MONSANTO COMPANY ORGANIC CHEMICALS DIVISION
ANNISTON. ALABAMA
EXPAND AROCLORS AT ANNISTON (Storage and Packaging)
CEA 1430 START-UP OPERATIONS MANUAL
July 1968 ************************************************************************************* This document contains confidential information which is the property of Monsanto Company. Only those portions relevant to a duly authorized individual's need to know may be excerpted for him. This report must not be sent outside the company without written approval and the authorized recipient is accountable for its con tents and for its proper disposal.
028**097
TOWOLDMONOQ44103
Copy No.
i
2 3 4 5 6 7 8 9 10 11
TANK FARM START-UP OPERATIONS MANUAL
Distribution List
Assigned To W. A. Kuhn R. W. Peterson W. B. Papageorge H. L. Williams C. K. Eastman J. C. Landwehr R. A. Haydel L. L. Faulkner V. R. Haupt W. F. Taffee Through 20
G. 0. - St. Louis G. 0. - St. Louis Anniston Anniston Anniston Anniston Anniston Ann!scon Ariniston Anniston Extras
Copy No
4
TOWOLDMONOQ44104
ANNISTON AROCLOR STORAGE AND PACKAGING CEP PROJECT 1430
START-UP OPERATIONS MANUAL TABLE OF CONTENTS
Demonstration Plan and Schedule Time Table Organization Communications
Start-Up Expense .............................. Code of Accounts Budget
Tentative Operating Instructions ........................................
Synopsis of Process
A
Hazardous Properties of Materials
B
Detailed Operating Instructions
C
Emergency Procedures
D
Training Plan ...................................................... .. Overall Plan Detailed Training Program
Objectives-Operations Plan and Procedures Process Simulation
Initial Operations Project Demonstration
A B C
Operations Plan and Procedures Details Process Simulation Initial Operations Project Demonstration
A B C
Miscellaneous ............................................................... Calibration Charts Equipment Performance Criteria Sheets Equipment Checklists Safety Equipment Inspection List Relief Valve Checklist Daily Inventory Sheet Operating Log Sheet (Tank Farm) Operating Log Sheet (Packaging)
Section I Section II Section III
Section IV Section V Section VI Section VII
02B4099
TOWOLDMONOQ44105
0284100
TOWOLDMONOQ44107
EXPAND AROCLORS AT ANNISTON CEA 1430
START-UP ORGANIZATION
-6'
028A102
TOWOLDMONOQ44108
DISTRIBUTION OF COMMUNICATIONS
Organic Adminis tration
Manufacturing
Eneineerine
1. Start-up Manual
Demonstration Plan & Schedule
IPM, MPD
PM
Expense - Code of Accounts
TPM
Operating Instructions
PM
Training Plan
TPM
PM
Process Simulation Plan
TPM
PM
Initial Operations Plan
TPM, DM
PM, SM
Project Demonstration Plan
TPM, DM
PM, SM
2. Budgets. Cost Standards.)
Variance Predictions
)
TPM TPM
3. Start-up Progress Reports
TPM, MPD
PM
4. Daily Status Reports
BGD
DM, TPM, MPD
PM, SM
5. Engineering Changes
TPM
PM, SM
6. Process Changes
TPM
PM, SM
7. Proiect Completion Report
BGD
DM, TPM
PM, SM
Plant
(PLM;, MS OMS OMS OMS OMS PLM, CMS, cc PLM, CMS PLM. CMS DS. PA. TSS PLM, CMS, DS, TSS PLM, CMS, DS, TSS PLM, CMS, DS, MS, TSS PLM, OMS, TSS, DS PLM, OMS, MS
ecm zo
TOWOLDMONOQ44109
DISTRIBUTION OF COMMUNICATIONS (Cont'd)
Distribution Code
Manufacturing - Technical Production Manager Manager, Production Planning & Distribution Director of Manufacturing
Engineering - Project Manager Section Manager
Plant - Plant Manager Organic Manufacturing Superintendent Maintenance Superintendent Chief Chemist Manufacturing Representative Technical Services Superintendent Plant Accountant Department Supervisor
Organic Administration - Business Group Director
TPM MPD DM
PM SM
PLM QMS MS CC MR TSS PA DS
BGD
,9 Z
s-
TOWOLDMONOQ44110
028*105
TOWOLDMONOQ44111
CODE OF ACCOUNTS
505 526 530 533 539 542 545 570 575 578 590 601 603 610 614 621 641 644 694 698 715 760 798 855 864 880 883
Purchased Raw Material Raw Material Handling Steam Electricity Water-Purchased Water-Plant Gas Wages Salaries Payroll Overhead Factory Supplies Packing Labor Packaging Overhead Laboratory Clothing & Laundry Technical Service Rentals-Equipment Start-up Expense Mechanical Expense Depreciation Consultant Fees Factory Indirect Expense Meetings & Conferences Sundries Office Supplies Communications Travel
o28i,l06
TOWOLDMONOQ44112
Item
CEA 1430 - Aroclor, Anniston Startup ~ Preparation 5/20/68
Dec. 1967 Jan. 1968
Feb. March April
May
June
July
August Sept. Total
Salaries Salary O'head (187.)
-
$250
$400
$440 $500 $1250 $1600 $1700 $1700 $2500 ,10,340
-
45
70
75
90 225 290 310
310
450
1,865
Labor
--
--
- . 210
850 12,550
425 8,325 22,360
Labor O'head (167.) Raw Materials
-. --
-r-
-
55 135 2, 010
70 1,330
3,580
- - - 2, 800 - 1,200 4,000
Mechanical Expense
--
--
- - - 5,000 2,000 1,275 8,275
Supplies, Factory
7-
--
-
-
623
500
-
800 1,930
All Others Total - Preparation
2713 2720
1792 2087
1565
910
1690 2215 2665 2635
1345
3245 20 ,775
2035 1425
2280 3935 6163 27505
5850
19125 73,125
C C N F I E ENI] A L
LOt V0?0
TOWOLDMONOQ44113
CEA 1430 - Aroclor, Anniston
CONFIDENTIAL
Start Up - Operation
Predicted Negative variances for Products Indicated_________ ________________
August September October November Total
Liquid Aroclor - 826.08 Solid Aroclor - 826.17
$1500
-
$1000
- $2500
*
2500
1000
3500
Biphenyl - 826.01 Nitrogen
3'W
I5T3
500 - 500 51575
TOTAL Raw Materials
15515"
1515
5751515
1000 "715(515
Directs Steam Electricity Gas H-,0 Plant H20 Purchased Packing Labor Packing Overhead Labor Salaries Payroll O'head (167.) Salary O'head (187.) Factory Supplies Laboratory
Clothing S> Laundry Prod. Dept. Cont. Exp. TSD Mechanical Expense Tank Car Storage
---------------ms------------------------
TOTAL Directs
500 100
" 400 ' ' "* 65
1000
500
750 500 6000 600
10415
-
"
'"
250 200 1100 600
2150
250 100
* 2230 360 200 1800
30 320 1500 200
-
500 7000
" 14490
" 1150 185 " 1800
320 500 100
2125
500 1100
-
7780
750 200
3380 545 600 -
3600 95
640 3250 1000
2875 1500 15200 1200
"" 34835
Indlrects 1 Depreciation
FIE TOTAL Indlrects
Performance Volume
400 ' 400
-
0284108
- ---
200 200 100 900 200 200 100 900
-
3000
1000
4000
Total - Operation
12665
2500
21690
9880 46735
TOWOLDMONOQ44114
028*109
TOWOLDMONOQ44115
TENTATIVE OPERATING INSTRUCTIONS
-14
A. Synopsis of Process
Aroclor is a trade name used to designate the chlorination products of Biphenyl and/or Terphenyls. Aroclors are produced in the chlorinators, air blown, distilled, earth treated, filtered, and stored.
Facilities provided by this expansion will not affect the Aroclor Manu facturing Process. This project provides blending, storage, and product packaging facilities. Aroclors (Liquids and Solids) will be transferred from the still receivers to the tank farm. The existing (4) horizontal Aroclor storage tanks will be removed. Expansion facilities Include nine (9) vertical storage tanks for Aroclor, one (1) 12,000 gallon agitated blend tank, and two (2) storage tanks for TCB and TTCB.
Product packaging facilities include a flaker for Solid Aroclors, a flaker for Biphenyl or Santowax R, and a bagger for both products. Also, a drum ming station for Liquid Aroclors, Solid Aroclors and HB-40 will be located in the south end of the new warehouse (CEA 1452).
028All
TOWOLDMONOQ44116
. *1
TOWOLDMONOQ44117
TOWOLDMONOQ44118
TOWOLDMONOQ44119
TOWOLDMONOQ44120
-19-
(
B. Hazardous Properties of Materials
Health Factors
Although the chlorinated Biphenyls are not normally skin irritants, their solvent action can remove natural protective oils and fats, and lead to drying and cracking of the skin. Also, continuous or repeated skin contact with chlorinated Biphenyls should be avoided because of the possible occurrence of a condition called "chloracne."
Primary exposure to Aroclor results from sampling. Gloves are to be used to minimize skin contact and burns.
Inhalation of Biphenyl fumes is not recommended, since it can cause a drugged effect on the person. Also, vapors of Santowax R are irri tating to the mucous membranes and bronchial tract.
PPO is toxic, avoid contact with skin and eyes. If any is splashed in eyes, wash with water and report to dispensary. Wash off any spills on skin with alcohol and follow with soap and water. Wear goggle-shield and gloves when handling.
( Thermal Burns
The equipment provided by this project will be used for transfer and storage of material from 85C. Gloves and long sleeve shirts with the sleeves rolled down must be worn when operating. This protective appar el can make the difference between first and second degree burns.
Particular care must be taken during sampling.
Fires
Flammable materials handled Include:
Biphenyl Santowax R Toluene Xylene HB-40
Areas for particular caution include the Biphenyl Flaking and Bagging areas. An ejector is being installed to minimize dust leaks and possi ble explosions. Mix area in the tank farm will be classed a fire hazard location, because of the presence of flammable materials, toluene and xylene.
028A11S
TOWOLDMONOQ44121
20-
C. Detailed Operating Instructions
Facilities provided by the project include:
Storage Tanks Mix Tanks for Blends Provisions for Loading of Tank Cars and Tank Trucks Provisions for Unloading Raw Materials (TCB & TTCB) from Tank Cars Flakers & Baggers for Biphenyl and Solid Aroclors
Below is a list of equipment by item number:
Item Number
700 701 702 703 704 705 707
708 709 710
711 712 713
713-001 714
714-001 715
715-001
717
717-001 719
720
721
723
725
Use
1254 Day Tk. Transfer Pump 1242 Day Tk. Transfer Pump 1242 Storage 1242 Storage 1242 or 1254
Storage 1254 Storage 1248 Storage 1221 or 1232
Storage 1260 Storage 1262 Storage 1242 Transfer
Pump 1242 Pump Motor 1254 Transfer
Pump 1254 Pump Motor Transfer Pump
1248, 1221, 1232, 1262 Motor for Item 715 1260 Transfer Pump 1260 Pump Motor 1242 Product Filters
1254 Product Filters
Filters for Item 715
1262 Product Filters
" Mix Tank
Description
,(Existing) 11,500 Gal. A1
(Existing) 150 GPM @ 120' (Existing) 11,500 Gal. Al (Existing) 150 GPM @ 120' 27,000 Gal. Al. (13'D. X 28') 27,000 Gal. Al. (13'D. X 28') 27,000 Gal. Al. (13'D. X 28')
27,000 Gal. Al. (13'D. X 28') 18,000 Gal. Al. (12'D. X 22') 18,000 Gal. Al. (12'D. X 22')
18,000 Gal. Al. (12'D. X 22') 18,000 Gal. Al. (12'D. X 22') 3 x 2-10/10 160 GPM @ 94'
15 HP 1750 RPM Encap. Same as 713
Same as 713-001 Same as 713
Same as 713-001
Same as 713
Same as 713-001 2-Cuno Model PT 184 Cuno-pore filters of 316 S.S. w/asbestos-cellulose filter media Same as 719
Same as 719
Same as 719
11,000 Gal. Al. (11'D. X : 15b slope bottom)
028*116
TOWOLDMONOQ44122
em Numbers (Cont'd)
Item Number Use Description
725-002
725-003 726 727 728
728-001
730
730-001
731
732
733 734 735
735-001
737
737-001
739(605)
740(603)
741(601) 742 743 743-001
743-002
744
744-001
745 746
747
747-001
750 751
Mix Tank Agitator 208-RSES-15-Propeller
Type w/shtt -off for seal repair
Agitator Motor
Same as 713-001
"CM" Storage Blend Tank
18,000 Gal. Al. (12'D. X 22') (Relocated) 2,000 Gal. 316 S.S.
Item 725 Trans Same as 713
fer Pump
Item 728 Pump
Same as 713-001
Motor
Item 727 Transfer Same as 713
Pump
Item 727 Pump
Same as 713-001
Motor
Filters for Item Same as 719
725 Filters for Item Same as 719
727 TCB Storage TTCB Storage
12,000 Gal. Al. (11'D. X 18') 12,000 Gal. Al. (ll'D. X 18')
TCB or TTCB Transfer pump
3 X 2-10/8 120 GPM @ 43.5'
TCB or TTCB Trans, Pump Motor
7-1/2 HP 1750 RPM Encap.
TCB or TTCB
3 X 2-10/9-1/2 120 @ 80'
Unloading Pump
TCB or TTCB
10 HP 1750 RPM Encap.
Unloading Pump Motor
#2 Filt. Rec. Pump
(Existing)
#1 Filt. Rec. Pump
(Existing)
Pump Blend Tanks (Existing) Motor Control Center
Clay Slurry Pot Clay addition to 725
Clay Slurry Pot N 33-50 Agitator
Clay Slurry
1/2 HP TEFC
Agitator Motor
Scavenger Pump
3 GPM @ 30'
(PP0)
Scavenger Pump
1/2 HP 1800 RPM
Motor
CM Transfer Pumps Same as 713
CM Product
Same as 719
Filters
Toluene or Xylene 186 PM @ 30' Drum Pump
Toluene or Xylene 1/2 HP 1200 RPM Pump Motor
Condensate Pig
3' D X 6' steel
Nitrogen Filter PK 31.20 Cuno
^84 11 7
-21-
TOWOLDMONOQ44123
-22-
\ Tentative operating instructions include:
1. Raw Materials Handling 2. Transfers to Storage Tanks 3. Loading of Tank Cars and Tank Trucks 4. Blending 5. Tank Farm and Bulk Shipment Sampling 6. Therminol System 7. Transfers to Packaging Facilities 8. Drumming 9. Flaking 10. Bagging and Palletizing 11. Finished Goods Storage 12. Emergency Situations
a. Tank Farm b. Packaging
1. Raw Materials Handling
a. TCB and TTCB Unloading
Unloading of TCB and TTCB is being relocated to the north dock of the new railroad spur located immediately west of the new warehouse. (Unloading pump is Item 735.) TCB and TTCB are received in 8000 gallon tank cars and 3000 to 4000 gallon tank I trucks.
1. Prior to connecting rail car, place blue flag about 10 feet north of car and chock each end of car. (For trucks be sure hand brakes are set.)
2. Maximum levels prior to unloading are:
If 8000 gallon car........... 307. If 4000 gallon truck --- 65% If 3000 gallon truck --- 707.
(Gauges located at tanks and in contol room.)
3. Open dome of car to Vent during unloading.
4. Take sample (2-1/2 gallon) to Lab for complete analysis.
5. TCB will be stored in Item 733, a 12,000 gallon carbon steel tank located in the middle of east row of tanks.
6. TTCB will be stored in Item 734, a 12,000 gallon carbon steel tank located on north end of east row of tanks.
7. Upon approval of sample by Lab, proceed to unload by opening valve (to proper tank) at upper level between
^ Items 733 and 734.
8. For tank cars remove plug from valve under car. Connect unloading line to bottom of car and pump suction line.
0284118
TOWOLDMONOQ44124
-23-
9. Connect ground cable.
10. Open valve on bottom of car.
11. Open valve, on suction side of pump and valve on discharge of unloading pump.
12. Turn on pump. (Approximate unloading time will be 1 hour.) Record level prior to and after unloading.
13. When tank level ceases to increase, Inspect car through dome to be sure tank car is empty.
14. If empty, close valve on bottom of tank car and valve on pump suction.
15. Cut off pump and close valve on discharge of pump.
16. Disconnect unloading line. Note: During this operation, goggleshield must be worn to protect eyes during disconnect operation.
17. Disconnect ground cable.
18. Close dome on car. Return unloading ramp to upright position.
1 19. Notify supervision that car is empty. 20. Remove chocks and blue flag when railroad switches.
21. Above operations are almost identical for unloading tank trucks.
b. Xylene. Toluene, and Scavenger (PPO)
Xylene, Toluene, and PPO are used from 55 gallon drums. Drums will be transferred from the warehouse as needed. See operating Details, Section III-C-4 for additives required for particular blends. Item 747, drum pump, will be used to transfer Xylene or Toluene to Item 727, blend tank.
Item 744, scavenger pump, will be used to transfer PPO to the suction side of Item 745, CM transfer pump, and Item 725.
2. Transfer to Storage Tanks
Four existing horizontal storage tanks located north of Building 27 will be dismantled upon successful demonstration of new tank farm. Equipment provided by this project includes;
2-27,000 gallon 1242 storage
1-27,000 gallon 1254 storage
1-27,000 gallon 1242 or 1254 storage
( 1-18,000 gallon 1248 storage
_
1-18,000 gallon 1221 or 1232 storage
OZ^11
1-18,000 gallon 1262 storage
1-18,000 gallon 1260 storage
Note:
A remote gauge and alarm for each tankabove is located in Aroclor control room. (Alarms at 907. levels)
TOWOLDMONOQ44125
-24-
Transfer of Liquid Aroclors to the new tanks can be accomplished by either of the following:
1. Transfer from vertical day tanks #5 or #6 existing storage to 1242 or 1254 storage, respectively.
2. Transfer from #1 and #2 filtrate receiver tanks to tank farm.
Two (2) tie-ins on the liquid system were made to provide a line for trans fer ofdistiUed material from the continuous chlorinator system and a line for transfer of distilled material produced on the batch chlorinator system. These two lines extend from the #1 and If2 filtrate receivers to the pipe bridge north of building 27. At this point, by flexible hose, either of the two (2) lines can be connected by quick connections to any 1 of 5 individual pipe lines so that the Aroclor is transferred to the prescribed tank. The five (5) lines include one for each of the following:
1. Line for 1242 2. Line for 1254 3. Line for 1260 4. Line for 1262 5. Line for 1221 or 1248
Tank Item Nos. 704, 705, 707 707, 708 711 712 710 or 709 respectively
a. 1242 t
1. At present 1242 is the only Aroclor treated in the Porocel column. 1242 to be treated is pumped from either #2 or if3 blend tank through the column and its existing filter to Item 702 (#5 storage tank).
2. Item 703 is used to transfer 1242 from Item 702 to either Item 704, 705 or 707.
3. Prior to transfer, check level in 704, 705 and 707. Level indicating gauge is located at the tank and in the Aroclor control room. (If 704 and 705 are full, be sure 707 is either empty or has been analyzed and verified to contain 1242. If 707 contains 1254, transfer its contents to 708.)
4. Open valve above prescribed tank. Close valves downstream of prescribed tank.
5. Be sure valve at quick connection pipe bridge is closed and dust cap is in place.
6. Open valve in line from 703 below tee.
7. Open valve in recycle line.
8. Start pump.
0284120
TOWOLDMONOQ44126
-25-
9. Open valve to tank farm above 703.
V 10. Close valve in recycle line.
11. If high alarm is energized prior to completion of transfer, change valves in tank farm to transfer material to another tank.
12. Untreated 1242 will be filtered in existing filter and trans ferred from #1 or #2 filtrate receiver to the tank farm, using Item 740 or 739, respectively.
13. See steps 3 and 4.
-
14. Be sure flexible hose is hooked to 1242 line. Close valve to Item 703, #5 storage tank pump.
15. Open valve in new line above Item 739.
16. Start pump.
17. Upon completion of transfer, stop pump. Close valve above 739 and tank receiving 1242.
18. Upon completion of final transfer of 1242, blow out line with Nitrogen to minimize cross-contamination of Liquid Aroclor
( products.
19. 1242 can be transferred from filtrate receiver to #5 storage tank (Item 702) . Steps 2 through 11 apply to subsequent transfers to tank farm.
b. Liquid Aroclors (other than 1242)
1. All Liquid Aroclors, other than 1242, are filtered in existing filter and are not treated in Porocel Column.
2. Transfer of these Aroclors will be made to tank farm from filtrate receivers.
3. Steps 12 through 18 above apply to these transfers.
4. Special care should be exercised in transfers of 1221 and 1248 as a single line is to be used for these Aroclors. Be sure valves are lined-up properly.
(
0204121
TOWOLDMONOQ44127
-26-
3. Loading of Tank Cars and Tank Trucks
1 This section describes procedures for loading of refined Aroclors into tank cars and tank trucks. Aroclors are shipped to customers in: 4,000, 7,000 or 8,000 gallon tank cars; and 3, 000 or 4,000 gallon tank trucks.
This project provides for relocation of Aroclor loading to three (3) load ing docks on the new railroad spur located immediately west of the new warehouse. Below is a list of loading stations for each Aroclor:
North Dock
Middle Dock
South Dock
1242 1254 1221 1232 1248 1262 1260 CM A13B PPO
X X X X X X X
X X
X X
X
Tank trucks can be loaded at the north dock only. Different Aroclors can be loaded'into a tank car and tank truck simultaneously.
a. Spotting Tank Cars t
1. Normally the railroad crew will spot cars at the Aroclor loading docks. With three (3) loading docks, it won't be necessary to move a car.
2. Prior to any work on a tank car, check to be sure hand brake is set.
3. Place chock at each end of car.
4. Place blue flag about 10 feet north of outside car.
b. Preparation For Loading of Car or Truck
Aroclors are shipped in lined vessels to protect the electrical proper ties from contamination. (All electrical grade vessels are lined with aluminum or a zinc-tin lining.)
1. Each car or truck is to be inspected prior to loading.
2. Use an approved tank entry and fire permit when entering a car or truck.
3. Observe safety rules for each permit. A fellow worker must be on top of the car or truck holding the rope harness. Uear the safety belt harness, an air mask, gas test the car, and use a low voltage, ex
I , plosion-proof light when entering a tank car or truck.
0Z8"lZZ
TOWOLDMONOQ44128
-27-
4. Quick connections are provided for tapping into an air bank at each of the new loading docks.
5. All material in the tank should be removed. Car should be wiped out using lint-free rags. Damaged lining areas should be cleaned of any rust particles and reported on inspection form. (All car cleaning will be done on day shift.)
6. After cleaning, put steam on the car or truck.
7. Verify there is enough material in the storage tank to load a car or truck as required. (See Section VII for storage tank calibrations.)
8. Circulate the material in the storage tank for two (2) hours before sampling. (See Section III-C-5 for details on sampling.)
9. Have Laboratory verify sample is in specification.
10. Connect ground cable to the car.
11. If loading a car at north dock, be sure flexible hoses are hooked to proper lines.
12. For tank trucks place diaper cloth sock over the end of the loading line extension.
13. Loading of tank cars will be made through the 2" dip pipe. Connection will be made by removing any fittings above flange of 2" plug valve. Dome of car should be returned to close position. (Do not seal dome at this time.)
14. Open 1" plug valve so that car can be vented during filling.
15. Loading lines for tank cars and tank trucks are horizontal swing "Chicksan Joints" and aluminum pipe.
16. For CM blend, place LS 95 in the dome of the tank car at the middle dock. This level signal (backpressure) will be transmitted to a valve downstream of pump 728. Uhen high level is attained, valve will be closed and pump will be shut down.
17. For Item 725 blends, place LS 94 in the dome of the tank car at the north dock. As in 16, above, valve is closed and pump (Item 745) is shut down on high level.
18. Set valves in the loading line from the storage tank to the loading dock. Do Hot Open valve in the line at the car.
Note: Care should be taken to see that the correct valves are set so only the desired Aroclor enters the loading line. Primary source of error is loading of Aroclors using Item 715. This pump will be used for loading of 1248, 1221/1232, and 1262.
0284123
TOWOLDMONOQ44129
-28-
c. Loading of Car or Truck
The following pumps will be used for loading of Aroclors:
Pump Item No.
Tank Item No.(si Aroclor(s)
Dock
713
704, 705, 707
1242
N, M, South
714 707, 708
1254
North
715
709, 710, 712
1248, 1221/1232, North
1262
717 711
1260
North
728 726 745 725
CM Blend
Middle
A13B, PPO, Etc. North
Pumps 713, 714, 715, and 717 can be operated in two different modes. The manual mode utilizes the local start-stop pushbutton and is used when the product does not flow through the flow meter, such as in recir culating. The automatic mode is required when the product must go thru the meter, as in pumping to the loading docks.
The sequence of operation for loading using pumps 713, 714, 715, and 717 is as follows:
1. Set in desired gallons on associated flow totalizer as indicated:
Pump 713 Pump 714 Pump 715 Pump 717
- FQ70 - FQ72 - FQ71 - FQ73
2. Depress reset button on flow totalizer.
3. Pump may now be started by depressing a remote start button. The lo cation of these start buttons is as follows:
Pump 713 Pump 714 Pump 715 Pump 717
- North,middle and south docks, - North dock and inside FQ72 - North dock and Inside FQ71 - North dock and inside FQ73
Inside FQ70
4. When the pump starts the associated flow valve will open and the product will fow to the desired location.
5. Open valve in drain line at the loading dock and allow one drum of Aroclor to flow through the line to flush out the loading line.
6. Close valve in the drain line and open valve in the line to the car. Approximately one (1) hour is required to load a car and 1/2 hour for a tank truck. Fill car or truck one to two feet into the dome.
7. When the amout of product pumped out equals the setting on the flow totalizer the pump will stop and the flow valve will close.
0284124
TOWOLDMONOQ44130
-29-
8. To restart the pump and open the flow valve the reset button on the flow meter must be depressed, then depress one of remote start buttons.
9. To stop the pump before the amount of product pumped equals the flow totalizer setting push any of the stop button (Remote or local) asso ciated with that pump. The flow valve will close when the pump stops. It is not necessary to reset the flow totalizer to restart the pump as the amount of product desired has not flowed thru the meter.
10. For transfers using 715, line to dock must be blown empty as this line is used for 4 products. Connect nitrogen to blowout point immediately downstream of meter. Slowly open valve allowing nitrogen to blow line clear. If the tank car or tank truck is full, blow line clear into drums.
11. Remove loading line from the car or truck. Close valves in loading and vent lines. Replace any fittings received on car.
12. Take samples from the car or truck and send to the Laboratory for final analysis. (See Sampling Details Section III-C-5.)
13. Close and tighten lid on car or truck.
14. Seal car or truck and record seal number and car or truck number in the Aroclor still log book.
The sequence of operation for loading pumps 728 and 745 are the same as above except for the following:
1. A flow meter is not employed in loading operations using pumps 728 and 745.
2. A level probe is placed in the desired tank car to be filled. Install washer at desired cut-off level. Washer is approximately 18n from bottom of pipe.
3. Depress the start button located at the loading dock. For pump 728 use probe lS.95 located at the middle dock. For pump 745 use probe LS 94 located at the north dock.
4. When the pump starts the flow valve will open allowing the product to flow to the tank car.
5. When the tank car is full the pump will stop and the flow valve will close.
6. The pump may be stopped before the tank car is full by pushing the stop button located at the loading docks or at the motor.
7. For transfers using 745, loading line must be blown empty as more than one blend will be pumped through this line. Connect nitrogen to blow out point near pump 745. Be sure all valves are open to dock as high pressure of nitrogen header would damage gaskets, etc. Blowout point should be downstream of automatic cut-off valve.
0284125
TOWOLDMONOQ44131
4. Blending
-30-
Belov Is a listing of Aroclor blends made at the Anniston Plant. The list includes components by percentage and vessel to be used for each blend.
Vessel 725
Blend Xnerteen 59201-A6
Components
1242 TCB
Theory #/cwt.
75.00 25.00
Standard #/cwt.
75775----------
25.25
725 Therminol FR-0
1242 TTCB
80.00 20.00
80.80 20.20
725
Therminol FR-Lo Temp
1242
TTCB
50.00 50.00
50.50 50.50
725 (709)
Santlclzer 794
1248 1260
50.00 50.00
50.50 50.50
725 (709)
Aroclor 1242-1248
1242 1248
28.00 72.00
28.28 72.72
725 Pyranol A13B3B
1260 TTCB Expoxide 221
45.00 55.00
45.45 56.12
0.13
725 Xnerteen PPO
1260
60.00
TCB 40.00
Glycidyl
Phenyl Ethe r --
60.60 40.82
0.22
725 Inerteen 54201-KA
1254
70.00
TCB 30.00
Glycidyl
Phenyl Ethe r --
70.71 30.61
0.22
726 Inerteen 54201-CM
1242
100.00
Glycidyl
Phenyl Ethe r. ?-
100.10 0.22
727 Aroclor 1254-4465
1254 4465
85.00 15.00
85.50 15.50
727
Aroclor 1260-5% Tolue le
1260
95.00
Toluene
5.00
95.95 5.05
727 Aroclor 1260-10% Toluene 1260
90,00
Toluene
10.00
90.90 10.10
727 Aroclor 1254-10% Toluene 1254
90.00
Toluene
10.00
727 Aroclor 1262-10% Toluene 1262
90.00
Toluene
10.00
727
Aroclor 1262-10% Xyle le
1262
90.00
Xylene
10.00
90.90 10.10
90.90 10.10
90.90 10.10
020412b
TOWOLDMONOQ44132
a. Inerteen 54201-A6
-31-
( 1- Be sure that tank 725 is empty and bottom valve is closed. 2. Set desired TCB quantity in FQ74.
3. Pump TCB from tank 733.
-V. Pump will cut off when desired flow has been transferred.
5. Blow out line with nitrogen so that metered_auantitv is actually transferred to mix tank. Blow out is made through 1" quick connec tion above pump discharge. Be sure valve at pump discharge is closed to prevent damage to pump seal.
6. Set desired flow in FQ70.
7. Pump 1242 from either Item 704, 705 or 707.
8. Valve in pump discharge line will close and pump will cut off when desired flow has been transferred.
9. If line is full at start of transfer, do not blow out line.
10. Batch size will be set bv supervision. Minimum batch size will be 3100 Kallons.
. 11. Agitate and blow with nitrogen for 2 hours. 12. Clean filter Item 731 while agitating.
13. Circulate thru filter 731 for 30 minutes. Take 3-1/2 gal. samples to Laboratory for complete Inerteen 54201-A-6 analysis.
14. Further handling will be on a blend-by-blend basis. Supervision will supply further instructions for packaging.
b. Therroinol FR-0
1. Same as in a-1 above.
2. Follow Instructions a-6 through a-9 above.
3. Set desired TTCB quantity in FQ74.
4. Pump TTCB from tank 734.
5. Follow instructions a-4 and a-5.
6. Follow instructions a-10 through a-12
7. Circulate thru filter 731 for 30 minutes. Take 1/2 gallon sample to
Laboratory for specific gravity and viscosity. (Specific gravity ( should be 1.400-1.421 @ 25C. and viscosity 10.5-12.5 centipoise.)
02B4127
TOWOLDMONOQ44133
8. If out of specs., make necessary adjustment^).
-32
9. When in spec., take another 1/2 gallon sample to the Lab*
10. Same as a-14 above.
c. Therminol FR-Lo Temp.
This blend Is similar to b above.
1. Follow instructions b-1 through b-6 above.
2. Circulate for 30 minutes and take 1/2 gallon sample to Lab. If out of specs., make necessary adjustment, specific gravity should be 1.431-1.452 @ 25C.
3. Handling of blend batches will be on an Individual basis. Supervision will supply necessary packaging instructions.
d. Santlclaer 794
1. Be sure that tank 725 is empty and bottom valve is closed.
2. Set desired flow in FQ73.
3. Pump 1260 from Item 711, using pump 717.
4. Valve in pump dlshcarge line will close and pump will cut off when desired flow has been transferred.
5. If line is full at start of transfer, do not blow out line.
6. Pump 1248 from Item 709 using pump 715. Set desired flow in FQ71. Be sure valves to bottom of 710 and 712 are closed.
7. After completion of transfer, blow out line with nitrogen. Connec tion point it immediately above 715. Be sure pump on discharge of 715 is closed.
8. Agitate for two hours.
9. lake 1/2 gal. sample to Lab. for analysis of Sp.Gr., refractive in
dex, and moisture.
Sp. Gr.
1.488-1.500
Ref. Index 1.6375-1.6395
10. If okay, catch three - 1/2 gal. samples for complete analysis. Await instructions for packaging.
0284128
TOWOLDMONOQ44134
Aroclor 1242-1248 Blend
33-
1. Be sure tank 725 is empty and bottom valve is closed.
2. Assuming a batch is required for an 8000 gallon tank car shipment, set FQ71 to transfer 6,000 gals, of 1248 from tank 709 to tank 725. (Specific Gravity of 1248 must be determined to be in spec, prior to transfer.) Pump will shutdown when prescribed quantity has been transferred.
3. Set FQ70 to transfer 2,300 gals, of 1242 from either tank 704, 705 or 707 to tank 725. (Sp. Gr. of 1242 must de determined to be in spec, prior to transfer.) Pump will shutdown when prescribed quantity has been transferred.
4. Circulate tank for 2 hours.
5. Take 1/2 gal. sample to Lab. for 1242-1248 blend.
6. Sp. gr. should be 1.430-1.440 @ 25C. If out of spec., make adjust ment.
7. Take 2 - 1/2 gallon samples of loaded material to Lab.
Pyranol A13B3B
1. Be sure tank 725 la empty and bottom valve is closed.
2. Transfer desired quantity of TTCB from tank 734. FQ74 is used to set quantity and will shutdown pump when transfer is complete.
3. Blow out line with nitrogen.
4. Transfer desired quantity of 1260 from tank 711. FQ73 is used to set quantity and will close valve in transfer line and shutdown pump when transfer is complete.
5. If line was full at start of transfer, do not blow out with nitrogen.
6. Add prescribed quantity of earth from tank 743. Add nitrogen to top of 743 to force earth into recycle line.
7. Agitate for 2 hours. Minimum batch is 3100 gals, to allow use of agitator.
8. Circulate through press for 30 minutes, then catch 1/2 gal. sample and shutdown circulation.
9. Label the sample A13B3B, check sp. gr., refractive index, moisture, chlorides, and send to Lab.
10. Continue agitating the mix until results of the anlysls are received from Lab. (If out of spec., adjust to get in spec.)
0284129
TOWOLDMONOQ44135
-34-
11. If the above sample Is okay by the Lab., using pump 744 add pre scribed weight of Expoxide 221. Blow out line to 725 to be sure desired weight is actually transferred. Drum of scavenger will be placed on scales to determine rate of transfer.
12. After Expoxide 221 is added, agitate and blow with nitrogen for 2 hour s.
13. Begin recirculation of blend through Item 731. Circulate for 30 minutes.
14. Take three 1/2 gal. samples, label A13B3B for complete analysis and send to Lab.
15. If okay, proceed to transfer to shipping containers as directed by supervision.
Note:
Specific gravity Range Refractive Index
1.563 - 1.571 @ 15.5C. 1.6075 - 1.6085 @ 25C.
g. Inerteen PPO
1. Open drain valve on dishcarge of 725 to be sure it is clean, then close bottom valve.
2. Follow instructions a-2 through a-5.
3. Transfer desired quantity of 1260 from tank 711. FQ73 is used to set quantity and will close valve in transfer line and shutdown pump when transfer is complete.
4. If line was full at start of transfer, do not blow out with nitrogen.
5. Add prescribed quantity of earth from item 743.
6. Follow Instructions f-7 through f-8.
7. Label the sample Inerteen PPO, check specific gravity, refractive in dex, moisture, and chlorides and send to Lab.
8. Continue agitating the mix until results of the analysis are recieved from Lab. (If the sample is out of specs, adjust to get in specifica tion. )
9. If the above sample is okay by the Lab., then add PPO (ether) using pump 744. Blow out line to 725. Drum of ether will be placed on scales to determine rate and amount of transfer.
10. After the PPO is added, agitate and blow with nitrogen for two hours.
11. Circulate through Item 731 for 30 minutes. Take three one-half gallon samples, label Inerteen PPO for complete analysis and send to Lab.
0284l3
TOWOLDMONOQ44136
-35-
12. If okay, draw out in drums or load car as directed by production supervision.
Note 1:
PPO is toxic, avoid contact with skin and eyes. If any is splashed in eyes, wash with water and report to dispensary. Wash off any spills on skin with alcohol and follow with soap and water. Wear goggles and gloves when handling.
Note 2: Specific gravity Range - 1.560 - 1.568 @ 15.5C.
Refractive Index
- 1.6137 - 1.6147 @ 25C.
h. Inerteen 54201-KA
1. Follow instructions g-1.
2. Follow instructions g-2.
3. If power factor of TCB is above 5, earth treat to bring power factor @ 60 cycles below a maximum of 5.
4. Transfer desired quantity of 1254 from tank 707 and 708. FQ72 is used to set quantity and will close valve in transfer line and shut down pump when transfer is complete.
5. If line was full at start of transfer, do not blow out line with nitrogen.
6. Add 10 pounds of earth to tank from item 743 and start agitating.
7. Agitate and circulate, by-passing filter for two hours. Blow tank contents with nitrogen to aid agitation and/or lower water content.
8. Circulate through filter Item 731 for 30 minutes, then catch one-half gallon sample.
9. Label the sample Inerteen 54201-KA. Send to Lab to check for adding ether.
10. Continue agitating and circulating the mix until results of the analysis are received from Lab. (If the -sample is out of specs., make adjustment.) (If power factor @ 60 cycles is more than 1.0, earth treat with 10 lbs. by-passing filter. Take sample after two hours circulate and agitate, and 30 minutes filtering.)
11. If sample is okay by the Lab., then clean the filter.
12. Add desired quantity of PPO (Glycidyl Phenyl Ether) using pump 744 and movable scales. Blow out line with nitrogen.
13. After the PPO is added, agitate and circulate for one hour.
0284131
TOWOLDMONOQ44137
-3614. Circulate through filter Item 731 for 30 minutes. Take three one-
half gallon samples, label Xnerteen 54201-KA for complete analysis and send to Lab.
15. If okay, (Power factor at 60 cycles must be 3.0 or lower) draw out in drums or load car as directed by production supervision.
1. Inerteen 54201-CM 1. Open drain valve on discharge of 726 to be sure it is clean, or contains spec, material, then close bottom valve. 2. Set desired flow in FQ70.
3. Pump 1242 from either Item 704, 705 or 707.
4. Valve in pump discharge line will close and pump will cut off when desired flow has been transferred.
5. 1242 line should be full before transfer. If so, do not blow line with nitrogen.
6. No minimum size batch, batch size set by supervision. 7. Start circulating 1242 using pump 745. 8. Begin transferring PPO to suction side of pump 745. Add desired
quantity of PPO using pump 744 and movavle scales. Do not blow out line to 745 pump.
9. Continue to circulate for two hours.
10. Take one-half gallon sample to Laboratory for refractive index, water, chlorides, and PPO.
11. Await instructions from supervision regarding packaging details.
Note: Weat goggles and gloves when handling PPO.
j. Aroclor 1254-4465
1. Open drain valve on discharge of 727 at suction of pump 730. Be sure tank is empty.
2. Transfer desired quantity of 1254 from tank 707 and 708. FQ72 is used to set quantity and will close valve in transfer line and shutdown pump when transfer is complete.
3. Start agitator.
4. Be sure steam is on and TIC 61 is set at 150C.
0284132
TOWOLDMONOQ44138
-37-
5. Add desired quantity of 4465 from tank 810 using pump 837. Recycle at 810 open to allow slow addition to 727. Keep agitator running.
6. Agitate for 8 hours.
7. After 8 hours, take one one-half gallon sample. Have material analyzed for specific gravity, refractive index, viscosity, and color.
Specs: Sp.gr. Refractive Index Viscosity @ 210F.
Color
@ 65C
1.512-1.526 1.6400-1.6420 49-55 2 Max,
8. If material is in specification take two one-half gallon samples. Await instructions for packaging.
k. Aroclor 1260-5% or 10% Toluene
1. Open drain valve on discharge of 727 at suction of pump 730, be sure tank is empty.
2. Transfer desired quantity of 1260 from tank 711 using pump 717. Set desired flow in FQ73.
3. Valve in pump discharge line will close and pump will cut off when desired flow is transferred. Do not blow out after transfer.
4. Pump Toluene from drums using pump 747. "Thief" each drum to be sure it is clear and free of water.
5. Agitate for 1 hour.
6. Take one one-half gallon sample to Laboratory.
7. If okay, await packaging instructions from supervision.
l. Aroclor 1254 - 107. Toluene
1. Open drain valve on discharge of 727 at suction of pump 730. Be sure tank is empty.
2. Transfer desired quantity of 1254 from tank 707 or 708 using pump 714. Set desired flow in FQ72.
3. See k-3 through k-7.
m. Aroclor 1262 - 107, Toluene
1. Open drain valve on discharge of 727 at suction of pump 730. Be sure tank is empty.
2. Transfer desired quantity of 1262 from tank 712 using pump 715. Set desired flow in FQ72. 026*133
TOWOLDMONOQ44139
-383. Valve in pump discharge line will close and pump will cut off
when desired flow is transferred. Blow out line upon completion of transfer. Use quick connect tie-in above pump 715.
4. See k-3 through k-7.
n. Aroclor 1262 - 10% Xylene
1. See m-1 through m-3.
2. Pump Xylene from drums using pump 747. "Thief" each drum to be sure it is clear and free of water.
3. See k-5 through k-7.
5. Tank Farm and Bulk Shipment Sampling
a) Raw Materials
1. TCB or TTCB
Protective Equipment: Gloves and goggle-shield
Purpose: To check quality of TCB or TTCB
Method: Each car will be sampled through the opened dome.
Container: Two-1/2 gallon bottles
Disposition: To Laboratory
Label:
Car No.: Date: Time: Analyze for: Sampled by:
2. Expoxlde 221, PPO. Toluene or Xylene
Protective Equipment: Gloves and goggle-shield
Purpose: To check moisture
Method: "Thief" each drum
Contalner: "Thief"
0284134
TOWOLDMONOQ44140
-39-
b) Storage and Blend Tanks
Protective Equipment: Gloves, goggle-shield and long sleeve shirts with sleeves buttoned
Purpose: Check physical and electrical properties
Method:
Sample ports at drain line of tanks on suction side of pump. Before taking sample, circulate for 5 minutes to insure a representative sample of the material in the tank to be sampled. Caution, hot material (about 140C.).
Container: 1/2 gallon bottle
Label:
Aroclor Grade :
Tank Ho.:
Date:
Time:
Analyze for:
*
Sampled by:
Disposition: To Laboratory
* Properties to be measured will vary with individual Aroclor grades.
Hote: See Section III-C-4 for size sample and analysis for each blend.
c) Tank Car and Tank Truck Shipments
Protective Equipment: Gloves, goggle-shield and buttoned, long sleeve shirts
Purpose: To check physical and electrical properties
Method: After loading car dip sample through dome of car. Each car will be sampled. Caution, Hot Material.
Container: Two - 1/2 gallon bottles One - 5 pint bottle
Label:
Car No.: Date: Time: Analyze for: Sampled by:
*
Disposition: To Laboratory
* Properties to be tested will vary with each Aroclor product.
0284135
TOWOLDMONOQ44141
(
12. Emergency Situations
a. Tank Farm
-40-
Occurrence
1. Instrument Air Failure
Symptom
Tank-Levels Drop to 0
Problem
Corrective Action
No level indica tion and metered transfers are stopped. Lose temp, control on 725 & 727
Stop transfers to storage tanks to prevent over filling tanks. Stop pumps engaged in transfers to prevent pump seal dam age.
2. Power Failure
None in Control Room
No high level to control room
Stop transfers to storage tanks to prevent over filling tanks.
3. Low Pressure Nitrogen
None in Control Room
Pull air in tanks trans ferring from
Stop all transfers from storage tanks to prevent air replacement of liquid removed.
4. Steam
None In Control Potential Line
Room
Pluggage
Stop transfers. Blow Aroclor filled lines with N to prevent pluggage.
TOWOLDMONOQ44142
oz^1
TOWOLDMONOQ44143
MASTER PLAN FOR TANK FARM TRAINING OF AROCLOR
' *1 OPERATORS AND CHIEFS 1
v f 1 \ ?' f t
NOTE: Group A Group B Group C Group D
A operators and 1 chief A-operators and 1 chief A operators and 1 chief 6 operators, 1 chief, and 1 relief chief
TOWOLDMONOQ44144
TIME 11:00 - 11:15 A.M. 11:15 - 11:30 11:30 - 11:45 11:45 - 12:30 12:30 - 12:45 12:45 - 1:45
1:45 - 2:00 2:00 - 2:15 2:15 - 2:45
TRAINING PROGRAM AROCLOK OPERATORS AND CHIEFS
FIRST DAY _ GROUP
TOPIC Indoctrination Organization Training Schedule Equipment Layout Break Tour of Site Tank Deta ils Pump Details Filter Details
INSTRUCTOR Williams Haydel Faulkner Faulkner
Faulkner Faulkner Faulkner
0284139
TOWOLDMONOQ44145
TIME 11:00 - 11:30 A.M. 11:30 - 12:30 12:30 - 12:45 12:45 - 1:45
1:45 - 2:00 2:00 - 2:15 2:15 - 2:30 2:30 - 2:45
SECOND DAT GROUP
TOPIC Level Instruments Flow Instruments Break Field Review of Instruments Relief Valves Pressure Control Systems Temperature Control Systems Interlocks
INSTRUCTOR Veazey Veazey
Smith Smith Smith Smith
02841*0
TOWOLDMONOQ44146
TIME 11:00 - 11:45 A.M. 11:45 - 12:30 12:30 - 12:45 12:45 - 1:15
1:15 - 1:30 1:30 - 2:00 2:00 - 2:45
THIRD DAY GROUP
TOPIC Transfers to Storage Loading of Tank Cars Break Unloading Line Draining Blow-out of Lines Tour
INSTRUCTOR Faulkner or Lackey Faulkner or Lackey
Faulkner or Lackey Faulkner or Lackey Faulkner or Lackey
TOWOLDMONOQ44147
TIME 11:00 - 12:30
12:30 - 12:A5 12:45 - 1:30
1:30 - 2:00 2:00 - 2:45
FOURTH DAY GROUP
TOPIC Blends
CM 1232 Tank 727 Tank 725 Break Tour Emergency Situations Wrap-Up
INSTRUCTOR Faulkner or Lackey
Faulkner Faulkner
TOWOLDMONOQ44148
:-*/*
140 l 3 02b1l<i3
TOWOLDMONOQ44149
AROCLOR EXPANSION START-UP OPERATIONS MANUAL
SECTION V - OBJECTIVES - OPERATIONS PLAN AND PROCEDURES
GENERAL
Start-up of facilities provided by this project will be separated into two phases. Initial phase will include check-out of storage tanks, loading facilities, and blend tanks. This will begin in mid-August. The remainder of the equipment will be placed in operation beginning in mid-October. This includes flakers, baggers, conveyors, drummer and therminol system. In addition, a performance demonstration phase has been scheduled after the initial operation.
Check-out of electrical circuits, instruments, control loops and equipment installation will be completed by CED and will precede the preparation and simulation phases. Manufacturing will assist in the preliminary check outs, following which the individual equipment items and auxiliaries will be formally accepted by manufacturing.
Preparation and simulation will entail the use of actual materials to flush lines and tanks. Start-up will be made on day shift only. CED will be requested to assist in the analysis and correction of operating problems.
The operations phase will begin when the objectives of preparation and simulation have been met. During initial operations, the equipment must perform at actual design conditions. During this period the process must be operated safely in accordance with the tentative operating instructions and must meet project premise quality and rate.
A schedule of start-up activities for both the earlier and later stages follows this section.
A. PROCESS SIMULATION
1. Utilities
a. Compressed Air
1) To clean supply and distribution piping of moisture, mill scale, and weld slag.
2) Deliver compressed air to tank farm and packaging facilities individually at required volumes maintaining supply header pressure at 90 psig.
3) Deliver 100 SCFM continuously and maintain supply header pressure.
b. City Water
1) To clean supply and distribution piping of dirt, weld slag, and mill scale.
02641*4
TOWOLDMONOQ44150
Section V - Objectives Operations Plan & Procedures
2.
2) Deliver water to users (loading docks, mill scrubber, personal services, safety showers) at 60 psig and up to 150 GPM.
3) Protect piping and users against freezing. c. Cooling Tower VJater
1) To clean supply and distribution piping of dirt, weld slag and mill scale.
2) Deliver cooling tower water to flakers at 50 psig in quantities up to 175 GPM, including up to 100 GPM to the Biphenyl flaker and up to 75 GPM to the Aroclor flaker.
3) Protect piping and users against freezing.
A) Accurately meter tower water usage.
d. Nitrogen
1) To clean supply and distribution piping of moisture, weld slag, and mill scale.
2) Maintain regulated header pressure of 40 psig and 50 SCFM flow to storage tanks,
3) Maintain inert blanket of 4 to 7 inches water column pressure
on storage tanks.
.
4) Accurately meter nitrogen usage. e. Steam
.
1) To clean supply and dis tribution piping, external panel coils, and tracing of weld slag and mill scale.
2) Discharge condensate at all traps.
3) Maintain regulated header pressure of 100 psig and 40 psig to tank coils.
4) Protect piping and users from freezing. f. Electricity
1) To insure that electrical circuits have been tested, energized and formally released to manufacturing before the circuits are required for equipment simulation or initial operation.
02B4145
TOWOLDMONOQ44151
Section V - Objectives Operations Plan & Procedures
3.
2) Supply power for motors totaling 300 HP at 440 volts.
3) Supply 100 KVA for therminol heater. 2. Auxiliaries
a. Therminol Distribution
1) To clean therminol supply and return header.
2) To supply sufficient heat to jacketed solid Aroclor lines and flaker coil to prevent solidification and pluggage.
3) Perform leak test. 4) Pressure of 40 psig and temperature of 550F.
b. Instrumentation and Controls
1) To insure that instruments have been properly installed and accurately calibrated,
3. Product Storage Tanks
a. To clean product storage tanks by wiping with Aroclor soaked rags.
b. Blanket the tanks with nitrogen making sure pressure regulators and relief valves function properly.
c. Operate pumps to verify emergency stops are operative and agitator interlock functions properly,
d. Record critical internal dimensions.
e. Actuate high level alarm (90%) on each tank. f. Determine flaker feed tank high level automatically closes valve
in tank feed line.
4. Blend Tanks
a. To clean blend tanks by wiping with Aroclor soaked rags.
b. Record critical internal dimensions.
c. Blanket the tanks with nitrogen making sure pressure regulators and relief valves function properly.
d. Operate pumps to verify stops are operative and agitator functions properly.
e. Actuate high level alarm (90%) on blend tanks.
O204l*t>
TOWOLDMONOQ44152
Section V - Objectives Operations Plan & Procedures
4.
5# Raw Material Unloading and Storage a. To clean TCB and TTCB storage tanks and unloading lines of weld slag, etc. b. Record critical data. c. Hook up unloading lines to check operation of swivel joints.
6. Loading Lines and Docks a. To clean the loading lines of moisture, aluminum oxide, and weld slag by flushing with 1242 Aroclor, b. Operate all loading pumps. c. Check flow meters, automatic valve closure and pump shutdown. d. Mark all lines by material handled or "Destination" of Aroclor in each line.
7. Flakers a. To inspect flaker pan, drum and drive system. b. To verify vents are open. c. Water system does not leak. d. Temperature gauges are calibrated. e. Overflow pipes are clean and open. f. Air pressure regulator for drive of knife is calibrated.
8. Bagger a. Hopper and line are clean. b. Control loops are checked-out. c. Pour flake material into hopper to check bagger prior to start-up of flakers.
9. Conveyors a. To be sure conveyors are adequately guarded. b. Controls are checked out. c. Gravity units have sufficient slope.
oza*!*7
TOWOLDMONOQ44153
Section V - Objectives Operations Plan & Procedures
5.
10. Drummer a. To be sure lines to drumming station are clean. b. Scales are correct. c. Controls are checked out.
B. INITIAL OPERATIONS 1. Storage Tanks a. Transfer 1242 through each line and tank for flush. b. Load tank cars of ''Flush Batch" to check loading lines and flow meter for transferring preset quantity. c. Actuate high level alarm on each tank. d. Measure loading and transfer times to determine performance of pumps. e. As tanks are filled and emptied, verify pressure of nitrogen blanket is maintained at A" to 7" W.C. f. Determine optimum steam pressure for desired storage temperature. 2, Blend Tanks a. Transfer "Flush Batch" from raw material storage tanks to blend tank. b. Test clay addition system and attempt to upgrade ''Flush Batch". c. Check automatic cut-off on horizontal agitator. d. Load tank car to test loading lines and automatic cut-off of pump when tank car is filled to desired level. e. Measure loading time to determine performance of pumps. f. As tanks are filled and emptied, verify pressure of nitrogen blanket is maintained at 4" to 7" U.C. g. Demonstrate control of temperature indicating control system.
0264148
TOWOLDMONOQ44154
Section V - Objectives Operations Plan & Procedures
6.
3. Raw Material Unloading and Storage Tanks
a. Unload "Flush Batch" from tank car to test unloading pump performance.
b. Measure unloading time.
c. Actuate high level alarm on each tank. d. As tanks are filled and emptied, verify pressure of nitrogen
blanket is maintained at 4" to 7" W.C. e. Determine optimum steam pressure for desired storage temperature.
4. Flakers
(Insert later)
5. Bagger (Insert Later)
6. Conveyors (Insert later)
7. Drummer (Insert later)
8`*v<`q 0*
TOWOLDMONOQ44155
Section V - Objectives Operations Plan & Procedures
7.
C. PERFORMANCE DEMONSTRATION
1. To demonstrate quality stored materials from use of nitrogen blanket and aluminum pipes and tanks.
2. To demonstrate ability to ovoid cross contamination.
3. To demonstrate flaking capacity of 5,000 pounds of biphenyl and 6,900 pounds of solid Aroclor per hour on day shift only, seven (7) days per week at 75% on-stream time.
4. To demonstrate bagging rate of 2.3 bags of 5460 and 1.7 bags of biphenyl per minute. (50# bags)
5. Operate all areas according to the Tentative Operating Instructions (as amended).
0*841*0
TOWOLDMONOQ44156
TOWOLDMONOQ44157
u
TOWOLDMONOQ44158
1242 STORAGE TANKS
ITEMS 704, 705. & 707
Ins.Aroclor
Ins.Aroclor
Ins.Aroclor
% Scale Gallons (Innage)
% Scale Gallons (Innage)
% Scale Gallons (Innage)
0 493 1 765 2 1036 3 1308 4 1579 5 1851 6 2122 7 2393 8 2665 9 2937 10 3208 11 3480 12 3751 13 4023 14 4294 15 4566 16 4837 17 5109 18 5380 19 5652 20 5923 21 6195 22 6466 23 6738 24 7009 25 7281 26 7552 27 7824 28 8095 29 8367 30 8638 31 8910 32 9181 33 9453
6 9 13 16 19 22 26 29 32 36 39 42 46 49 52 56 59 62 65 69 72 75 79 82 85 88 92 95 98 102 105 108 112 115
34 9724 35 9996 36 10,267 37 10,537 38 10,810 39 11,082 40 11,353 41 11,625 42 11,896 43 12,168 44 12,439 45 12,711 46 12,982 47 13,254 48 13,525 49 13,797 50 14,068 51 14,340 52 14,611 53 14,883 54 15,154 55 15,426 56 15,697 57 15,969 58 16,240 59 16,512 60 16,783 61 17,055 62 17,326 63 17,598 64 17,869 65 18,141 66 18,412 67 18,684
118 122 125 128 131 135 138 141 145 148 151 154 158 161 164 168 171 174 178 181 184 188 191 194 197 201 204 207 211 214 217 220 224 227
68 18,955 69 19,227 70 19,498 71 19,770 72 20,041 73 20,313 74 20,584 75 20,856 76 21,127 77 21,399 78 21,670 79 21,942 80 22,213 81 22, 485 82 22, 756 83 23,028 84 23, 299 85 23,571 86 23,842 87 24,114 88 24, 385 89 24,657 90 24,928 91 25, 200 92 25,471 93 25,743 94 26,014 95 26, 286 96 26,557 97 26, 829 98 27,100 99 27, 372 100 27,643
230 234 237 240 244 247 250 254 257 260
263 267 270 273 277 280 283 286 290 293 296 300 303 306 310
313 316 320 323 326 329 333 336
Aroclor 1242 Temperature - 140C. Sp. Gr. - 1.272 @ 140C.
Inst. Range - 0-425" H2O Inst. Scale - 0-1007.
0264153
TOWOLDMONOQ44159
1 AROCLOR 1254
ITEMS 707. 708
% Scale Gallons Ins.Aroclor 7. Scale Gallons Ins.Aroclor % Scale Gallons Ins.Aroclor
0 493 1 732 2 971 3 1210 4 1449 5 1688 6 1927 7 2166 8 2405 9 2644 10 2883 11 3122 12 3361 13 3600 14 3839 15 4078 16 4317 17 4556 18 4795 19 5034 20 5273 21 5512 22 5751 23 5990 24 6229 25 6468 26 6707 27 6946 28 7185 29 7424 30 7663 31 7902 32 8141 33 8380
6 9 12 15 18 21 24 27 30 32 35 38 41 44 47 50 53 56 59 62 65 68 71 74 77 80 82 85 88 91 94 97 101 103
34 8619 35 8858 36 9097 37 9336 38 9575 39 9814 40 10,053 41 10,292 42 10,531 43 10,770 44 11,009 45 11,248 46 11,487 47 11,726 48 11,965 49 12,204 50 12,443 51 12,682 52 12,921 53 13,160 54 13,399 55 13,638 56 13,877 57 14,116 58 14,355 59 14,594 60 14,833 61 15,072 62 15,311 63 15,550 64 15,789 65 16,028 66 16,267 67 16,506
106 109 112 115 118 121 124 127 129 132 135 138 141 144 147 150 153 156 159 162 165 - 168 171 174 177 180 182 185 188 191 194 197 200 203
68 16,745 69 16,984 70 17,223 71 17,462 72 17,701 73 17,940 74 18,179
75 18,418 76 18,657 77 18,896 78 19,135 79 19,374 80 19,613 81 19,852 82 20,091 83 20,330 84 20,569 85 20,808 86 21,047 87 21,286 88 21,525 89 21,764 90 22,003 91 22,242 92 22,481 93 22, 720 94 22,959 95 23,198 96 23,437 97 23,676 98 23,915 99 24,154 100 24,393
206 209 212 215 218 221 224 226 229 232 235 238 241 244 247 250 253 256 259 262 265 268 271 274 276 279 282 285 288 291 294 297 300
Aroclor 1254 Temperature - 140C. Sp. Gr. 1.425 @ 140C.
Inst. Range - 0-428" H2O Inst. Scale - 0-100%
02841*''
TOWOLDMONOQ44160
1248 STORAGE TANK ITEM 709
Ins.Aroclor
Ins.Aroclor
Ins.Aroclor
% Scale Gallons
(Innage) % Scale Gallons
(Innage) X Scale Gallons
(Innage)
0 420 1 601 2 782
3 963 4 1144 5 1325 6 1506 7 1687 8 1868 9 2049 10 2230 11 2411 12 2592 13 2773 14 2954 15 3135 16 3316 17 3497 18 3678 19 3859 20 4040 21 4221 22 4402 23 4583 24 4764 25 4945 26 5126 27 5307 28 5488 29 5669 30 5850 31 6031 32 6212
33 6393
6 9 11 14 16 19 21 24 27 29 32 34 37 40 42 45 47 50 52 55 58 60 63 65 68 70 73 76 78 81 83 86 89 91
34 6574 35 6755 36 6936 37 7117 38 7298 39 7479 40 7660 41 7841 42 8022
43 8203 44 8384. 45 8565 46 8746 47 8927 48 9108
49 9289 50 9470 51 9651 52 9832 53 10,013 54 10,194 55 10,375 56 10,556 57 10,737 58 10,918 59 11,099 60 11, 280 61 11,461 62 11,642
63 11,823 64 12,004 65 12,185 66 12,366 67 12,547
94 96 99 101 104 107 109 112
114 117 120 122 125 127 130 132 135 138 140 143 145 148 150 153 156 158 161 163 166 169 171 174 176 179
68 12,728 69 12,909 70 13,090 71 13,271 72 13,452 73 13,633 74 13,814 75 13,995 76 14,176 77 14,357 78 14,538 79 14,719 80 14,900 81 15,081 82 15,262
83 15,443 84 15,624 85 15,805 86 15,986 87 16,167 88 16,348 89 16,529 90 16,710
91 16,891 92 17,072 93 17,253 94 17,434 95 17,615 96 17,796 97 17,977 98 18,158 99 18,339 100 18,520
181 184 187 189 192 194 197 199 202 205 207 210 212 215 218 220 223 225 228 230 233 236 238 241
243 246 249 251 254 256 259 261 264
Aroclor 1248 Temperature - 140 C. Sp. Gr. - 1.335 @ 140C. Inst. Range - 0-352" 1^0 Inst. Scale - 0-100%
(
0^84155
TOWOLDMONOQ44161
AROCLOR 1221 STORAGE TANK ITEM 710
Ins.Aroclor
Ins.Aroclor
Ins.Aroclor
% Scale Gallons
(Innage) % Scale Gallons
(Innage) % Scale Gallons
(Innage)
0 420 1 601 2 782
3 963 4 1144 5 1325 6 1506 7 1687 8 1868 9 2049 10 2230 11 2411 12 2592
13 2773 14 2954 15 3135 16 3316 17 3497 18 3678 19 3859 20 4040 21 4221 22 4402 23 4583 24 4764 25 4945 26 5126 27 5307 28 5488 29 5669 30 5850 31 6031 32 6212 33 6393
6 9 11 14 16 19 21
24 27 29 32 34 37 40 42 45 47 50 52 55 58 60 63 65 68 70
73 76 78 81 83 86 89 91
34 6574 35 6755 36 6936 37 7117 38 7298 39 7479 40 7660 41 7841 42 8022
43 8203 44 8384 45 8565 46 8746 47 8927 48 9108 49 9289 50 9470 51 9651 52 9832 53 10,013 54 10,194 55 10,375 56 10,556 57 10,737 58 10,918 59 11,099 60 11,280 61 11,461 62 11,642
63 11,823 64 12,004 65 12,185 66 12,366 67 12,547
94 96 99 101 104 107 109 112 114 117 120 122 125 127 130 132 135 138 140 143 145 148 150 153 156 158 161 163 166 169 171 174 176 179
68 12, 728 69 12,909 70 13,090 71 13,271 72 13, 452 73 13,633 74 13,814 75 13,995 76 14,176 77 14,357 78 14,538 79 14,719 80 14,900 81 15,081 82 15,262 83 15,443 84 15,624 85 15,805 86 15,986 87 16,167 88 16,348 89 16,529 90 16,710 91 16,891 92 17,072 93 17,253 94 17, 434 95 17, 615 96 17, 796 97 17,977 98 18,158 99 18, 339 100 18,520
161 184 187 189 192 194 197
199 202 205 207 210 212 215 218 220 223 225 228 230 233 236 238 241 243 246 249 251 254 256 259 261 264
Aroclor 1221 Temperature 140 C. Sp. Gr. - 1.072 @ 140 C. Inst. Range 0-273" H,0 Inst. Scale - 0-100%
TOWOLDMONOQ44162
AROCLOR 1232 ITEM 710
% Scale Gallons Ins.Aroclor % Scale Gallons Ins.Aroclor % Scale Gallons Ins.Aroclor
0 420 1 582 2 744 3 906 4 1068 5 1230 6 1392
7 1554 8 1716 9 1878 10 2040 11 2202 12 2364 13 2526 14 2688 15 2850 16 3012 17 3174 18 3336 19 3498 20 3660 21 3822 22 3984 23 4146 24 4308 25 4470 26 4632 27 4794 28 4956 29 5118 30 5280 31 5442 32 5604 33 5766
6 8 11 13 15 18 20 22 24 27 30 31 34 36 38 41 43 45 48 50 52 55 57 59 61 64 65 68 71 73 75 78 80 82
34
5928
85
35
6090
87
36
6252
89
37
6414
91
38
6576
94
39
6738
96
40
6900
98
41
7062
101
42
7224
103
43
7386
105
44
7548
108
45
7710
110
46
7872
112
47
8034
115
48
8196
117
49
8358
119
50
8520
121
51
8682
124
52
8844
126
53
9006
128
54
9168
131
55
9330
133
56
9492
135
57
9654
138
58
9816
140
59
9978
142
60 10,140 145
61 10,302 147
62 10,464 149
63 10,626 152
64 10,788 154
65 10,950 156
66 11,112 158
67 11,274 161
68 11,436 69 11,598 70 11,760 71 11,922 72 12,084 73 12,246 74 12,408 75 12,570 76 12, 732 77 12, 894
78 13,056 79 13,218 80 13,380 81 13,542 82 13,704 83 13, 566 84 14,028 85 14,190 86 14, 352 87 14,514 88 14,676 89 14,838 90 15,000 91 15,162 92 15,324 93 15,486 94 15,648 95 15,810 96 15,972 97 16,134 98 16, 296 99 16,458 100 16,620
163 165 168 170 172 175 177 179 182 184 186 188 191 193 194 198 200 202 205 20 7 209 212 214 216 219 221 223 225 228 230 232 235 237
Aroclor 1232 Temperature 140C.
Sp. Gr. - 1.160 @ 140 C.
Inst. Range - 0-278" H.O Inst. Scale - 0-100% 1
02 B4167
TOWOLDMONOQ44163
AROCLOR 1260 STORAGE TANK ITEM 711
Ins.Aroclor
Ins.Aroclor
Ins.Aroclor
7. Scale Gallons
(Innage) % Scale Gallons
(Innage) % Scale Gallons
(Innage)
0 420 1 601 2 782 3 963 4 1144 5 1325 6 1506
7 1687 8 1868 9 2049 10 2230 11 2411 12 2592 13 2773 14 2954 15 3135 16 3316 17 3497 18 3678 19 3859 20 4040 21 4221 22 4402 23 4583 24 4764 25 4945 26 5126 27 5307 28 5488 29 5669 30 5850
31 6031 32 6212 33 6393
6 9 11 14 16 19 21 24 27 29 32 34 37 40 42 45 47 50 52 55 58 60 63 65 68 70 73 76 78 81 83 86 89 91
34 6574 35 6755 36 6936 37 7117 38 7298 39 7479 40 7660 41 7841 42 8022
43 8203 44 8384 45 8565 46 8746 47 8927 48 9108 49 9289 50 9470 51 9651 52 9832 53 10,013 54 10,194 55 10,375 56 10,556 57 10,737 58 10,918 59 11,099 60 11,280 61 11,461 62 11,642 63 11,823 64 12,004 65 12,185 66 12,366 67 12,547
94 96 99 101 104 107 109 112 114 117 120 122 125 127 130 132
135 138 140
143 145 148 150 153 156 158 161 163 166 169 171 174 176 179
68 12,728 181 69 12,909 184 70 13,090 187 71 13,271 189 72 13, 452 192 73 13,633 194 74 13,814 197 75 13,995 199 76 14,176 202 77 14,357 205 78 14,538 20 7 79 14,719 210 80 14, 900 212 81 15,081 215 82 15,262 218 83 15,443 220 84 15,624 223 85 15,805 225 86 15,986 228 87 16,167 230 88 16,348 233 89 16,529 236 90 16,710 238 91 16,891 241
92 17,072 243 93 17,253 246 94 17, 434 249
95 17,615 251 96 17, 796 254 97 17,977 256 98 18,158 259 99 18,339 261 100 18,520 264
Aroclor 1260 Temperature - 140 C. Sp. Gr. - 1.511 @ 140C. Inst. Range - 0-394" H,0 Inst. Scale - 0-1007.
0284158
TOWOLDMONOQ44164
AROCLOR 1262 STORAGE TANK ITEM 712
Ins.Aroclor
Ins.Arcelor
Ins.ArocLor
% Scale Gallons
(Innagel % Scale Gallons
(Innage) % Scale Gallons
(Innage)
0 420 1 601 2 782 3 963 4 1144 5 1325 6 1506 7 1687 8 1868 9 2049 10 2230 11 2411 12 2592
13 2773 14 2954 15 3135 16 3316 17 3497 18 3678 19 3859 20 4040 21 4221 22 4402
23 4583 24 4764 25 4945 26 5126 27 5307 28 5488 29 5669 30 5850 31 6031 32 6212 33 6393
6 9 11 14 16 19 21
24 27 29 32 34 37 40 42 45 47 50 52 55 58 60 63 65 68 70 73 76 78 81 83 86 89 91
34 6574 35 6755 36 6936 37 7117 38 7298 39 7479 40 7660
41 7841 42 8022 43 8203 44 8384 45 8565 46 8746 47 8927 48 9108 49 9289 50 9470 51 9651 52 9832 53 10,013 54 10,194 55 10,375 56 10,556 57 10,737 58 10,918 59 11,099 60 11,280 61 11,461 62 11,642 63 11,823 64 12,004 65 12,185 66 12,366 67 12,547
94 96 99 101 104 107 109 112 114 117 120 122 125 127 130 132 135 138 140 143 145 148 150
153 156 158 161 163 166 169 1/1 174 176 179
68 12,728 69 12,909 70 13,090 71 13,271 72 13,452 73 13,633 74 13,814 75 13,995 76 14,176 77 14,357 78 14,538 79 14,719 80 14,900 81 15,081 82 15,262 83 15,443 84 15,624 85 15,805 86 15,986 87 16,167 88 16,348 89 16,529 90 16,710 91 16,891 92 17,072 93 17,253 94 17,434 95 17,615 96 17, 796 97 17,977 98 18,158 99 18,339 100 18,520
181 184 187 189 192 194 197 199 202 205 207 210 212 215 218 220 223 225 228 230
233 236 238 241 243 246 249 251 254 256 259 261 264
Aroclor 1262 Temperature - 140C. Sp. Gr. - 1.528 @ 1A0C. Inst. Range - 0-402 " HO Inst. Scale - 0-100% 2
0284159
TOWOLDMONOQ44165
MIX TANK ITEM 725 (15 SLOPE BOTTOM)
7. Scale Gallons Ins. Blends 7. Scale Gallons Ins. Blends % Scale Gallons Ins. Blends
0 15 6
1 34 8
2 60 10
3 94 12
4 136 14
5 184 16
6 250 18
7 320 20
8
400
23
9 500 25
10 600 27
11 700 29
12 800 31
13 925 33
14 1050 35
15 1174 37
16 1298 40
17
1422
42
18 1546 44
19 1670 46
20 1794 48
21 1918 50
22 2042 52
23 2169 54
24 2290 56
25 2414 58
26 2538 61
27 2662 63
28 2786 65
29 2910 67
30 3034 69
31 3158 71
32 3286 73
33 3406 75
34 3530 35 3654 36 3778 37 3902 38 4026 39 4150 40 4274 41 4398 42 4522 43 4646 44 4770 45 4894 46 5018 47 5142 48 5266 49 5390 50 5514 51 5638 52 5762 53 5886 54 6010 55 6134 56 6258 57 6382 58 6506 59 6630 60 6754 61 6878 62 7002 63 7126 64 7250 65 7374 66 7498 67 7622
77 80 82 84 86 88 90 92 94 96 98 100 103 105 107 110 111 113 115 117 119 121 124 126 128 131 132 134 136 138 140 142 145 147
68 7746 69 7870 70 7994 71 8118 72 8242 73 8366 74 8490 75 8614 76 8738 77 8862
78 8986 79 9110 80 9234 81 9358 82 9482 83 9606 84 9730 85 9854 86 9978 87 10102 88 10226 89 10350 90 10474 91 10598 92 10722 93 10846 94 10970 95 11094 96 11218 97 11342 98 11466 99 11590 100 11714
149 151 153 155 157 159 161 163 166 168 170 173 174 176 178 180 182 184 187 189 191 194 195 197 199 201 203 205 208 210 212
214 216
Mix Tank Temperature - 140C Sp. Gr. - 1.375 @ 140C
Inst. Range - 0-297" H20 Inst. Scale - 0-1007.
0284160
TOWOLDMONOQ44166
CM BLEND STORAGE TANK ITEM 726
Ins. Aroclor
Ins. Aroclor
Ins. Aroclor
% Scale Gallons
(Innage) % Scale Gallons
(Innaee) 7 Scale Gallons
(Innage)
0 420 1 601 2 782 3 963 4 1144 5 1325 6 1506 7 1687
8 1868 9 2049 10 2230 11 2411 12 2592 13 2773 14 2954 15 3135 16 3316 17 3497 18 3678 19 3859 20 4040 21 4221 22 4402 23 4583 24 4764 25 4945 26 5126 27 5307 28 5488 29 5669 30 5850 31 6031 32 6212 33 6393
6 9 11 14 16 19 21 24 27 29 32 34 37 40 42
45 47 50 52 55 58 60 63 65 68 70 73 76 78 81 83 86 89 91
34 6574 35 6755 36 6936 37 7117 38 7298 39 7479 40 7660 41 7841 42 8022 43 8203 44 8384 45 8565 46 8746 47 8927 48 9108 49 9289 50 9470 51 9651 52 9832 53 10013 54 10194 55 10375 56 10556 57 10737 58 10918 59 11099 60 11280 61 11461 62 11642 63 11823 64 12004 65 12185 66 12366 67 12547
94 96 99 101 104 107 109 112 114 117 120 122 125 127 130 132 135 138 140 143 145 148 150 153 156 158 161 163 166 169 171 174 176 179
68 12728 69 12909 70 13090 71 13271 72 13452 73 13633 74 13814 75 13995 76 14176 77 14357 78 14538 79 14719 80 14900 81 15081 82 15262 83 15443 84 15624 85 15805 86 15986 87 16167 88 16348 89 16529 90 16710 91 16891 92 17072 93 17253 94 17434 95 17615 96 17796 97 17977 98 18158 99 18339 100 18520
181 184 187 189 192 194 197 199 202 205 207 210 212 215 218 220 223 225 228 230 233 236 238 241 243 246 249 251 254 256 259 261 264
CM Blend Temperature - 140C Sp. Gr. - 1.265 @ 140C
Inst. Range - 0-334" H2O Inst. Scale - 0-100%
TOWOLDMONOQ44167
TCB STORAGE TANK
7. Scale Gallons Inches TCB
0 354 1 478 2 602 3 726 4 850 5 974 6 1098 7 1222 8 1346 9 1470 10 1594 11 1718 12 1842 13 1966 14 2090 15 2214 16 2338 17 2462 18 2586 19 2710 20 2834 21 2958 22 3082 23 3206 24 3330 25 3454 26 3578 27 3702 28 3826 29 3950 30 4074 31 4198 32 4322 33 4446
6 8 10 12 14 16 19 21 23 25 27 29 31 33 35 37 40 42 44 46 48 50 52 54 56 58 61 63 65 67 70 71 73 75
% Scale Gallons Inches TCB
34 4570 35 4694 36 4818 37 4942 38 5066 39 5190 40 5314 41 5430 42 5562 43 5686 44 5810 45 5934 46 6058 47 6182 48 6306 49 6430 50 6554 51 6678 52 6802 53 6926 54 7050 55 7174 56 7298 57 7422 58 7546 59 7670 60 7794 61 7918 62 8042 63 8166 64 8290 65 8414 66 8538 67 8662
77 80 82 84 86 88 90 92 94 96 98 100 102 105 107 109 111 113 115 117 119 121 124 126 128 130 132 134 136 138 140 142 145 147
% Scale Gallons Inches TCB
68
8786
149
69
8910
151
70
9034
153
71
9158
155
72
9282
157
73
9406
159
74
9530
161
75
9654
163
76
9778
166
77
9902
168
78 10026 170
79 10150 172
80 10274 174
81 10398 176
82 10522 178
83 10646 180
84 10770 182
85 10894 184
86 11018 187
87 11142 189
88 11266 191
89 11390 193
90 11514 195
91 11638 197
92 11762 199
93 11886 201
94 12070 203
95 12134 205
96 12258 208
97 12382 210
98 12506 212
99 12630 214
100 12754 216
TCB Temperature - 140C Sp. Gr. - 1. 303 140C Inst. Range - 0-281" H,0
Inst. Scale - 0-100%
0284162
TOWOLDMONOQ44168
TTCB STORAGE TANK ITEM 734
y0 Scale Gallons Inches TTCB % Scale Gallons Inches TTCB % Scale Gallons Inches TTCB
0 354 1 478 2 602 3 726 4 850 5 974 6 1098 7 1222 8 1346 9 1470 10 1594 11 1718 12 1842 13 1966 14 2090 15 2214 16 2338 17 2462 18 2586 19 2710 20 2834 21 2958 22 3082 23 3206 24 3330 25 3454 26 3578 27 3702 28 3826 29 3950 30 4074 31 4198 32 4322 33 4446
6 8 10 12 14 16 19 21 23 25 27 29 31 33 35 37 40 42 44 46 48 50 52 54 56 58 61 63 65 67 70 71 73 75
34 4570 35 4694 36 4818 37 4942 38 5066 39 5190 40 5314 41 5430 42 5562 43 5686 44 5810 45 5934 46 6058 47 6182 48 6306 49 6430 50 6554 51 6678 52 6802 53 6926 54 7050 55 7174 56 7298 57 7422 58 7546 59 7670 60 7794 61 7918 62 8042 63 8166 64 8290
65 8414 66 8538 67 8662
77 80 82 84 86 88 90 92 94 96 98 100 102 105 107 109 111 113 115 117 119 121 124 126 128 130 132 134 136 138 140 142 145 147
68
8786
149
69
8910
151
70
9034
153
71
9158
155
72
9282
157
73
9406
159
74
9530
161
75
9654
163
76
9778
166
77
9902
168
78 10026 170
79 10150 172
80 10274 174
81 10398 176
82 10522 178
83 10646 180
84 10770 182
85 10894 184
86 11018 187
87 11142 189
88 11266 191
89 11390 193
90 11514 195
91 11638 197
92 11762 199
93 11886 201
94 12070 203
95 12134 205
96 12258 208
97 12382 210
98 12506 212
99 12630 214
100 12754 216
TTCB Temperature - 140C Sp. Gr. - 1.357 @ 140C Inst. Range - 0-293''H20
Inst. Scale - 0-100%
028i,lb3
TOWOLDMONOQ44169
ITEM NO. FUNCTION:
EQUIPMENT PERFORMANCE CRITERIA
DESCRIPTION:
CAPACITY:
PERFORMANCE CRITERIA:
COMMENTS ON PERFORMANCE:
ITEMS TO BE CORRECTED:
CHECKED BY:________________ Signature
0^8*164
TOWOLDMONOQ44170