Document K67Yq7gy7dKKqMGroBLabGjYK

PLAINTIFF'S EXHIBIT INTERNAL CORRESPONDENCE r* UNION CARBIDE CORPORATION technical center PO. BOX B361. SOUTH CHARLESTON. WV 25303 To,NmTl. E. Rucker cw,M.,n 512/2009 Cow" 8. H. Avashia, M.O. - 512/23 J. W. Barna - 2009/6 W. L. Browning - 2009 C. P. Maxwell - 701/2 B. R. McMakin - 2009 F. R. Sunderland - 2009 Oac-e April 27, 1987 EM&TSOriymt*rg Dept,. - HS&EA Industrial Hygiene Asbestos Exposure Monitoring Attached are the results of the asbestos exposure monitoring for three days on insulators at the Institute Plant while stripping a 3-inch dowtherm line with a live 1-inch steam tracer. The lines are located in the overhead piperack south of Building 9 and north of Street B. Glove bags were not used because of the live steam line and the pipes were not enclosed for this asbestos removal project because it was not feasible to enclose according to the Construction Department and the 512 Plant Industrial Hygiene Department. Employees used a powered man-basket to reach the lines being stripped. All personal exposure samples, except one, show levels below 0.1 f/cc Action Level standard established by 0SHA. A statistical analysis of the TWAs data proves the 0.14 f/cc result on 4-15-87 (Action Level is 0.1 f/cc) is not an outlier at the 99, 95 and 90% confidence levels, thus employees have to be monitored while Asbestos stripping without glovebags and/or enclosures and wearing half-face HEPA cartridge respirators. However, the exposure monitoring may not be required in some instances where supplied air respirator in a positive pressure mode is used while stripping asbestos insulation. Employees wore no street clothes, two pair of coveralls, headcovers, boots, gloves and AOR57A half-face respirators equipped with HEPA filters. They showered before lunch and at the end of the workday before leaving plant. UCC 024453 ASBESTOS EXPOSURE MONITORING 2- - April 27, 1987 Please inform P. K. Snodgrass, B. J. Agosti, C. B. Clendenin and S. R. Erskine of their exposure monitoring results as soon as possible. Have them sign and date this report and return to M. A. Patel at Building 701-330. If you have questions or if we can be of further assistance, please call us on extension 4779 or 3750. WORK BY: APPROVED BY: Attachment VES:HJK:MAP:rab 2263P UCC 024454 Ccnp. Ref. W-2177 W-2178 W-2179 ASBESTOS EXPOSURE MONITORING Sanple Type/ Date Errployee Name Sanpling Time Air Cone, fibers/cc mg fibers/cc COM'tNTS 4-14-87 Personal/ P. K. Snodgrass 6hrs 57min 0.087 0.076 Groundtoan, collected and vactwned bags. Approx. 70 feet of line stripped. 4-14-87 Personal/ B. J. Agosti 6hrs 57min 0.079 0.068 Used man-basket to reach and strip approx. 70 feet of line. 4-14-87 Personal/ C. B. Clendenin 6hrs 55min 0.044 0.038 Used man-basket to reach and strip approx. 70 feet of line. 4-15-87 Personal/ B. J. Agosti 6hrs 41min 0.015 0.012 Qroundnan, collected and vacuuned bags. Approx. 25 feet of line stripped. 4-15-87 Personal/ S. R. Erskine 6hrs 35min 0.171 0.140 Used man-basket to reach and strip approx. 25 feet of line. 4-16-87 Personal/ S. R. Erskine 6hrs 14min 0.114 0.089 Used man-basket to reach and strip approx. 20 feet of line. 4-16-87 Personal/ P. K. Snodgrass 6hrs lOnin 0.064 4-16-87 Personal/ C. B. Clendenin 6hrs 7nrin 0.014 0.042 o.on Used man-basket to reach and strip approx. 20 feet of line. Used man-basket to reach and strip approx. 20 feet of line. 2263P UCC 024455