Document K0w4kYO10ZJeZxBkyZXm6rb6

FILE NAME Allied Signal Bendix ASB DATE 1968 Jan 18 DOC ASB035 DOCUMENT DESCRIPTION NY Dept of Labor Memo - Notice of Plan Approval ac Bendix Corporation Friction Materials Division P.O. Box 238 Troy New York State of New York Department of Labor DIVISION OF INDUSTRIAL HYGIENE 80 CENTRE STREET NEW YORK N.Y. 10013 Att Mr. David E. Stone Plant Engineer NOTICE OF PLAN APPROVAL Plan No. 2089-67 Location of System Brake Drilling Tibbits Avenue Green Island New York Building Department 4B Drilling 80 -631-6989 PLAINTIFF'S 80-631-698 80-631-698 EXHIBIT 80 -631-6989 796 PENGAD PENGAD ADDRESS REPLY TO DATE January 18 1968 We are pleased to advise you that the plans you submitted to the Department of Labor for an exhaust system to be installed or altered have been approved One set of these plans is returned herewith The above plan is approved subject to the following 1 Since asbestos dust is being created the final test shall be based on dust counts 2 These plans have been held in abeyance pending receipt of additional information When the system has been installed or altered and is ready for test kindly notify the office of the Division of Industrial Safety Service at the following address New York State Department of Labor Division of Industrial Safety Service This State approval Campus Bldg 12 Room 423 Washington Ave. is based upon conformance to standards and requirements of Albany N.Y. the Labor Law and Att to the E. F Supv applicable Insp Industrial Codes of the State of New York You are responsible for determining whether emissions from the system meet the requirements of any local air pollution ordinances If any alterations of or additions to the above system are required which change its operating characteristics it will be necessary for you to submit revised plans to the Division of Industrial Hygiene for approval prior to making such alterations or additions MSh 223 3-66 MORRIS KLEINFELD M.D. Director For The Commissioner La ee rm kb