Document JrdGYKDawgXy0OxkJOL5MoM4v

ABD00305607 File Number Employee Department Item Current Status Date Submitted Completion Date 80-24 Lionel Stegal Maintenance 06/30/83 Top of Line III plasticizer scale is covered with plasticizer and resin causing a slipping hazard. Relocate valves or lower scale tank and build platform above tank with ladder. COMPLETE. 81-09 Charlie Peden Maintenance 04/24/81 Heat given off by blower is too hot for a man to work on dicers. Remove blower from dicer house and install in a room by itself. These will be modified as the Line I Modernization project is completed. Scheduled completion date is mid-1986. 81-10 Charlie Peden Maintenance 04/24/81 Exhaust fan not big enough to handle fumes and heat from the blower and dicers. Install another exhaust fan in top of dicer room. These will be modified as the Line I Modernization project is completed. Scheduled completion date is raid-1986. A ABD00305608 File Number_________________________ Employee Department__________________________ Item Current Status Date Submitted Completion Date 83-52 Tom Bales, Elton O'Mary, Roy Ray, Jimmy Brewer, Milton Threadgill, Needham Stahl Vinyl 09/09/83 Having to break product in compound silos creates a safety hazard to personnel. Causes muscle strain and many other dangers to employees. Engineer some sort of mechanical device to break product in silos. One additional bridge breaker and manway are installed in 410 silo. As part of this project, the vendor also supplied improved bridge breakers for the units previously installed. All modifications are complete. Current status is we are awaiting a production trial using a soft compound. 85-08 Harlow, Willis Maintenance 07/19/85 04/14/86 Dry blend lines to silo are too high. To renew lines and work on them we have to use pettibone or walk on pipes. Request that when lines are renewed, to build a walkway or lower lines. COMPLETE. Lines were relocated. 86-01 Spann, Douglas M. Vinyl 11/08/85 Taking fluid bed kasons apart and re-installing is a safety hazard. Piping in way and cannot get straight pull. Straps and hoist not adequate without straining. Revise piping and hoist operation so can get straight pull and lift kasons in and out without straining. Modification work is scheduled when the fluid bed is taken down for heating panel installation. Completion date, 5/01/86. A ABD00305609 File Number Employee Department Item Current Status Date Submitted Completion Date 86-04 Hamilton, Robert & Gunn, Albert Dry Blend 2/19/86 4/14/86 To clean dry blend ribbon blenders you have to stretch out across hand rail to vac out gear box end. This is a slipping hazard. Extend blender platform out over gear boxes so operator can reach both ends of blenders. COMPLETE. 86-05 Andrews, Dale Maintenance 5/06/86 This piece of equipment (plant crane) does not have an effective PM program to correct any minor faults. This in turn could endanger life and property since it is used to lift personnel. Start a PM program to be done at regular intervals (quarterly). 86-06 Hamilton, John Ray Maintenance 5/19/86 On/Off switch (to PVA make-up recorder) installed wrong. It serves no purpose. You have to unhook wire from switch to get recorder out. Install union and makeup box above switch so you don't have to unhook it hot and recommend that future isolation be installed properly. On/Off switch was installed past union. disconnected hot. 110V wiring had to be Install J.B. between on/off switch. This allows power removal before pulling recorder. A work order was written and corrective action is complete. A