Document JrK6GRXw5p86DKr0wQd0VZ2O6
NPDES Compliance Inspection Report
Tree Farm North Bend, Washington Washington State Department of Ecology Construction Stormwater General Permit
Permit # WAR309272 Inspection Date: December 16, 2022
Prepared by:
Kyle Masters U.S. Environmental Protection Agency, Region 10 Enforcement & Compliance Assurance Division, Surface Water Enforcement Section
Inspector Signature/Date:
Masters, Jonathan
Digitally signed by Masters, Jonathan Date: 2023.02.28 13:56:38 -08'00'
Supervisor Signature/Date:
MICHELE JENCIUS
Digitally signed by MICHELE JENCIUS Date: 2023.02.28 14:01:51 -08'00'
Tree Farm NPDES # WAR309272
Contents
I. Project Information ............................................................................................................. 1 II. Inspection Information........................................................................................................ 1 III. Permit Information.............................................................................................................. 2 IV. Background............................................................................................2 V. Inspection Chronology........................................................................................................ 3 VI. Opening Conference ........................................................................................................... 4 VII. Site Review............................................................................................5 VIII. Records Review .................................................................................................................. 6 IX. Areas of Concern ................................................................................................................ 7 X. Closing Conference............................................................................................................. 9 ATTACHMENT A - Satellite Image ............................................................................................. 9 ATTACHMENT B - Photograph Log ......................................................................................... 11
Tree Farm NPDES # WAR309272
I. Project Information
Project Name: Project Owner: Project Operator: Physical Address: Latitude and Longitude: SIC Code: NAICS Code: Operator Contacts:
Owner Contacts:
Permit Number: Receiving Water:
Tree Farm
SSHI LLC, dba D.R. Horton 11241 Slater Avenue NE, Kirkland, WA 98033
Aero Construction 3827 Bickford Avenue, Snohomish, WA 98290
1085 & 1145 Maloney Grove Avenue SE, North Bend, WA 98045
47.482292, -122.777352
1794 - Excavation Work
238910 - Site Preparation Contractors
Robert Bates, Project Superintendent Aero Construction Office Phone: (425) 334-0082
Steve Avril, Project Manager Earth Solutions NW, LLC Email: stevea@esnw.com
Tony Brandolini, Land Development Project Manager Work Cell Phone: (425) 223-1331 Email: AJBrandolini@drhorton.com
Clint Lucas, Division Vice President of Land Development Work Cell Phone: (425) 229-2802 Email: CBLucas@drhorton.com
WAR309272
South Fork Snoqualmie River - Snoqualmie River - Snohomish River - Puget Sound
II. Inspection Information
Inspection Date:
December 16, 2022
Page 1 of 18
Inspectors:
Other Individual Present:
Arrival Time: Departure Time: Weather: Purpose:
Kyle Masters, Inspector EPA Region 10, ECAD / SWES
Tree Farm NPDES # WAR309272
Jon Klemesrud, Inspector EPA Region 10, ECAD / FDDWES
Charles Hackel Water Quality Program Washington State Department of Ecology
9:50 AM
12:20 PM
Mostly Sunny
Evaluate compliance with the requirements of the Clean Water Act, the National Pollutant Discharge Elimination System (NPDES), and the State Waste Discharge General Permit for stormwater discharges associated with construction activity (Construction Stormwater General Permit or CGP).
III. Permit Information
The Tree Farm subdivision construction project (Tree Farm) is permitted under the State of Washington Department of Ecology's (Ecology) Construction Stormwater General Permit (CGP). The current version of the CGP became effective on January 1, 2021 and expires on December 31, 2025.
Mr. Jamie Waltier, representing Harbour Homes, LLC, submitted the initial permit application (notice of intent) for the project in June of 2020. They obtained coverage on July 15, 2020 and in November fell under the reissued CGP. According to Ecology's Permitting and Reporting Information System (PARIS), Mr. Waltier and Harbour Homes completely transferred permit coverage to Mr. Alan Paszek and SSHI LLC (D.R. Horton) with an effective date of December 30, 2020. Throughout, the permit tracking number remained WAR309272. These documents show the total area of soil disturbance over the life of the project at 16.29 acres, out of a total site area of 17.91 acres. The permit coverage transfer letter estimated the project completion date of December 30, 2022.
IV. Background
According to the Stormwater Pollution Prevention Plan (SWPPP), the Tree Farm project consists of 58 residential lots in a new housing development. Project operators, in accordance with the SWPPP, designed the site to infiltrate most runoff during construction. During initial clearing,
Page 2 of 18
Tree Farm NPDES # WAR309272
grading and site development, the site utilized three sediment ponds for infiltration. The project shifted to using individual house lots as temporary settling ponds. Both controls allow stormwater to infiltrate. Operators pump extra runoff into the engineered infiltration basin that runs along the center of the site, which they constructed after the initial period of heavy earth moving. The SWPPP notes runoff generally flows south to north along a preexisting drainage channel for approximately two thirds of the site. The SWPP also notes runoff from the western third of the site generally sheet flows off-site to adjacent properties, flowing to the west.
Proposed construction activities over the life of the project includes site preparation, clearing and grading activities, associated underground utilities, excavation for building foundations, poured concrete foundations, concrete sidewalks, and asphalt paving for residential streets within the development. Actual housing unit construction would follow the utilities and neighborhood amenities. See Attachment A for a satellite image overview of the site's layout.
While researching Tree Farm in PARIS, I discovered their April Discharge Monitoring Reports (DMRs) listing a discharge with a turbidity reading of 509 Nephelometric Turbidity Units (NTUs) on April 4, 2022. I asked Mr. Hackel for a copy of Environmental Report Tracking System (ERTS) report stemming from the highly turbid discharge. He supplied ERTS #713990 on December 12, 2022. According to the ERTS, Tree Farm's CESCL contractor, Ms. Marley Adams of Earth Solutions NW, reported the discharge occurred at approximately 10:00 a.m., and collected the highly turbid sample at 11:45 a.m. on Monday, April 4. They notified Ecology of the discharge at 8:20 p.m. on Tuesday, April 5, approximately 34 hours after the discharge.
On December 13, 2022, I emailed the City of North Bend contact listed in the ERTS and asked about impacts from the discharge. Mr. Bryan Tucker, of North Bend, stated in an email they issued a stop work order to Tree House due to the discharge event. He characterized it as a pond blowout that quickly overcame the on-site BMPs and led to minor flooding of a neighboring residential development. Most of the discharge infiltrated through the other neighborhood's bioretention swales. North Bend staff said the Tree Farm project's Certified Erosion and Sediment Control Lead (CESCL) sampled and recorded the results from one of these swales as the actual discharged ended prior to the CESCL's arrival on-site.
V. Inspection Chronology
On December 12, 2022, along with Mr. Klemesrud and Mr. Hackel, I attempted to conduct an unannounced compliance evaluation inspection (CEI) of the Tree Farm site. We arrived at approximately 12:00 p.m. and found the site fenced-off with locked gates. We walked the streetwards (eastern) perimeter of the site and took photos of our observations (Photos 1-6). We observed approximately four uncovered soil stockpiles (Photos 1-2). We also saw some silt fence badly frayed and torn along the north perimeter (Photo 6).
We saw a fuel truck visit the site. The driver unlocked the gate, drove inside the site, and filled up the project's on-site fuel storage and dispensing truck. As the driver left, I asked him about the site. He told me the site had been quiet for a few weeks, but he had access and made regular stops. After the fueler left, I called the phone number for Mr. Paszek listed on the transfer of coverage letter. Then I called Mr. Dustan Windrick, listed as the "Developers Contact" on the
Page 3 of 18
Tree Farm NPDES # WAR309272
posted Notice of Proposed Construction Activity located at the site (Photo 3). I failed to reach either, and though I left voicemails, I did not receive a return call. We left the site at approximately 12:50 p.m.
On December 13, I spoke with Mr. Clint Lucas, Division Vice President of Land Development at D.R. Horton. He told me he assumed many of Mr. Paszek's duties while Mr. Paszek was away on leave. He also said Mr. Windrick left the company. He agreed to my request to open the site for an inspection, and we agreed to meet on the morning of Friday, December 16.
Mr. Klemesrud, Mr. Hackel, and I arrived at Tree Farm front gate at 9:50 am. We met with: Mr. Tony Brandolini, Land Development Project Manager at D.R. Horton Mr. Daniel Merlino also of D.R. Horton Mr. Robert Boles of Aero Construction Mr. Steve Avril of Earth Solutions NW Mr. Daniel Devine of Earth Solutions NW
Both Mr. Klemesrud and I presented our inspector credentials to Mr. Brandolini. Mr. Brandolini and other site representatives accompanied us throughout the inspection, though Mr. Brandolini left at approximately 11:30 a.m. for another engagement. Site representatives granted access to the site.
I began the inspection with an opening conference to discuss the Tree Farm project, and the CGP. I conducted an initial records review. I stated I would request electronic copies of the required records after the site walkthrough, and Mr. Brandolini stated he understood and would make the documents available. I toured the project, walking the site perimeter, and held a closing conference with Mr. Boles, Mr. Merlino, and the others above.
VI. Opening Conference
Mr. Brandolini confirmed Mr. Windrick left the company, and Mr. Paszek stepped away in July for an extended leave of absence. Mr. Brandolini also said this inspection represented only his second visit to Tree Farm site. He told us Aero Construction served as the project's primary operators, responsible for the clearing and grading, utility installation, and visible improvements to date. He explained D.R. Horton primarily stays in the vertical construction sector, i.e., home building, as opposed to performing the horizontal construction work, i.e., clearing and underground utilities. He said D.R. Horton typically contracts those phases of development to other companies.
Mr. Boles confirmed he served as project superintendent, with responsibilities including preparing the site for house construction by placing the utilities, and maintaining stormwater BMPs, and other day-to-day responsibilities. He said he took over the site from another Aero Construction project superintendent in August. He also told us they put in most of the neighborhood streets in October, and that Tree Farm went relatively inactive around Thanksgiving due to a combination of weather, illness, and using leave. He said the applied fresh hydroseeding in November. Mr. Brandolini confirmed that Mr. Boles and Aero
Page 4 of 18
Tree Farm NPDES # WAR309272
Construction would make any necessary corrections stemming from this inspection, and that they responded to BMP maintenance needs identified by weekly CESCL inspections. Mr. Devine and Mr. Avril stated they, usually Mr. Devine, perform the weekly site inspections. Mr. Devine confirmed his status as a trained CESCL.
Mr. Brandolini confirmed DR Strong Consulting provided engineering design for the BMPs used on-site, including the final infiltration system, and they prepared the SWPPP. He said DR Strong Consulting performed this work for the initial development company, Harbour Homes, and when D.R. Horton purchased the site, the plan came with the site.
At the end of the opening conference, I conducted an initial records review and confirmed site owners and operators retained copies of these documents on-site:
Permit coverage and transfer of coverage letter The construction stormwater general permit Site Map (Photo 7) SWPPP (cover page - Photo 8) Site Log Book with accumulated weekly inspection records (cover page of 12/09/22
inspection - Photo 8).
VII. Site Review
We began our tour of the construction site near the main entrance, along Mahoney Grove Avenue. We followed a counterclockwise pattern, moving from the northeast corner to the northwest, southwest, staging ground, then back to the entrance. Attachment B contains photographs taken during the site walk-through and a complete photo log. The site appeared well vegetated since they hydroseeded less than two months prior to the inspection. Additional BMPs observed included perimeter silt fencing, stabilized construction entrance feeding the staging ground only, temporary ponds, straw wattles and mulch, rock check dams, and riprap channel lining. Mr. Brandolini, Mr. Boles, Mr. Avril, Mr. Devine, and Mr. Merlino accompanied us on the site walk, until Mr. Brandolini's departure.
At the northwest corner, and main paved site entrance, we noticed the same silt fence in Photo 6; it still looked frayed, collapsed, and in need of repair (Photo 10). Continuing west along the perimeter we saw an installed bioswale and noted the berms outlining future housing lots, helping with stormwater control and infiltration (Photos 11-12). We also saw the operator draining stormwater from a lot on the central paved area and nearby bioswale, which drains into the northern bioswale and potential outfall, with check dams (Photos 13-16).
We then saw where Tree Farm will connect to the northerly neighboring development in the future. The April 2022 discharge event occurred at this outfall, Mr. Boles confirmed for us. We saw installed silt fence and sandbags (Photo 18). Further west, we observed a drainage channel, with straw mulching, between the lot berms and the edge of the site (Photo 19). Turning south along the western perimeter, we saw additional silt fencing; at the northwestern-most lots we saw the drainage path mention above leading to a catch basin (Photos 20-21).
Page 5 of 18
Tree Farm NPDES # WAR309272
Further south, in an area below grade most of Tree Farm, we saw some silt fence, retaining walls, and rip-rap drainage channel mixed with natural woody growth (Photos 22-23). Mr. Boles told us this part of Tree Farm lay in a designated FEMA floodplain.
Turning back east, along the southern perimeter, we saw noticeable signs of erosion along a concrete wall, with flow apparently into the floodplain (Photo 24). Mr. Boles told us this appeared new. Continuing east we saw more lots temporarily holding stormwater, silt fencing along the perimeter, and we saw an unworked, uncovered soil stockpile (Photos 25-26). Further east we saw a temporary swale for inflow drainage, and the permanent bioswale along the middle-southern portion of the site containing check-dams that will aid in future infiltration at Tree Farm (Photos 27-30).
Next, at the southeast portion of Tree Farm, we inspected the staging ground, also referred to as the laydown area, portion of the site. We observed a small concrete washout area, with the perimeter partly reinforced with wattle and sandbags. We noted the same uncovered soil stockpiles from our December 12 site visit behind this area (Photo 31-33). We observed the onsite fuel truck, described above, water truck, approximately five excavators of various sizes, and a large dump truck staged in the area (Photos 33-34). We did not observe a spill kit near these trucks, though Mr. Boles told us they keep some spill response equipment, namely spill absorbent pads, inside the fuel truck. Closer to the concrete washout area, but showed in the foreground of Photo 34, we saw a portable sanitation facility. It appeared unsecured.
We also observed two pallets holding weathered chemical materials in this area. On one pallet we saw seven containers ranging in size from 55-gallon drum to 5-gallon pail, to one-pint can holding a variety of oils and paints (Photos 35-37). We did not see any spill response equipment, over head coverings, or other pollution control devices in this area. In the background of Photo 35, we also saw a second pallet holding many, approximately 40-pound, bags of bentonite and ready-mix concrete. The bags appeared sealed from the wholesaler/retailer, but also appeared weathered and lacking containment.
VIII. Records Review
As noted above, I spot-checked the presence of CGP required documents while on-site. After the inspection, I emailed Mr. Lucas and requested the below records for detailed review. Site contacts provided these records by December 19, including site inspection reports for the history of the project:
Stormwater Pollution Prevention Plan (SWPPP) - During the inspection, I noted the SWPPP contained references to Harbour Homes LLC, and named Jamie Waltier in the Pollution Prevention Team. The plan also contains an inaccurate, no longer in service, telephone number for the Department of Ecology.
Site Map - The map in the SWPPP did not appear to show all BMPs used on-site. Site Log Book (including: site inspections, stormwater monitoring, BMP maintenance
history) - Inspection reports reviewed on-site did not include thorough history and explanations for BMP maintenance.
Page 6 of 18
Tree Farm NPDES # WAR309272
All notifications sent to Ecology regarding the April storm event and discharge.
IX. Areas of Concern
I identified the following areas of concern from observations made before and during the inspection:
A. Site Operators and Permit Coverage
Section S1.B of the permit states: "Operators of the following construction activities are required to seek coverage...(c)learing, grading, and/or excavation that results in the disturbance of one or more acres..." Appendix A - Definitions: "Operator means any party associated with a construction project that meets either of the following two criteria: (t)he party has operational control over the construction plans and specifications, including the ability to make modifications to those plans and specifications...(t)he party has day-to-day operational control of those activities at a project that are necessary to ensure compliance with the SWPPP for the site or other permit conditions..."
1. During the inspection, Mr. Brandolini told us our inspection represented his second visit to the site. He told us Mr. Boles and Aero Construction performed the clearing and grading at the site. Mr. Boles also told us he was responsible for following up with BMP maintenance and agreed that he and Aero Construction performed the clearing and grading activities. According to PARIS, Aero Construction lacks permit coverage at the Tree Farm site.
B. High Turbidity Reporting Requirement
Section S5.A of the permit states: "Anytime sampling performed in accordance with Special Condition S4.C indicates turbidity has reached the 250 NTUs or more...the Permittee must notify Ecology within 24 hours of analysis either by calling...or by submitting an electronic ERTS report." Section S5.F states: "In the event the Permitee is unable to comply with any part of the terms and conditions of this permit...or exceed numeric effluent limitations...the Permittee must...(n)otify Ecology within 24 hours of the failure to comply..."
1. After the April 4, 2022 high turbidity discharge event, which occurred at approximately 10:00 a.m., the Permittee failed to notify Ecology until April 5, 2022 at 8:20 p.m.
C. Discharge Monitoring Reports
Section S5.B of the permit states: "Permittees required to conduct water quality sampling...must submit the results to Ecology...(they) must submit monitoring data using Ecology's WQWWEBDMR web application...Permittees must submit DMR forms to be received by Ecology within 15 days following the end of each month.
Page 7 of 18
Tree Farm NPDES # WAR309272 1. The Permittee submitted the May 2022 DMR on July 13, 2022. 2. The Permittee submitted the July 2022 DMR on August 30, 2022. 3. The Permittee submitted the October 2022 DMR on November 21, 2022.
D. General SWPPP Requirements
Section S9.B of the permit states: "The Permittee must modify the SWPPP whenever there is a change in design, construction, operation, or maintenance at the construction site that has, or could have a significant effect on the discharge of pollutants to waters of the State.
1. The on-site SWPPP review found it listed Mr. Waltier of Harbour Homes LLC as a member of the site's Pollution Prevention Team and Emergency Permittee Contact.
2. The on-site SWPPP review also found an inaccurate, out of date, telephone number listed for the Department of Ecology's Northwest Regional Office.
E. BMP Installation and Maintenance
Section S3.C.2. of the permit states: "Implement stormwater BMPs contained in stormwater management manuals published or approved by Ecology, or BMPs that are demonstrably equivalent to BMPs contained in stormwater management manuals published or approved by Ecology, including the proper selection, implementation, and maintenance of all applicable and appropriate BMPs for on-site pollution control." Section S9.D.11.2 states: "Permittees must maintain and repair all temporary and permanent erosion and sediment control BMPs as needed to assure continued performance of their intended function in accordance with BMP specification.
1. During the inspection we observed a portion of silt fence in need of repair (Photos 6, 9). On-site BMP inspection reports noted the deficiency.
2. The temporary below-grade concrete washout area's plastic liner lacked securing and failed to line the entire surface area of the washout (Photo 31).
F. Stabilize Soils
Section S9.D.5.a of the permit states: "The Permittee must stabilize exposed and unworked soils by application of effective BMPs that prevent erosion. Applicable BMPs include...plastic covering..." Sections S9.D.5.e-f state: "The Permittee must stabilize soils at the end of the shift before a holiday or weekend...The Permittee must stabilize soil stockpiles from erosion, protected with sediment trapping measures..."
1. On both December 12 and 16 we observed approximately five unworked stockpiles lacking stabilization (Photos 1-3, 25, 31-33).
Page 8 of 18
E. Control Pollutants
Tree Farm NPDES # WAR309272
Section S9.D.9-. b of the permit states: "Design, install, implement and maintain effective pollution prevention measures to minimize the discharge of pollutants. The Permittee must: (h)andle and dispose of all pollutants...including waste materials...that occur on site...(p)rovide cover, containment, and protection from vandalism for all chemicals, liquid products, petroleum products, and other materials that have the potential to pose a threat to human health or the environment. Minimize storage of hazardous materials on site. Section S9.D.c states: "Conduct maintenance, fueling, and repair of heavy equipment and vehicles using spill prevention and control measures."
1. During the inspection we observed two pallets holding weathered chemical materials stored without cover, spill response equipment, or other controls (Photos 35-37). These materials included oil, paints, and bentonite and ready-mix concrete.
2. The portable on-site sanitation facility appeared unsecured (Photo 34).
3. The staging ground, or laydown area, where we saw a fuel truck and multiple heavy excavation machines lacked appropriate spill response measures, such as a dedicated oil and fuel spill kit (Photos 31-34).
X. Closing Conference
We held a closing conference with Mr. Boles, Mr. Avril, Mr. Merlino, and Mr. Devine. We discussed the areas of concern identified during the inspection and thanked them for their time and assistance. We departed Tree Farm at approximately 12:20 p.m.
Page 9 of 18
Tree Farm NPDES # WAR309272
ATTACHMENT A - Satellite Image
Satellite imagery of the Tree Farm project from Digital Globe dated July 30, 2022.
Page 10 of 18
Tree Farm NPDES # WAR309272
ATTACHMENT B - Photograph Log
(Photographs taken by Jon Klemesrud on December 12 and 16, 2022 with a Nikon Coolpix AW100 camera)
Photo 1
Photo 2
Photo 3
Photo 4
Photo 5
Photo 6
Page 11 of 18
Tree Farm NPDES # WAR309272
Photo 7
Photo 8
Photo 9
Photo 10
Photo 11
Photo 12
Page 12 of 18
Photo 13
Tree Farm NPDES # WAR309272
Photo 14
Photo 15 Photo 17
Photo 16 Photo 18
Page 13 of 18
Tree Farm NPDES # WAR309272
Photo 19
Photo 20
Photo 21
Photo 22
Photo 23
Photo 24
Page 14 of 18
Photo 25
Tree Farm NPDES # WAR309272
Photo 26
Photo 27
Photo 28
Photo 29
Photo 30
Page 15 of 18
Photo 31
Tree Farm NPDES # WAR309272
Photo 32
Photo 33 Photo 35
Photo 34 Photo 36
Page 16 of 18
Tree Farm NPDES # WAR309272
Photo 37 Photo Number Photo 1 Photo 2 Photo 3 Photo 4 Photo 5 Photo 6 Photo 7 Photo 8 Photo 9 Photo 10 Photo 11 Photo 12
Photo 13 Photo 14 Photo 15 Photo 16 Photo 17
Photo 18
Photo 19 Photo 20 Photo 21 Photo 22
Digital Image Number
DSCN2954.JPG DSCN2955.JPG DSCN2956.JPG DSCN2957.JPG DSCN2958.JPG DSCN2959.JPG DSCN3066.JPG DSCN3067.JPG DSCN3068.JPG DSCN3069.JPG DSCN3070.JPG DSCN3071.JPG
DSCN3072.JPG DSCN3073.JPG DSCN3074.JPG DSCN3075.JPG DSCN3076.JPG
DSCN3077.JPG
DSCN3078.JPG DSCN3079.JPG DSCN3080.JPG DSCN3081.JPG
Description of Digital Image
Facing north, photo of eastern perimeter along Malone Grove Ave SE Facing west, photo of southern perimeter from Malone Grove Ave SE Facing west, photo of City of North Bend project signage from Malone Grove Ave SE
Facing west, photo of area south of the paved construction access from Malone Grove SE
Facing south, photo of eastern perimeter along Malone Grove SE Facing west, photo of northern perimeter from Malone Grove SE Photo of SWPPP Site Map & BMP Legend
Photo of SWPPP Cover Page
Facing west, photo of northern perimeter from Malone Grove Ave SE Facing west, photo of northern perimeter west of Malone Grove Ave SE Facing south, photo of north/northeast bioswale from northern perimeter Facing west, photo of northern perimeter and overflow catch basin to primary swale/outfall location.
Date and Time
Digital Image Taken
12/12/2022
12:29 PM
12/12/2022
12:30 PM
12/12/2022
12:30 PM
12/12/2022
12:31 PM
12/12/2022 12/12/2022 12/16/2022 12/16/2022 12/16/2022 12/16/2022 12/16/2022 12/16/2022
12:31 PM 12:34 PM 10:35 AM 10:36 AM 10:46 AM 10:48 AM 10:51 AM 10:53 AM
Facing south, photo of temporary lot drainage to central paved area. Facing north, photo of northern bioswale and potential outfall area Facing east, photo of check damn and drainage area within northern bioswale Facing northeast, photo of check dam and drainage area within northern bioswale Facing north, photo of sandbag diversion and silt fence bmp between adjacent neighborhood access road
12/16/2022 12/16/2022 12/16/2022 12/16/2022 12/16/2022
10:57 AM 10:58 AM 11:00 AM 11:01 AM 11:06 AM
Facing north, photo of sandbag diversion and silt fence bmp between adjacent neighborhood access road
12/16/2022
11:06 AM
Facing west, photo of northwest perimeter and associated drainage channel. Facing south, photo of western perimeter and silt fencing/berming BMPs Facing northwest, photo of northwest lot drainage/overflow
Facing south, photo of FEMA floodplain area along western
12/16/2022 12/16/2022 12/16/2022 12/16/2022
11:09 AM 11:12 AM 11:13 AM 11:15 AM
Page 17 of 18
Tree Farm NPDES # WAR309272
perimeter
Photo 23 Photo 24 Photo 25 Photo 26
DSCN3082.JPG DSCN3083.JPG DSCN3084.JPG DSCN3085.JPG
Facing north, photo of FEMA floodplain area along western perimeter Facing west, photo of southwest perimeter, minimal erosion observed along concrete wall
Facing north/northeast, photo of stockpile near southern perimeter Facing east, photo of southwest perimeter
Photo 27
DSCN3086.JPG
Facing east, photo of inflow drainage
Photo 28
DSCN3087.JPG
Facing north, photo of southeast perimeter silt fencing bmp
Photo 29
DSCN3088.JPG
Facing north, photo of inflow drainage/bioswale
Photo 30 Photo 31 Photo 32
DSCN3089.JPG DSCN3090.JPG DSCN3091.JPG
Facing north/northeast, photo of primary/inflow drainage bioswale Facing southeast, photo of concrete washout area, stockpiles in the background. Facing west, photo of southeast perimeter and sand stockpile
Photo 33
DSCN3092.JPG
Facing west, photo of stockpiles and material storage area
Photo 34 Photo 35
DSCN3093.JPG DSCN3094.JPG
Facing north/northeast, photo of machine/equipment staging ground area Facing west, photo of material/product storage area
Photo 36
DSCN3095.JPG
Photo of drum with Tellus Oil 32 hydraulic oil label
Photo 37
DSCN3096.JPG
Photo of material/product storage area
NOTE: The date stamps on Photos 1-6, From December 12, are an hour later than actual time.
12/16/2022 12/16/2022
12/16/2022 12/16/2022 12/16/2022 12/16/2022 12/16/2022 12/16/2022 12/16/2022 12/16/2022 12/16/2022 12/16/2022 12/16/2022 12/16/2022 12/16/2022
11:19 AM 11:21 AM
11:24 AM 11:25 AM 11:27 AM 11:31 AM 11:35 AM 11:37 AM 11:43 AM 11:47 AM 11:49 AM 11:51 AM 11:56 AM 11:57 AM 11:57 AM
Page 18 of 18