Federal Register / Vol. 51, No. 119 / Friday, June 20, 1988 / Rules and Regulations
certain work at operations construction sites, where asbestos-related activities are typically intermittent and of short duration (Exs. 84-307, 84-457, 330, Tr. 6/ 27, p. Vil--17). The Building and
Construction Trades Department. AFLCIO, states:
Monitoring construction jobs poses a unique problem since exposure levels are constantly changing as the job progresses, and may vary with weather conditions in outdoor operations.. . . Hence, traditional sampling strategies that work well for fixed work sites with predictable and stable exposure levels must be adapted for nonfixed construction exposures. (Ex. 330)
As an alternative to traditional periodic monitoring requirements, the BCTD recommended that employers engaged in asbestos abatement work conduct sampling each day for 5 consecutive days and reduce the frequency of monitoring to weekly if exposure levels remain below 1.0 f/cc. (Ex. 330).
Similarly, the specifications for asbestos abatement submitted by the New York City Office of Design and Construction requires that monitoring be conducted daily within a work area during asbestos removal or encapsulation work. (Ex. 92-25) In addition, one construction employer that participated in the rulemaking hearing stated that he conducted daily monitoring. Mr. Thomas J. Major, Jr., President of Major Insulators of Golden. Colorado noted that his firm conducted both personal and area monitoring on a daily basis for asbestos removal projects. (Ex. 808X. p. 199).
OSHA agrees with the BCTD that, due to'the short duration of most construction projects and the frequency with which the work environment changes on construction sites, the traditional quarterly or semi-annual monitoring frequencies that OSHA has mandated in othertiealth standards would not provide an adequate degree of protection to construction employees. This is particularly the case for employees working in regulated areas, where monitoring data are essential for ensuring that appropriate respiratory protection is selected throughout the project. Accordingly, OSHA has required that employers conduct daily monitoring in regulated areas, which are required to be established where the PEL has been exceeded. However, In regulated areas where the maximum level of respiratory protection is afforded employees through the use of Type C full-facepiece supplied-alr respirators, the employer may, as stated in paragraph (f)(3), dispense with daily monitoring.
The existing standard (29 CFR
OSHA's experience with that rule and
1910.1001) contained requirements for
other health standards has shown that
environmental monitoring in additiun to these provisions have not presented
requirements for employee exposure
compliance or other problems in the
monitoring using breathing zone
past. OSHA has therefore determined
samples. This provision of the former
that inclusion of these observations of
standard staled that "samples shall be monitoring requirements in the revised
collected from areas of a work environment which are representative of the airborne concentrations of asbestos fibers which may reach the breathing zone of employees."
OSHA has not retained this requirement in the revised standards for asbestos because the Agency finds this provision duplicative of the requirements in paragraphs (0(l)(i) and (f)(l)(ii). OSHA believes that the personal monitoring called for in these two provisions will permit the employer
to accurately determine employee exposures and that compliance with the former standard's area monitoring
standard is appropriate.
In sum, OSHA has determined that the monitoring requirements contained in paragraph (f) of the revised standard for construction will attain the goals of monitoring provisions traditionally included in OSHA health standards designed for fixed-site manufacturing facilities to suit the variable conditions on construction worksites, OSHA has tailored the monitoring requirements in the new standard to reflect the recommendation of the CACOSH and or many other commenters in this rulemaking.'
provision will not add to an increase the accuracy of such determinations.
Accordingly, the Agency has deleted the former area monitoring requirement from both the revised construction and the general industry standards. In doing so, OSHA is increasing the costeffectiveness of the standard by eliminating duplication in regulatory
Paragraph (g)--Methods of Compliance
The former standard governing occupational exposure to asbestos required that engineering controls and work practices be used to meet the exposure limits contained in the standard. The engineering control methods outlined in the standard
requirements. OSHA has not retained the requirements for environmental
included isolation, enclosure, exhaust ventilation, and dust collection. The
monitoring in the final rule because the former standard also provided specific
Agency believes that employees are
requirements for the design, installation,
provided adequate protection by the
and maintenance of local exhaust
required breathing zone sampling.
ventilation systems and for the use of
However, OSHA does not discourage
local exhaust ventilation on hand and
employers from performing .
power tools that may produce or release
environmental monitoring during
asbestos fibers in excess of the
asbestos-related construction projects if exposure limits of the standard.
they choose to do so, because the Agency recognizes that environmental monitoring can be useful for (1) determining the extent of emissions of asbestos fibers into the general environment, and (2) establishing the boundaries of regulated areas.
Like the existing standard, the revised standard requires employers to notify employees of their exposure levels and to provide employees exposed to asbestos un opportunity to observe any air sampling being performed in accordance with the standard: designated employee representatives must also be given this opportunity. The revised standard further specified that such observers be provide with and required to wear any protective clothing and equipment required by the standard.
These provisions are consistent with
Work practices, particularly wet methods, were recognized by OSHA in the former standard as necessary for maintaining exposures at or below the PEL The use of wet methods was required to the extent practicable to reduce the release of asbestos fibers unless the usefulness of the product would be diminished by the use of such methods.
In the revised standard at paragraph (g)(l)(>), OSHA has presented a list of engineering and work practice control methods that, based on the data collected in the rulemaking record, have been determined to be effective for reducing exposures to asbestos fibers.
The effectiveness of local exhaust ventilation systems that are equipped with HEPA-filtered dust collection
Section 8(c) of the Act, which requires employers to permit employees to
systems was addressed by several commenters (Ex. 330: Tr. 7/10, p. 128).
observe any required monitoring and to The Building and Construction Trades
notify employees of their monitoring
Department described the effectiveness
results. No commenters addressed this of local exhaust ventilation systems
provision of the existing rule, and
(LEVs) as follows:
GLEASON-000962