Document Jr353zGyQZK3aZwvJkgKypZrZ

Monsanto mom )N*Mt: location) Anniston, Alabama ACFMENCl July 30, 1968 CEA 1630 - AROCLOR EXPANSION PALLET DISPENSERS TO R, W. Peterson St. Louis R. M. Kountz - RKOUN W. A. Kuhn - WKUHN J. C. Landwehr W. B. Papageorge H. L. Williams We've reviewed the pallet handling situation critically in connection with the new f laking-drunming facilities. Our conclusion is that, 6ince our existing pallets (weight - 125 pounds) require two men or mechanical assistance for handling, two pallet dispensers should be installed as a part of CEA 1630 to handle pallets used for filled Aroclor and Biphenyl bags. Pallets for drums of liquid products will be handled by fork lift with the empty drums stored on pallets as received (two men will be available during unloading). The dispensers are economically justified as follows: 1. Dispenser equipment cost is quoted at $8,000. If we allow $2,000 for installation the total cost becomes $10,000. 2. The pallet dispensers replace one man, one shift per day, seven days per week for a savings of $12,000. 3. So called light-weight pallets (weight - 63 pounds) being used here for shipment to customers requesting palletized material, cannot be stacked over two high from a structural strength standpoint. Our new warehouse (CEA-1652) was sized on the premise that stacking would be four pallets high minimum. The pallet dispensers will: a) Return their cost within one year, b) Aid us'in meeting project manpower claims, c) Allow use of pallets which can be stacked to meet the Warehouse (CEA-1652) scope and need. As a result, the Anniston Plant feel6 strongly that we should proceed with procurement end installation. W. F. Taffee :md 0386186 TOWOLDMONOQ44706