Document K64VevM4De3LaJynvNy8y2wXw
ALUMINUM COMPANY OF AMERICA
Rockdale Works
LABORATORY
Page 1 of 2
REPORT TO
E. B. Parker
DATE
10-21-7^
REPORT NO.
3872-E
SAMPLE OF RECEIVED FROM COPIES TO DESCRIPTION
Air
Sampled October 17, 197^ Analyzed October 18, I97U
ECR
Samples taken in Bldg, kk during the sawing of 2" thick Marinite.
Sample No.
Asbestos Fibers
l&EK E.,PLAM.AC*A.N t iV ^kih. 1.0 fibers/cc 4^3-MO- 'UOM 2LUFTOH, NIAR.E.K
5P.AY PALM 4WD*lL-3MeU
k
n1 /
/ / (0
MM MM4, a* - 5^
6c
56>en flaka saw 6 CLIFTON KIARE.K */?
11 " 1*5 18 " k.9
7 RAY PALM
rig 30 " 4.4
86>EH FLANAC.AN
lo " 7.6
9Ben flanasam
//
IL" i3
NOTES: The following statements are true for all samples:
1. All filter holders were worn on worker's lapels. 2. Exhaust system and air jet on the saw blade were in operation. 3. No dust was visible coming from saw. 4. The only dust visible came during the handling of the Marinite.
Sample No. 1 - During the sampling period the band saw was used to saw b' x61 sheets of 2" thick Marinite into 8 pieces 6"x8'. A total of k sheets was sawed. This worker spent most of the sampling period pushing the Marinite into the saw.
Sample No. 2 - During the sampling period the operation was the same as Sample No. 1 except this worker was catching the pieces of Marinite as they came from the saw and stacking them on a pallet.
Sample No. 3 - During the sampling period the operation was the same as Sample No. 1 except this worker was guiding the Marinite from the side.
OCT 2 J 1974
PLAINTIFF'S | EXHIBIT
* AL-73
SF-133 (REV i62)
ANALYZED BY
CHR
APPRnVFD RY
A. G. C.
ARD 003743
ALUMINUM COMPANY OF AMERICA
Rockdale Works
LABORATORY
Page 2 of 2
REPORT TO
E. B. Parker
DATE
REPORT NO.
.
10-21-74
3872-E
SAMPLE op RECEIVED PROM COPIES TO
description
Air
Sampled October 17, 1974
Analyzed October 18, 1974 ECR
Samples taken in Bldg. 44 during the sawing of 2" thick Marinite.
Sample No. 4 - During the sampling period the 6"x8' pieces cut in Sample No. 1 were sawed into 5 pieces 6"xl8-l/2". Approximately 90 pieces sawed during the sampling period. This worker spent approximately half of the sampling period pushing Marinite into saw and the other half guiding the Marinite from the side.
Sample No. 5 - During the sampling period the operation was the same as Sample No. 4. This worker spent approximately half the sampling period guiding the Marinite from the side and the other half pushing the Marinite into the saw.
Sample No. 6 - During the sampling period the operation was the same as Sample No. 4 except this worker was catching the pieces as they came from the saw and stacking them on a table behind the saw.
Sample No. 7 - During the sampling period the band saw was used to cut a 1/2" section from the broad face of the 6"xl8-l/2"x2" pieces of Marinite sawed in Sample No. 4. This worker spent approximately 15 minutes pushing Marinite into saw and 5 minutes catching and stacking the pieces as they came from the saw. Approximately 60 pieces sawed.
Sample No. 8 - During the sampling period the operation was the same as Sample No. 7 except this worker spent approximately 15 minutes catching and stacking the pieces as they came from the saw and 5 minutes pushing Marinite into the saw.
Sample No. 9 - During the sampling period the 6"xl8-l/2"xl-l/2" pieces produced in Sample No. 7 were passed through a small bench shaper. Approximately 42 pieces were finished. Exhaust suction on cutting tool was good.
1633 (REV 1*62)
ANALYZED BY
CHR
OCT 2 1 >974
fi.APPROVED BY ___________
Pt C
ARD 003744