VEITTIATION REPORT FOR 1963
_
ventilation
During the year 1963 the following alterations veru made to the
ventilation set up at Colonial Nine The 60 A.P. Richardson frm situated
at 54 South Rise and which was acting as an intake fan was turned around
to act as an exhaust fan In conjunction with this the No. 3 Adit van
blocked off West of 5 level 6 Dr. South was blocked off North of the
68 South manway and the No. 4 Adit was blocked off west of 6 loval
The aim was to draw air down the main Adit and into the 5 6 7 and 8 levels via the service rises connecting thoce levels with the main adit
and thon distributed from the levels into the stores and drawn back by the exhaust fans and domicasted through 41 South 42 South 60 South
611 South 612 south and 613 South manways into exhaust channels 4 Dr.
South and 54 South Rise
satisfactory After a trial run this did not prove very
Theoretically it should have been all right but in practice it didn't
A complete survey of the mine was then carried out and the
following facts were found
The fan at 42 South was exhausting fresh air picked up through the fall and from lezks in the 1 2 and 3 levels Also much dust was being generated in the main edit due to the velocity of air coning through
To counteract these a programme of bratticing and door construotic vas commenced and the following work was carried out
.
All manway and chutes veru bratticed off on the No. and
2
fratrilled No. levels doors
fratrilled North of the grisely positions the
was service riseosn those two levels were uncovered air
allowed to
drawn from the south openings of these levels and entered the Kain Adit
via the servico rises This had an adventa oouseffect on the dust sanc
previously mentioned
ee
--"
ees :
millock millock The lo 7 service rise which was being usod so a
pass was
then opened up and slao No. 5 was out back alightly to control the amount
of sir entering the No. 5 level Thin ensured that air would be in down
to the furthest point of workings
.
Another To stop leakago and also make use of air entering through fall
estimated 50,000 cfm the brattice along 4 level upjor seam vas reconstruc
and the opening from 43 South stope into oliff wall was sealed off trattice was built along the 4 level lower sean stoped on the sant side and the manway and chutes of 41 and 42 south were bratticed off over the
upper sezm The samo
68 as also 65 South and
South
was adopted in 50 518 523
This meant that the exhaust
would then serve the lower scene in 5 level and 6 lavol and
* .1 an independent circuit
and 53 South fan at 42 South
be more or less
ote
sys
sommes
ew eee ce emmn ; niee
To isolate the other exhaust fan air doors were then irate t^,d
in 3 Adit Went of 5 levol also East of 5 level 6 Ir South North of
the No. 4 ^dit3 ^ditmost of 6 level and 7 Dr. South Just north of
75 South This had the desired effect and exhaust air was doumonsted
,
through with 76S 778 and 785 mamrays as also along 5 Adit connecting
South fan at 54 South to theintosurfathce ereturn airway of No. 4 A^A^ ititand via exhaust
: oo
advantago The Isakago of 50,000 cfm through fall was used to test
to ventilatu stores 778 and 785 alco longwall exparizontal stove and
6 Dr. South
stove
.
enteringto workings from following auxiliary amounts 73,000 At present amount of effective air
approximately 22,000 c"wmhile the exhaust 4 level exhaust fan and 71,000 ofm from 5 level to there two exhaust fine the
wine workings
exhaust fan In addition
fane being employad~--
I
PLAINTIFF'S EXHIBIT
105030 105030
come
srry
Pret
+
mobane sncahse
toe
al
oem
'
5 ane
+
an
fi ,
.
:
18 Kech E 4" 2 Hec EP o Richardson *
'
7 Richardson 2p*
4 Richardson
3 Richardson 3
2 Richardson 4 SD
Giving a total of 36 auxiliary fans
2oR
.
To cool the air entering the rins and also to l v cust generat^>^by cnveyor belt and movement along w^/ins^/it air and water syr~-yavere installed installed at 100 intervals along the main s^ it
Tuture development programe which will aid the ventilation
is the cutting of a barrier pillar from north to south betwem the 7 and
levels This will enable the air to be circulated to better advantage in the lower levels The connection of the Hain Adit with No. 9 level vill solve a problem which exists at present on this levol Also the desirability of a shaft in the North end of the mine to be used for exhaust purposes is being given much consideration
The ventilating of the workings North of the main edit is
presenting more and more of a probleImn the No. 6 level this kua been
partially overcome by placing a booster fan on the No. 6 vica rise
blowing Borth A similar situation exists in the No. 7 lonel and a fen
situation is being installed there to alternate the situation
Dust control is still a major problem due mainly to the .
nature of the operation and although agways have been installed in all
ore pacsos and chutes and watering down of dry ore being enforced
om, before seroping operations commence the problem still exista
anecaeee AttachAtaechedd recentplan showing
brattices prinary
airways doorn sec ndaryand exhaust
as also air flows
A. MULHOLLAND
* .
es
ne
we
Mh
itlte
ee.
r
8th January 1964 4
et:
ee
Bs
se
o-
. .o .
3
-
6
: -
.
.
e
-
ay oe}
.
3. :
7
rr
ae
er
FMR
ae,
4
.
wees)
a
8 4 Oe IEE mmm
mee
+ etme Meeh tH?
a