Document K3rRoZLpod0xY3Mp0wM8Rd6X
ir.iNi'lLL.U UJtUJIiVlLS i' `'Uljli'lLKa UlViOlUW
DAILY OVA MONITORING REPORT FLEMINGTON PVC PLANT DATE ,5
Temperature
1F, Humidity : 7^ %> Barometric Pressure;
11, Wind Velocity:
Scale Reading @ Time, ppm (Hours)
Black Top Area Adjacent to Warehouse
l p-Wind Plant Location
Doim-Wind Plant Ijocation
Lunch Room
Quality Control Laboratory A. Areas:
laboratory ^1; near two-roll mill____________ Laboratory #2; between sink & PlastiCorder 3^1 juratory ft`2 Desk Oitxee
La!Juratory Li; Hood Area when testing VCM La corntory ; GO Area when testing VCM
Drve r Buildinp/Warehouse A. Areas:
Foreman s OJ:lice Maintenance 0ifice Maintenance Shop Warehouse
T
JE IE
/0 JO_
--
--
7 ... /*. --------------------- q----------------------------
Record^^y:
Date
Witnessed By
m
cn
03 c c mph, Wind Direction (from): Comments
1 ........
%
Scale i .ding Time, ppm (Hours)
Dryer LVilding/Karehouse (cont*cl) 1 A. Areas:
Warehouse 0Ufice Ranging Room Dryer Monitoring Desk Dryer Panel Hoard Jailing Collector Area
Si Jeter Deck ,!A" Sifter Deck 1 rlif 1 Centrifuge "A1' Centrifuge "B"
/s~
10
/sr
AO 0
_____________ ._______________ _____________ l1______________
AO
_____________ LSI_______________
B. Special Operations: Slurry Transfer Hook-Dp Wet Cake Sampling Dapping Machine-Operator's Station when bagging Bagging Machine-OperatorTs Station when filling Gaylords Reactor Cleaning; manual Reactor Closing; hatch cover closing and bolt down
aT JdT
Breathing Air Required
Underground VCM Storage Tank Farm A. Areas:
lank Farm Area; center of tank farm Compressor Shack; inside WallcY'ay between tank farm & F-6 blend tank
B. Special Operations: Cheeking tank level Checking blend tank LED & blend tank
top of
/a30 AT
Breathing Air Required
Breathing Air Required
VCM Rail Car Unloading Area A. Areas:
Unloading Platform
_____________ to_________________
Recorded BDate: 6 /Witnessed By:
Comments
fd.c ' CD CO CO
o
Date:
\'CM Rail Car Unloading Area (cont'd) B. s; c e .1 al 0 p orations:
kail Car Hook-Up VC'i Rail Car SampIins YCM kail Car Disconnect Draining of VCM Unloading Comp.
Reactor Building - 2nd Floor A. Areas:
Stairway Stairwell Anteroom Lavatory Charge Meter Area; between meters and
weigh station Foreman's Desk Operator's Desk Panel Board; aisle in front of stripper
platform Center Aisle Open Reactor; aisle around manway
0. Special Operations: Reactor Opening; Opening & Closing Hammer Blinds Opening & Closing Dump Valves Water Jet Reactor
Reactor Building - Ground Floor A. Areas:
Center Aisle Slurry Basket; aisle in front of baskets Methocol Make-Up Platform Recovery Comp, Room - between comp.
B. Special Operations: Slurry Basket Cleaning Slurry Sample from Stripper
Recorded BDate:^
-S--c--a--l-e-- --.---.-a--d--i-n--s--------T---im---e--,--- ppm (Hours)
Breathing Air Required Breathing Air Required Breathing Air Required
_______--
7s /a JT/s' /dT A<r JuT SLO ______________ SJD.______________
Breathing Air Required AO
Breathing Air Required
AT ______________ *______________
yr _____________ AO___ __________
Breathing Air Required
Witnessed
Comments
race . l^'1
^
cr /--
Date:
HQ1
Scale Revving Q Time, ppm (Hours)
Comments
page 4
Recovery Tank Farm
A, Areas:
__________ __________________ _______________________ ______________ ____.__________________________________
Recovery Tank Area; adjacent to
center tank
IS
Kalicv.av Rear Bunker
'sr.
Catalyst Weigh House; inside
______________2._______________
Settling Ponds; edge of pond near reactor building
So
B. Stecial Operations: Recovery Tank; water drain off
__ ___________________________________________________________________ . --.--------------Breathing Air Required
Pilot Plant A. Areas:
Reactor Area - 1st Floor Reactor Area - 2nd Floor Finishing Area; center aisle
B. Special Operations: Opening Dump Valve Closing Dump Valve Reactor Dumping Reactor Opening; remove bolts, open hatch Reactor Cleaning; manual Reactor Closing; close hatch cover and bolt down Tower Bottom Removal
30 ____________ __________________
30
------ -- -- Breathing Air Required Breathing Air Required
Breathing Air Required
Boiler House A. Areas:
North End - inside South End - inside
Bulk loading & Transfer 1 A. Areas:
Tower; walkway between tower & bins
/o ................ /jf________________
30
Recorde
Date: 3
Witnessed
Date:
flQ I
, Tin, lk- . Loading ft Trai ni sf, er (> cont'd)' B. Special Operatioiis: Transfer Line Hook-Up Bulk Truck Sampling Bulk Rail Car Hook-Up Bulk Rail Car Sampling
"i. --
Scale k ding @ Time > ppm (1 tours)
.--------" -------
----- -
--"
Comments
1 11
1
C
C
"1
Recorded By:
Date;'
Witnessed By;
Date;
*//>>/
CUTTING - WELDING - HOT WORK PERMIT
Da Started 9
Building Reactor - Pilot Plant
Floor______ First - Second_________
Area
Tank Farm
Work Required_______ OVA Test
PRECAUTIONS CHECK:
1. Work location has been examined by supervision.
2. Flammable materials, dust, gasses, removed.
3. Work will be restricted to area or equipment specified by permit.
4. Portable extinguishers or hose on hand.
5. Spark shields, fireproof curtains required.
6. Fire-watchers assigned.
7. Welding & cutting equipment in good repair & properly secured.
B 8. Continuous explosimeter checks required.
9. Fire patrol after completion of job required.
Permit expires
-me /
Work Status Q
Time
a Incomplete Time
Mechanic's Sig.__
Fire Watch Sig.
Area Supv.. Sig.
___________ _
Return permit to Maintenance Foreman
3/1/74 Prod. #20