paragraph, the to the ground or a lower floor. Such ma 5 61.05(a). { 61.07, and ! 61.09. amount of friable asbestos material to terials that have been removed or be removed or stripped shall be the total stripped more than 50 feet above amount of friable asbestos material that groun(j level, except those materials re- will be removed or stripped as a result movwj as units or In sections, shall be of the sudden, unexpected event that tran-pnrled to the ground via dust-tight necessitated the renovation. chutes or containers. (4) The following procedures shall be used to prevent emissions of particulate asbestos material to outside air: (vli Except as specified below, the wetEnvironment R.gulatlon Handbook /^N BRG 0121 Hazardous Air Pollutants-Asbestos August 1978 Air Reg 112-1 shall Include the following Informa tion: * (3) The spray-on application of ma date of these regulations, shall contain graph (J), the term all asbestos-con- terials In which the asbestos fibers are no commercial asbestos. The provisions talnlng waste material as applied to encapsulated with a bituminous or re sinous binder during spraying and of this paragraph do not apply to lnsu- demolition and renovation operations latlng materials which are spray applied; covered by paragraph (d) of this sec- which are not friable after drying is exempted from the requirements of paragraphs (e) and (e)(2) of this sec tion. (Ii Itatlier than mcei the no-visibleemission requirements as specified by paragraphs (a), (c). <d>, (c>. (h>, (J), and ik) of this section, an owner or op erator may elect to use the methods spec ified by ! 61.23 to clean emissions con taining particulate asbestos material be fore such emissions escape to. or are vented to. the outside air. euch materials are regulated under tion Includes only friable asbestos waste 9 61.22(e). and control device asbestos waste. (J) Waste disposal for manufacturing. (k> Waste disposal for asbestos mills; fabricating, demolition, renovation and The owner or operator of any source spraying operations: The owner or op- covered under the provisions of para- erator of any source covered under the graph (a) of this section shall meet the provisions of paragraphs (c), (d), (e), following standard: or (h) of this section shall meet the fol- . (l) There shall be no visible emls- lowlngstandards: slons to the outside air, except as pro- CD There shall be no visible emissions vided in paragraph (k) (3) of this section, to the outside air, except as provided in during the collection, processing, pack- paragraph (J) (3) of this section, dur- aging, transporting or deposition of lng the collection; processing, including any asbestos-containing waste mate- incineration; packaging; transporting; rial which is generated by such source, (g) Where the presence of uncombined or deposition of any asbestos-containing (2) All asbestoa-oontalnlhg waste ma- water is the sole reason for failure to waste material which is generated by terial shall be deposited ' at waste meet the no-visible-emlsslon require Kiifh-Kniircp| -- -- . rtl-pn-nl sites which are operated in ac- ment of paragraphs (a), (c), (d), (e), (2) All asbestos-containing waste ma-Vordance with the provisions of 9 61.26. (h), (]), or (k) of this section, such f&Q- J terial shall be deposited at waste dls-I (3) Rather than meet the requirement ure shall not be a violation of such emis posal sites which are operated in accord- lot paragraph (k> (1) of this section,- an sion requirements. | ance with the provisions at j| gliijj} m or operator may elect to meet (h) Fabricating: There shall be no "*3"Hather than meet the requirement the following requirements in para- visible emissions to the outside air, ex of paragraph (J) (1) of this section, an graphs (ID (3) (1) and (11), or use ah cept as provided In paragraph (f) of this owner or operator may elect to use alternative disposal method which has section, from any of the following, op either of the disposal methods specified received prior approval by the Admin- erations If they use commercial asbestos under (J)(3)(i) and (11) of this section, lstrator: or from any building or structure in or an alternative disposal method which (1) There shall be no visible emissions which such operations are conducted. has received prior approval by the Ad- to the outside air from the transfer of (X) The fabrication of cement building mlnlstrator: control device asbestos waste to the products. (i) Treatment of asbestos-containing tailings conveyor, except as provided in (2) The fabrication of friction prod waste material with water; paragraph (f) of this section. Such waste ucts, except those operations that pri (A) Control device asbestos waste shall shall be subsequently processed either marily install asbestos friction materials be thoroughly mixed with water into a as specified in paragraph (k) (3) (11) of on motor vehicles. slurry and other asbestos-containing this section or as specified in paragraph (3) The fabrication of cement or sili waste material shall be adequately (j>(3) of this section, cate board for ventilation hoods; ovens; wetted. There shall be no visible emls- (li) All asbestos-containing waste electrical panels; laboratory furniture; slons to the outside air from the collec- material shall be adequately mixed, with bulkheads, partitions and ceilings for tion, mixing and wetting operations, ex- a wetting agent recommended by the marine construction; and flow control cept as provided in paragraph (1) of this manufacturer of the agent to effectively devices for the molten metal Industry. section.' wet dust and tailings, prior to deposition (1) Insulating: Molded Insulating ma terials which are friable and wet-applied Insulating materials which are friable after drying, installed after the effective (Secs. 112 and 301(a) of the Clean Air Act as amended (42 U.S.C. 7412. 7601(b).)) [FR Doc. 78-16891 Filed 6-16-78:8:45 am] (B) After wetting, all asbestos-con at a waste disposal site. Such agent shall taining waste material shall be sealed be used as recommended for the partic Into leak-tight containers while wet, and ular dust by the manufacturer of the such containers shall be deposited at agent. There shall be no discharge of waste disposal sites which are operated visible emissions to the outside air from in accordance with the provisions of the wetting operation except as specified 9 61.25. in paragraph (f) of this section. Wetting (C) The containers specified under may be suspended when the ambient paragraph (j) (3) (1) (B) of this section temperature at the waste disposal site Is shall be labeled with a warning label less than --9-6`C (ca. l$*F). The ambient that states: air temperature shall be determined by CAUTION an appropriate measurement method Contains Asbestos Avoid Opening or Breaking Container Breathing Aabestoa Is Bscardous to Tour Health with an accuracy of 1'C (i2T) and recorded at least at hourly Intervals dur ing the period that the operation iff the wetting system Is suspended. Records of Alternatively, warning labels specified by Occupational Safety, and Health Standards of the Department of Labor, Occupational Safety and Health Admin istration (OSHA) under 29 CFR 1910.- 93a(g) (2) (U) may be used. (il) Processing of asbestos-containing waste material Into non-frlable forms; (A) All asbestos-containing waste material shall be formed Into non-fliable such temperature measurements shall be retained at the source for a minimum of two years and made available for Inspec tion by the Administrator. (1) The owner of any inactive waste disposal site, which was operated by sources covered under 9 61.22 (a), (c) or (h) and where asbestos-containing waste material produced by such sources was deposited, shall meet the following pellets or other shapes and deposited at waste disposal sites which are operated In accordance with the provisions of 9 6155. (B) There shall be no visible emis standards; (1) There shall be no visible emissions to the outside air from an Inactive waste disposal site subject to this paragraph, except as provided in paragraph (1) (5) sions to the outside air from the collec of this section. tion and processing of asbestos- (2) Warning signs shall be displayed containing waste material, except as at all entrances, and along the property specified In paragraph (f) of this section. line of the site or along the perimeter of (4) For the purposes of this para- the sections of the site where asbestos- Copyright 1978 by Environment Information Center, Inc. BRG 0122 Air Reg 112-2 August 1978 Air Regulations containing wwte material waa deposited, 61,23 Air-CIcaning. (e) Such information shall accom at intervals of 100 m (ca. 330 ft) or less, except as specified in paragraph (1)(4) of this section. Signs shall be posted In such a manna: afid location that a person max easily read the legend. The warning signs required by this paragraph shall conform to the requirements of 30" x 14" upright format signs specified In 20 CFR 1910.145(d)(4) and this paragraph. Hie signs shall display the following legend In the lower panel, with letter sizes and styles of a visibility at least equal to those specified In this paragraph. If alr-cleanlng Is elected, as permitted by 5161.22(f) and 61.22(d)(4) v>, the requirements of this section must be met. (a) Fabric filter collection devices must be used, except as noted In para graphs (b) and (c> of this section. Such devices must be operated at a pressure drop of no more than 4 inches water gage, as measured across the filter fabric. The airflow permeability, as determined by AJBTM method D737-69, must not exceed 30 ft'/mln/ft* for woven, fabrics or 35 ft'/mln/ft* for felted fabrics, except that pany the information required by { 61.10. The information described in this section shall be reported using the format of Appendix A of this part. (i 1.2.7 Waste disposal sites. In order to be an acceptable site for disposal of asbestos-containing waste material under 5 61.22 (J) and Ik), an active waste disposal site shall meet the requirements of this section. (a) There shall be no visible emissions to the outside air from any active waste disposal site where asbestos-containing uaim 40 ft'/mln/ft* for woven and 45 ft*/ waste material has been deposited, except Asassios Waste Disposal Ski Do Not Crests Dust mtn/ft* for felted fabrics is allowed for as provided In paragraph (e) of this filtering air from asbestos ore dryers. section. - Each square yard of felted fabric must (bi warning signs shall be displayed Bretthing Aabsstas Is Hazardous to Tour Health weigh at least 14 ounces and be at least at all entrances, and along the property one-sixteenth inch thick throughout. line of the site or along the perimeter of Notation 1" Sans Serif, Gothic or Block Synthetic labrlcs must not contain fill tlie sections of the site where asbestos- yam other than that which Is spun. containing waste material is deposited, (b) If the use of fabric filters creates at intervals of 100 m (ca. 330 ft) or less K" Sans Serif, OotSilc or Block a fire or explosion hazard, the admlnls- except as specified in paragraph (d) of 14 Point Gothic trator may authorize the use of wet col- jlthls section. Signs shall be posted in such lectors designed to operate with a unit la manner and location that a person may Spacing between lines shall be at least contacting energy of at least 40 inches leasily read the legend. Tlie warning equal to the height of the upper of the water gage pressure. signs required by tills paragraph shall two lines. (c) The administrator may authorize :onfonn to Utc requirements of 20" x 14" (3) The perimeter of the site shall be the use of filtering equipment other than upright format signs specified In 29 CFR fenced In a manner adequate to deter that described In paragraphs (a) and (b> 1910.145(d) (4) and this paragraph. The access by the general public, except as of this section If the owner or operator signs shall display the following legem! specified In paragraph (1X4) of this demonstrates to the satisfaction of the in the lower panel, with letter sizes ami section. administrator that the filtering of par styles of a visibility at least equal to (4) Warning signs and fencing are not ticulate asbestos material is equivalent Ihose specified in this paragraph. required where the requirements of to that of the described equipment. paragraphs (1) (5) (1) or (U) of this sec (d) All alr-cleanlng equipment au tion are met, or where a natural barrier thorized by this section must be properly Asbestos Waste Disposal Site adequately deters access by the general Installed, used, operated, and maintained. DO Not Create Dust public. Upon request ana supply of ap Bypass devices may be used only during Breathing Asbestos propriate information, the Adminis upset or emergency conditions and then Is Hazardous to Your Health trator will determine whether a fence or only for so long as it takes to shut down a natural barrier adequately deters ac the operation generating the particulate Notation cess to the genera] public. asbestos material. 1" Sans Serif, Gothic or Block (5) Bather than meet the requirement of paragraph (1X1) of Oils section, an Lowner may elect to meet the require ments of this paragraph or may use an alternative control method for emissions from inactive waste disposal sites which lias received prior approval by the Administrator. (I) The asbestos-containing waste material shall be covered with at least 15 centimeters (ca. 6 Inches) of com pacted non-asbestos-contalning mate rial. and a cover of vegetation shall be grown and maintained on the area ade quate to prevent exposure of the asbes tos-containing waste material: or (II) The asbestos-containing waste material shall be covered with at least CO centimeters (ca. 2 feet) of compacted non-asbcslos-containing material and maintained to prevent exposure of the S 61.24 Reporting. (a) A description of the emission con trol equipment used for each process; (b) If a fabric filter device Is used to control emissions, the pressure drop across the fabric filter in inches water gage. (1> fab,ri!C device utilizes a woven fabric, the airflow permeability In ft'/mln/ft'; and. if the fabric is syn thetic, indicate whether the fill yarn is spun or not spun. (2) If the fabric filter device utilizes a felted fabric, the density in oz/yd', the minimum thickness In inches, and the airflow permeability In ft'/mln/ft*. (c) For sources subject to 55 61.22(j) and 61.22(k>: (1) A brief description of each process that generates asbestos-containing waste material. Sans Serif, Gothic or Block 14 Point Gothic Spacing between lines shall be at least equal to the height of the upper of the two lines. (c) The perimeter of the disposal site shall be fenced In order to adequately jjeter access to the general public except as specified Iinn p,,narraagmraBpnhh r(dn)i noff tthhiiss section. (d) Warning signs and fencing are not rcauIreH where the requirements^ paragraph (oil) of this section are lhct.`iir where a natural barrier adejT ftuatcly fitters Acress in tlie general jiutlim. Upon request and supply oi an TTFotfilMe Information, the Administra tor will determine whether a fence or a natural barrier adequately deters access to the general public, u asbestos-containing waste; or (Hi) For Inactive waste disposal sites lor asbestos tailings, a resinous or petro leum-based dust suppression agent which effectively binds dust and controls wind erosion shall be applied. Such aecnt shall be used as recommended for the partic ular asbestos tailings by the (lust sup pression agent manufacturer. Other (2) The average weight of asbestoscontaining waste material disposed of, measured In kg/day. (3) The emission control methods used In all stages of waste disposal. ' (4) The type of disposal site or incin eration site used for ultimate disposal, the name of the site operator, and the name and location of the disposal site. (e> Rather than meet the require ment of paragraph (a) of this section, an owner or operator may elect to meet the requirements of paragraph (e)(1) or (e) <?' of this section, or may use an al ternative control method for emissions fipm active waste disposal sites which has received prior approval by the Administrator. equally effective dust suppression agents (d) For sources subject to 5 61.22(1): (1) At the end of each operating day. may be used upon prior approval by the (1) A brief description of the site. or at least once every 24-hour period Administrator. For purposes of this para (2) The method or methods used to while the site Is In continuous operation, graph. waste crankcase oil Is not con comply with the standard, or alternative the asbestos-containing waste material sidered a dust suppression agent. procedures to be used. which was deposited at the site (luting Emrlronmenl Regulation Handbook BRG 0123 T INTERNAL CORRESPONDENCE UNION CARBIDE CORPORATION CHEMICALS AND PLASTICS p. o. box 3370, brownsville, texas 78520 To (Name) /Mr. K. G. Townsend Company Location Copy to Mr. B. F. Brown Mr. R. C. Glock ate September 27, 1978 Originating Dept. Answering fetter date Subject Asbestos: Hazardous Air Pollutant Dear Gran: Attached is the revised asbestos regulation issued in August. Note that renovation or demolition of more than 80 meters of pipe covering or 15 square meters of asbestos covering boiler or reactors require notification of the EPA Regional Administrator 10 days prior to commencement of removal. Since location of asbestos disposal is also required by the Administrator, I would suggest we develop the following procedure: 1. Identify locations of asbestos in the plant. (Lab has a new microscope). 2. Properly bag and dispose of asbestos on-site in our ball mill pit. 3. Treat other insulations used in the plant like asbestos but continue to dispose of off-site. 4. Write up appropriate maintenance procedure for removal notification and disposal. 5. Write up brief S&P procedure which refers to detailed maintenance procedure. BRG 0118 Mr. K. G. Townsend -2 - September 27, 1978 6. Review purchasing control procedure to ensure that no asbestos insulation is being purchased. - 7. Review, and possibly include, control of disposal of gaskets. Let me know if you have any questions. Very truly yours. LTW/gr Attachment L. T. Windel BRG 0119