Document K65ve8NmOQ7JVY6V2NDgekyeK
LOCA1I
R. S. Yates - General offices
March 14, 1969
"
ftURJECT REFERENCE
TO
Review of Engineering Flow Diagrams -
Meeting Held at CED on March 10, 1969 CEA 2080 -
Increase Solid Aroclor Capacity
' Mike Kaye W. E. Voss R. S. Yates
-
'
R. Q. Brown
4*r*r%w^t
R. C. Herman
K. Johnston R. M. Kountz
H. L. Williams
A review of five engineering flow diagrams was made with
special emphasis on instrumentation required for the above
project. A summary follows:
,
1) Capillary tubing will be used for temperature control instruments. The capillary will consist of a S.S. capillary with S.S. armor and a 3/8" thick coating of vinyl over the S.S. armor.
2)
o\U
o
On the Terph Tank Scale, a low level switch should be installed to shut the Santowax transfer pump down when the tank is empty.
A license is required for the two still nuclear instru^ ments. Mr. Voss will begin action to get sujj Alabama license.
4) A bell will be used for chlorinator alarms, A horn will be used for other alarms.
5) The standard absolute mercury monometer scales used on the still system will be obtained by Mr. Voss.
6) The level alarms on the still, the nuclear high and low level units, will have a separate alarm system at the panel'board.
7) Since we want the maximum amount of vacuum at the still pot, the vacuum control feature will be removed--the vacuum recorder will remain.
8) The still receiver will have a DP cell for level rather than float or bubbler. A boss is required on this tank, Item 1-132.
9) Mr. Voss requested that he give consideration to the use of electronic instruments rather than pneumatic instru ments. Mr. Yates will review thi^s with Mr. Brown. To make this change at this time would require an optional Variance approved by Mr. Kuhn.
10)
We reviewed the temperature points required for proper oper ating control. We will install a Multipoint Indicator with
the following points:
IN-10 REV 1168
0235778
TOWOLDMONOQ48213
2
(
Therminol System
- Into Heater
II M
- Out
II
II II
- From New Area
II II
- From Existing
II II
- In Surge Tank
Chlor. Circ. Line
II . II
II
-
Out of Chlor. Cooler -
II H II
H-
Into Ther. Cooler
II II II
-
Out of Ther. Cooler -
It It
II
II
-
Item
II II II II II II II
105 118 106 119 116 123 116 123
Terph Tank Off-Gas Tank Blowing Tank Catch Tank
- II - II - II - II
101 109 125 135
Into Cyclone
-
Out of Cyclone
-
TW Into Condensers
Out of Vapor Cond. -
Into Ther. Cooler
-
TW Out of the Cooler -
II II It
131 141 141
11) We will install two Multipoint Recorders with the follow
( ing points. Mr. Voss will check whether two are required
for proper operations.
#1 Unit
#2 unit
Chlorinator Item 104 " " 117
Vapor Out of Item 108 Discharge Line, Item 115
.. 122 II II II 112
Gas to Item 108 Ther. From Item 113
Still pot #5 Into Still Htr. Out of Still Htr. Still Recvr. #5 Circ. Therm. From Item 140
4*
js
0Z3*779
TOWOLDMON0048214