Document K6LKJ8m9BJGOq7vZ68mNQxQZw

PLAINTIFF'S EXHIBIT CHR-178 Ptnoootl Manager Chemical Industrial Hygiene Personnel .00 Industrial Hygiene Investigation Nov. II, 1969 Trsnton Jbsaical Highland Park Tha disc brake operations located la tbs Friction Materials Building war* obaarrad by Mr. D. A. Padden, Intarnatlnnal U.A.W. industrial hygienist, on Novembar 7, 1969. At tba conclusion of tba work anvirontaanc invastigation tbs following items wars reviawad during a toasting of management and union rapraaantatlvas. 1. Dust Collector. Asbastoa dust falls fro* tba cleanout door, located above the work area, when tba screw conveyor becomes plugged and cleaning *.1 required. Infor mation obtained from a representative of tbe Engineering Department indicates that lapcovenant of existing equip ment is planned. We ware informed that a decrease la tbe speed of material transferring from the collector to the conveyor is contemplated in an effort to balance tbe system. 2. pm--*1 *111 Balcony. Claamp of floor with a equeegy rather tban a broom, as performed during tbe plant visit was considered to be satisfactory. 3. Lead Control Troaram. Tbe blood lead program was re viewed and waa considered to be satisfactory. ce: A. Atkinson u. p. Bavlnger R. F. Bowers F. E. Replied N. A. Trombley D. L. Zscbelbach, Chief Industrial Hygiene Department TO NAME D. L. Eschelbach r*OM . namC T. J. Lang SR COMPANY CORRESPONDENCE oc*t Industrial Hygiene DCPT 1 Personnel Manager F'LC ' DIVISION CODE Personnel DIVISION Chemical Januarvl3, *L*NT/OFr*CC Highland Park plant ornct ! Trenton 1970 Periodic Industrial Hygiene Survey The periodic industrial hygiene survey conducted in the Chemical Products and Friction Materials operations at Trenton on October 19, 1970, showed that low levels of illumination were recorded at several locations in the plant. We have been upgrading the illumination throughout the plant on a general basis and will continue this pro gram to improve the lighting at the Baker-Perkins, Bramley mixer, Adamson rubber mill and in the pilot plant, in Chemical Products, as well as along the loading line in Bay B-6 at Friction Materials. The control of the excessive noise levels at the cutter tables and the brake lining grinder, in the Friction Materials plant, has not been accomplished, however, acoustical ear muffs have been pro vided for employees working nearby to wear until the noise level, created at these operations, can be reduced to an acceptable level. As you suggested, we have cautioned the employees who weigh them. W. F. Bavinger R. F. Bowers M. F. Bruton W. T. Diehl S. C. Enders J. L. Gulish W. L. Knapp E. R. Lombard R. D. McIntosh F. E. Repucci N. A. Trombley 4 MO- 7|7 REV. 1-41