Document Jrpg5J5xZbGjx5BN6ne56gVLB
J.R.! Savage - General Office i
October 7, 1970 I
SEPTEMBER PCB REPORT
Manufacturing
Mr. H. S. Bergen Mr. P.2. Hedge*
Mr. W. B. Pap&geor-ge Ocneral Office
ANNISTON P-LANT PCB Levels In Snow Creek
Average PCS loss for the are nth was high at 2600 ppb or 32 Iba/dAy, largely as a result of one very bad day (400 lbs) Contributing causes were:
1. The old limestone pit was overloaded and solid sludges were carried through, i
2. Detergent cleaning of the department,
3. Sewering of excessive aaounts of muriatic add.
!'
Since the new limestone bed was placed in aervloe on September 23, pit effluent has been at 0-3 ppb PCB'a. However,; leeching of PCB'a from the creek bed reeults in a plant effluent level of 90 - 240ppb or 1.1 - 2.8 lbs/day, gradually declining. The plant believes that the new pit can handle ordinary upsets and peak loads.
Regulatory Action
Telephone contact continued with the Alabama Water Improvement Commission. However, a planned meeting did not take place due to illness of AVIC members. Pressure for routine ubmlsrlbn of analytical data is not intense at this time.
Department Suspended Aroclor Control
An experimental skimmer operated very well removing the PCB laden scum which accumulates in the new sump.
Solid Vsstes
Solid waste data for evaluation of dlspodL methods has been accumulated. A report will be issued in October.
HONS 099026
hartoldm
Page 2
V. 0. KRUMMRICH PLANT I
PCB Levels In Sewer
Current lossec to the river from the treatment plant range from 12 to 742 ppb with an average loaa of 311 ppb Tor 11 samples. This la an equivalent average loaa of 71.5 lbs/day. Projecta^To Reduce Sewered PCB'a Pron Aroolor Departaent.
Blow Tank Demister (Estimate 20}l) projeot construction
la underway with completion scheduled for October..
A Procesji Amendment was approved.
'
Project for about $30,000 to provide paving, ourba, trenohea!and oatoh basin in tank car and tank truok loading
areas will be added to the incineration project to .
speed approval. I.
Program To Eliminate Sewered PCB'e Prom Using Departments
Departments 243 end 244
..
Plana ire to replacs the Thermlnol PR-1 with Therminol 55.
Lab work has been oonduoted to verify that there la no reaction between Thermlnol 55 and any process mtsrlala. Engineering le underway on system modifications required for use of Therminol 55* Target date for ohangeover is 12/1/70.
Departaent 245
:
' . ... /
The major problem here la air pollution froa the supply
tank vent. Our target is to soope a solution end prepare
an eatimate by 11/1. Changeover to a different fluid is
undesirable in this departaent due to the high fire
potential.
'
.: .
."
Department C51
'
'
I, Ko work has yet been done on the lubrioatlon and hydraullo
type easterns In this department. .
..
... ,
Department 239 ' .. ;.* ' - / v:
\
Work le In progress to develop projeot premise. Ve expect
to eliminate two pumps and a cooler in the Therminol Unas.
(Pending results of thermal stability of Santofhan 1 residue).
The projeot will lnolude a new expansion tank with suomerged
- -' _ ".* v ' *1, i. ^ ^ * w' ' ^ * "*
,*-* *. # * *
. ' .
! MOSS 09902?
HARTOLDMON0034561
? 3
V. 0. KRVMMRICH PLANT
Department 239 (Cont'd)
I' I pump, ! Ve *lo plan to upgrade control* and make furnace operation more reliable. How to suap the are around potential apllla la still unresolved. To go to a flammable heat transfer fluid la considered too great a prooees safety hacard In this area.
I Department 25$
Plans are to replace PR-2 with Therainol 66 by H/15/70.
Department 2*8
*'
No progress has been Bade to date. A definite plan will be developed by 11/1/70 with the objective of solving
any problems by 1/1/71.
!
Department 253 (PP8)
. .
.
1` The unit is still down and aost likely will not be etarted up again. The material on the pad has been
removed.
'
I Departaent 270
'
A 55-g<tllon drum hss been placed under the vent. '
Chat aoaked with Aroclor around the fumaoe aust still be -
replaced.
. -.
Departaent 27? ...
. . . . ... .
^
A 55-c*llon drum aust still be plaoed under the vent line (the vent will have to be shortened to do this). Chat abound the fumaoe still needs to be replaced.
.
Depertaent 273 * ' . * ` '
''
Work coapleted. Drum placed under surge tank vent.*-
Buckets plaoed to oolleot material froa drip pens
under Therainol circulating puaps. - . ' .
..
Departaent 822 .
. .'
. ' r. '
.
Unit in start-up. No visible source of loss observed. .
Xatiaate 2292 will be revised. This is the project to .
provide 160,000 gallons of storage for scrap Aroolor. A plant level earnings expense tlaata will be prepared ;
T i : x,;-
.`
HONS 099028
HART OLDMON0034562
Page 4
V. 0. KKUW-CTICH PLAKT
J| Department 222 (Cont'd)
i
to cover the cost of altering the storage tanJca
The 4,000 gallon trailer originally used to haul
Aroolore to Queeny Plant will be used for scrap
Aroolor hauling in the plant.
PCB Levels n Atmosphere
Vapor losses froa the Aroolor Department are estimated at 2.^ //day now and 1.6//day after the installation of the
blow tank demister.
1. Scrubber Staak (from blow tank drowning Jet) 0. S^V/day
This; is a measured quantity. With installation of
the demister and olosing the batch blow tanks, air
flow should be decreased to about 20% of present
'
flow. AseusLing the concentration to be the saae, loss
would be reduoed to ^/0.2//day. ...........................
.
[
2. Pume Removal Stack (from drowning area andsaapling
stations) U."U>*7*jr
This1 is an estimated quantity based on most vapors ' oosing from the druesaing station and assuming
10,OCX),000 //year dnamesd, and 1242 vapor pressure at 3jO*C. Samples are being taken to verify.
J. Aroolor Transfers Within Department l.Mf/day .
This1 is an estimated quantity assuming 7CK //year production and 2.5 transfsrs/pound at 100*C. Samples will be taken at storage vents to verify. '
4. Steam Jets - unknown ;
Will* be measured.
' . .
. i. MONS 099029
HARTOLDMON0034563