Document JvdrqGx84mmDERYOaqXGxK2XZ
PLAINTIFF'S
EXHIBIT
CHR-176
*
COMKTOL
Inter Corr iny Correspondence
File Code
To -- Name S:_C. Enders from-- Name
Deperiment
Division
------^IProduc- tsFriction ___ ..Chemical
Oepenmeni
Division
G. A. Sattelmeier .industrial Hygiene
Subnet
Personnel
friani'OHice
Office
_ . Chrysier
June 2_._1972 C>MS Numo'
CIWS Numoer
Center -
Periodic Industrial Hygiene Survey
A p^iedic Industrial hygiene survey was, conducted a: the Friction Materials Building from^dlay 30^6n36ugh9Uttf^h2, 1972. by Messrs. T. W. Bohn. A. H. Gomez. L. Redmond and the writer.
Conditions and operations capable of producing an environment detrimental to employees' health were evaluated.
Federal. State and Corporate Standards were used in evaluating
the effectiveness of environmental controls.
condi
tions in the plant we re ^pWM#14.ence with these standards. Only those conditions found which require corrective action are out
lined in this report.
Summary and Recommendations
1. Solvent Vapor: Excessive concentrations of solvent vapor were found at the brake lining extruders while running batches which emit excessive amounts of toluene. Improved ventilation control is required for these extruders.
The ventilation control at the adhesive spray operations is not in accordance with requirements for this type of operation as outlined in the OSHA Standards, Article 1910.94, table G10. We recommend that ventilation improve ments be made to provide a control velocity at the spray operations of 100 feet per minute. Inadequate control velocities were found at the disc pad and disc plate spray operations in Bays C4 and D4, respectively.
2. Ventilation: Only two of the fourteen makeup air units were operating. The capacity of the system is greater than required by State law, however, mere Chan two units oust be run to provide makeup air at the minimum required rate of one cfm per square foot of floor space.
.3 Noise Excessive noise levels were measured at the disc
pad spray operations located at Bay C4 , at the #1 proof
tester. Hammond Flat finisher, and brake lining saws. We recommend that engineering controls be provided to reduce
these noise sources. Until engineering controls are insti tuted. hearing protection must be provided for all exposed employees.
4. Asbestos: Air samples were taken at all loca tions in the
plant where excessive asbestos dust exposure was considered
possible and in
"Ifljfcfce below the
1 UjJ-ter or air stand
1 of the
operations
exposures
a mnataciRS 'the MU standard of tw> fibers per mi 111-
^toa ventilation cont rol at these
opera tions 4mrfcijgislfifutad over the next few yea rs.
The current standard for asbestos is being s tudied to
determine if any modifications in processes will be re-
quired to meet this standard.
5. Microwave Radiation! The microwave oven in the food service
area was checked and the oven door seal was satisfactory to prevent overexposure.
hm Attachments
w. F. Bavinger R. F. Bowers W. T. Diehl D. L. Eschelbach R. T. Gaskill T. J. Lang E. R. Lombard R. D. McIntosh. M. F. E. Re pucci E. F. Ruiz, M. D. J. G. Shepherd N. A. Trombley
G. A. Sattelmeier Industrial Hygienist
Discus sion
Asbestos - Recent changes in the Section 1910 of the OSHA Standard have set the permissible exposure to asbestos fibers at 5 fibers per cubic centimeter of air effective July 7, 1972. at 2 fibers per cubic centimeter effective July l 1976 and a ceiling level has been set at '0 fibers per cubic centimeter effective July 7, 1972.
Ventilation - Under the new Standard for Exposure to Asbestos Dust, local exhaust ventilation must be designed, constructed, installed and maintained in accordance with the details outlined in the ANSI publication 7.9.2-1971 entitled "Fundamentals Govern ing the Design and Operation of Local Exhaust Systems."
The operation and maintenance section of the ANSI Z9.2-1971 stand ard specifies in paragraph 9.3.3 "No processes for which exhaust ventilation has been installed for hygienic or fire-hazard reasons should be operated when the exhaust system is not functioning satisfactorily." The quantity of air exhausted through each hood must be measured at the time of installation, following mainten ance. and periodically. The responsibility for carrying out the schedule should be Left with a single individual who is required to keep adequate records. A complete study of the exhaust ven tilation system is required at least annually.
Data Sheet Friction Materials Building
Asbestos Fibers
Location
Concentration in Fibers per cm-
A1lovable concentration
July 7. 1972
5.0
Bay F7 Bay F8 Bay C4
Unloading Hammond Flat finisher Loading Besly Grinder Loading slabs into saws: itl and #2
2.1 2.2 2.1
The above samples were collected on Millipore Cellulose Ester Filters using an MSA Portable Pump. Sample results were obtained using phase contrast microscopy at 430X.