AIRBORNE FIBER COUNTS
for
American BiI trite Rubber Company Trenton, New Jersey
March I, 1972
Sampling 4 Counting by: Mr. P. W. McDaniel Industrial Hygienist Union Carbide Corporation
Reported by:
Mr, J. L. Myers Marketing Manager "Celidria" Asbestos Union Carbide Corporation
UNION CARBIDE CORPORATION Mining and Metals Division
Niagara Falls, New York
UCC 015971
JV23B74
X'
AIRBORNE ASBESTOS FIBER COUNTS
DESCRIPTION OF PLANT AND TESTS
The Tests were conducted in an average size floor tite plant. Vinyl/asbestos floor tile was being produced, as well as "chips" and other flooring products.
Asbestos and other dry materials such as limestone, pigments, resin, etc., are added to a charge hopper or blender. The mixture of raw materials is then dumped into a Banbury or similar type of high shear mixer.
All asbestos involved during the tests was open fiber Canadian.
In general the plant seemed very dusty and samples were collected from typical work areas which appeared to be the most likely sources of airborne asbestos. Local ventilation was in operation in equipment areas.
Samples were collected under the direction of a qualified Industrial Hygienist on Millipore filter paper by the use of battery-powered air pumps. The samples were examined for fiber content by a qualified Industrial Hygienist using the micro scopic procedure recommended in the proposed OSHA regulations recorded in the Federal Register on January 12, 1972.
TEST RESULTS
It must be recognized that the following data represent a very small number of samp Ies- taken over a short interval of time. No general conclusions can be drawn about average fiber counts or other dust levels.
All samples except one had fiber counts less than the emergency OSHA standard of 5 fibers/ml greater than 5 microns.
Sample Location (1) Inside railroad boxcar during manual handling of bags
of Canadian asbestos (2) At breathing zone of operators adding asbestos and
other raw materials to Banbury charge hopper (3) Background on platform at blender (nooperation)
(4) Same as (3) while adding asbestos from bags (5) Aisleway between 2 Banbury lines
(6) Aislev.ay in back of line (7) At finished tile cut-out machine
No. Fibers*
21.09
1.28 0.54 2.03 0.75 1.41 I -11
*No. fibers75^< per ml. air