Document K68wd4RBe9Ve7dqywx0MNJGRx

La*s Name TiJSBl'iE: SERVIOi REPORT SUMHAR'i- OUST1' ^: QTCLtHCg-1- i rOT.Tftr;^______ ____ 00sration 8/2?A9 to c/iA? .E. Frisa Time spent mostly i in^re'0n'u" ipment in the building. Fart of the equipment had to be built outside. 19-2-49 ;, . ,E. Frisa to 19-1349 19-1549 J. Weightmai and 19-1649- Cover initial start-up problems in regard, to setting in unit; equipment poorly!protected from the weather, . No gasket exhaust end to condenser furnished.by Condenser Servici Co. Confirm hanging condenser to exhaust end unsupported. Checked terminal points in piping specifications. Only major discrepancy appeared in extraction line tenaina]rint given as: non-return valve. I9-19-U9 to 19-2349 J. Weightman Installs d wobble plate on "C" turbine which had been damaged in shipment. After using hammer was necessary to remove 1/32 from top flange to make it smooth and true. Drilled holes in pedestal. Drilled three holes through oil tank pedestal for ranging cooler.i Fabricated rods aid hanger assemblies for coolers on.all three units. Exhaust end feed and drain piping replaced securely. Replaced shim pads.under generator soleplate. which' had been knocked loose. [ 9-2949 to 19-3049 J, Weightman Drilled holes for hanging oil cooler. 10-3-49 J. Weightman I10-6-U9 and 110-749 Stuart Get? io-1149 Stuart Getz to Leonard Bero 10-1449 Assembled inist .elbows.on "A" unit and throttle valve. Leveling and aligning soleplates. I' l forking on oil piping and outboard pedestal baseplate.. Foundation not Wide enough. Having trouble getting baseplates in position. When foundation was poured a lot of the sloppy concrete got into sleeves for holding down bolts which were off center. Spent time leveling- turbine. Leveling and aligning soleplate for Ho. 1 exciter. Necessary to reset two chock blocks. 10-1749 Stuart Getz Finished setting outboard and exciter baseplate on elevation and center line. Started leveling turbine. Leveling pads are at various1 elevations having to use 690" on one side against 100" on other. Holding down bolts will have to be heated and bent before I can get on center line. 10-1849 Stuart Getz Finished leveling the turbine. Set generator baseplates after chipping concrete out of bolt sleeves, then set outboard pedestal and exciter baseplate. Willhave to heat bolts to put plate on center line. 110-1949 to 110-2149 Stuart Getz EXHIBIT bT Ib-'i s-oi f^aclut Had. to heat foundation bolts and bend them to get plate on line Short a lot of 3A" bolts and nuts for oil piping. Finished setting and lining up extraction regulators. ET-000110