Document JzbaDGqZ62x8v48808pV8Q0B
DATE: SUBJECT: FROM: THRU: TO:
UNITED STATES ENVIRONMENTAL PROTECTION AGENCY REGIONS
77 WEST JACKSON BOULEVARD CHICAGO, ILLINOIS 60604
OCT O2 2019
CLEAN AIR ACT INSPECTION REPORT EDCO Products Inc., Hopkins, MN
Luke Hullinger, Enviromnental Engineer AECAB (MI/WI)
Ethan Chatfield, Acting Section Chief AECAB (MI/WI)
File
BASIC INFORMATION
Facility Name: EDCO Producrs Inc.
Facility Location: 8700 Excelsior Blvd, Hopkins. MN
Date of Inspection: 8/12/2019 EPA Inspector(s):
1. Luke Hullinger, Environmental Engineer 2. Kenneth Ruffatto, Environmental Engineer
Other Attendees 1. Mike DiSimone, EHS Facilities Specialist, EDCO Products Inc. 2. Jeffrey Williams. VP of Manufacturing, EDCO Products Inc.
Contact Email Address: mdesimone@edcoproducts.com and jwillian1s(a)edcoat.com
Purpose of Inspection: Clean Air Act Inspection
Facility Type: Coating applicator for roof a11d siding panels
Regulations Central to Inspection: NESHAP MlvlMM and NESHAP SSSS Arrival Time: 2:00 PM Departure Time: 4:00 P'l/i.
Page 1 of3
Inspection Type: lg) Unannounced Inspection D Announced Inspection
OPENING CONFERENCE
CxJ Credentials Presented CxJ CBI warning to facility provided
The following infonnation was obtained verbally from Mike DeSimone and Jeffery A. Williams unless otherwise noted.
Process Description: EDCO Products Inc. is a metal siding and roofing coating facility located in Hopkins, MN. Steel and aluminum coils are brought in on trucks and then used to produce painted parts for siding or roofing. The metal coils are unrolled, cleaned, and coated with pretreatment, which is a polyester coating. Next, the pretreated metal is cured in an infrared oven and is coated with the top coat. Then, the metal is cured in a natural gas oven, quenched in a water bath, and either sold to a customer for siding use or sent to the roofing area of the plant for further processing. The metal coils that are used for roofing go through the same process except there is no pretreatment process, and the metal is pressed into a roofing shape after the water quench.
Staff Interview: There is a fume hood over both paint application lines. The paint lines. infrared oven, and curing oven are vented to a thermal oxidizer. Air flow is continuously monitored into the coating room. Quarterly inspections are conducted for the air flow sensors. A monthly visual inspection is conducted on the duct work conveying emissions to the thermal oxidizer.
TOUR INFORNIATJON
EPA toured the facility: Yes Data Collected and Observations: The facility was not running during the inspection. Photos and/or Videos: were not taken during the inspection. Field Measurements: were not taken during this inspection.
RECORDS REVIEW
1.
2018 compliance summary
CLOSING CONFERENCE
Requested documents:
Page 2 of3
2016 thermal oxidizer stack test Last 2 years of deviation reports 2019 emissions swnmary report with calculations
SIGNATURES
Report Author: Section Chief:
Paob e 3 of3
Attachment B-1 MACT Compliance Spreadsheet
Summary, 2018
Coil lb hac uncontrolled lb har laallons li::ial solids lb hao/aal sollds lb hap/qal solids
Shin~ le lb hac laallons loal solids lb hap/aal solids lb hao/aal solids
Limit lb HAP/aallan solids) Limit (kq HAP/liter solids) Manthlv Value /lb HAP/aallon solids: Monthly Value (kq HAP/liter solids) Meet limit?
Jan-19 Feb-19 Mar-19
2108.21 105.41
3344.00 1435.74 0.07342 0.07342
1422.53 71.13
2674.00 1126.63 0.06313 0.06313
2340.61 117.03
3661.00 1305.14 0.08967 0.08967
An-19 Ma~-19 Jun-19 Jul-19 Aur-19 Ser-19 Oct-19 Nov-19 Dec-19
2829.17 141.46
5587.00 2707.99 0.05224 0.05224
2868.35 143.42
4603.00 1946.57 0.07368 0.07368
2343.00 117.15
4483.00 2070.45 0.05658 0.05658
2267.30 113.36
3845.00 1564.98 0.07244 0.07244
0.00 0.00 0.00 0.00
0.00000
0.00 0.00 0.00 0.00
0.00000
0.00 0.00 0.00 0.00
0.00000
0.00 0.00 0.00 0.00
0.00000
0.00 0.00 0.00 0.00
0.00000
2019
16179 809
28197 12158 0.06654 0.06654
114.66 137.00
16.16 7.10 7.10
0.401 0.048 0.152 0.018
YES
85.87 96.50 12.13
7.08 7.08
0.400 0.048 0.138 0.017
YES
107,85 129.55
15.20 7.09 7.09
0.401 0.048 0.170 0.020
YES
124.04 139.75
17.54 7.07 7.07
0.394 0.047 0.097 0.012
YES
141.62 163.00
20.20 7.01 7.01
0.400 0.048 0.145 0.017
YES
84.17 95.00 11.83
7.12 7.12
0.393 0.047 0.097 0.012
YES
127.25 143.50
17.98 7.08 7.08
0.401 0.048 0.152 0.018
YES
0.00 0.00 0.00
0.00
0.384 0.046
NA NA NA
0.00 0.00 0.00
0.00
0.384 0.046
NA NA NA
0.00 0.00 0.00
0.00
0.384 0.046
NA NA NA
0.00 0.00 0.00
0.00
0.384 0.046
NA NA NA
0.00 0.00 0.00
0.00
0.384 0.046
NA NA NA
785 904 111 7.1 7.1
0.398 0.048 0.130 0.016
YES
Example Calculation (January 2019) Total Coil Controlled HAP (MACT SSSS) Total Coil Gallon Solids
105.41 lb HAP 1435.74 Gallon Solids
Total Shingle HAP (MACT MMMM) Total Shingle Gallon Solids
114.66 lb HAP 16.16 Gallon Solids
Calculated Limit Formula (lb HAP/gallon solids)= (Total Coil HAP+ Total Shingle HAP)/(Total Coil Gallon Solids+ Total Shingle Gallon Solids)
= (105.41+114.66)/(1435.74+16.16)
0.152 lb HAP/gallon solids
Conversion Factor
lb HAP/gallon solids~ (453.6 glib~ kg/1000 g) * (7.481 gallon/28.32 liters) 0.1515757 lb HAP/gallon solids* Conversion Factor
0.018 kg HAP/liter solids
EDCO Products Inc.
Jan19 Jun19 Jul19-Dec19
13912 696
24352 10593 0.066 0.066
2267 113 3845 1565 0.072 0.072
2019
16179 809
28197 12158 0.067 0.067
658 761 93 71 7.1
0.397 0.048 0.127 0.015
YES
127 144 18 7.1 7.1
0.401 0.048 0.152 0.018
YES
785 904 111 7.1 7.1
0.398 0.048 0.130 0.016
YES
Total HAP Total HAP
1594 0.80
lb/ r ton/ r
S\Engineering\Environmental\2019 Emissions Data\July 2019\MMMM Verification Cales July 2019