Document K6171odv7EN86nJEKanvLxQEX
PLAINTIFF'S EXHIBIT
INTERNAL CORRESPONDENCE
CHEMICALS AND PLASTICS
*
Xvitim .ecaiion
--ry --
Distribution Lists A-3 t C"6, C-7, E-6 and E 13
institute punt p. o. box 2i. charleston, west Virginia 2S330
Dart March 30, 1977
Origir^img Depi.
Industrial Hygiene
sbiu
Update of Procedure for Protection Against Inhalation of Asbestos Fibers
The attached procedure is to be used for the protection of personnel against inhalation of asbestos fibers and to assure compliance with OSHA Regulation 1910-1001.
The use of asbestos insulation in the Institute Plant was phased out in 197** which leaves only gasket material, tape and rope packing as the commonly used asbestos material in the Plant. Most insulation done prior to
197* involved the use of asbestos material.
Demolition and removal of asbestos from equipment that was insulated prior to 197* creates a potential for asbestos exposures. This type demolition is not only regulated by OSHA but also by the Environmental Protection Agency (EPA). EPA requires notification if rather large quantities of asbestos are to be removed under the terminology "demolition". C&P Environmental Protection Group is preparing a statement of C&P's position for the requirement.
OSHA regulation states that "no employee shall be exposed at any time to airborne concentrations of asbestos fibers in excess of 10 fibers, longer than 5 micrometers, per cubic centimeter of air." "The eight-hour timeweighted average airborne concentrations of asbestos fibers to which any employee may be exposed shall not exceed two fibers, longer than 5 micrometers, per cubic centimeter of air." A further reduction to 0.1 fiber per cubic centimeter of air has been proposed.
The requirements of OSHA and EPA can be handled by the Industrial
Hygiene Department if information and cooperation is furnished by personnel
responsible for work with asbestos. Since air sampling must be performed in
the breathing zone of the employee being exposed to asbestos, the Industrial
Hygiene Department shall be notified when any demolition or removal is done
for quantities of asbestos in excess of 5 meters in length for piping or 5
square meters on ducts, stills, tanks, etc. Naturally, we would like to know
when any job is to be done with asbestos, but realistically, quantities involving
the above amounts should permit adequate evaluations of conditions that may be
detrimental to health of personnel. Other requirements include personnel
protective equipment, housekeeping, waste disposal, recordkeeping and medical
examinations.
A 1 1 f: i
Very truly^yours,
n i
UCC017572
Mandatory Precautions and Procedures When Handling and Working With Asbestos
Industrial Hygiene Department must be notified when quantities of asbestos
in excess of 5 meters on piping or 5 square meters on ducts, stills,
reactors, tanks, etc., is stripped during demolition or renovation.
Advance notice of at least one workday should be given if possible so that
Industrial Hygiene can make proper preparations for sampling.
Respirators shall be worn while removing and cleaning up all types of
insulation whether asbestos is present or not.
A. Normal dust exposures - 3M respirator. No. 8710.
B. Heavy dust exposures - Supplied air respirator; either air hose or
cylinder.
Work Area precautions shall include:
A. Rope off work area with yellow barricade tape.
B. Warning lights shall be posted outside each roped off area or affixed
to barricade tape.
(1) Signs are available from Safety Supply.
C. Drop cloths, tarpaulins, or polyethylene film shall be used over
grating to contain falling asbestos debris.
DO NOT USE COMPRESSED AIR TO REMOVE DUST FROM SKIN OR CLOTHING. Clothing
contaminated with asbestos shall be exchanged after each shift or
completion of the job. If contaminated with asbestos, clothing should be
placed in a polyethylene bag to be sent out for laundering. Bags should
be marked with the specified OSHA warning:
CAUTION
Contains Asbestos Fibers
Avoid Creating Dust Breathing Asbestos Dust May Cause
] 1 Q^
Serious Bodily Harm. UCC 017573
2- -
5- Wet cleanup or vacuum shall be used when practical. NEVER BROOM SWEEP,
BRUSH OR AIR BLOW. Stripped asbestos material shall be placed in special
dustproof polyethylene bags. These bags with specified OSHA warning are
available in Stores. The bags shall be securely wired closed. 6. Disposal of the bags containing asbestos shall be made by landfill. Care
should be taken during disposal to insure that these bags shall not be broken open before covering with non-asbestos containing materials.
7. MEDICAL SURVEILLANCE will be conducted by Plant 512 Medical Department. 8. A. Tags and bags should.contain the following statement (available in
Stores):
CAUTION Contains Asbestos Fibers
Avoid Creating Dust
Breathing Asbestos Dust May Cause
Serious Bodily Harm.
B. Warning signs should contain the following statement (available from
Safety Supply):
ASBESTOS
Dust Hazard
Avoid Breathing Dust Wear Assigned Protective Equipment
Do Not Remain In Area Unless Your Work Requires It.
Breathing Asbestos Dust May Be Hazardous To Your Health. 9. Air sampling results shall be maintained by the Industrial Hygiene
Department.
3-30-77
UCC 017574
A2 i 19