Document JNvOaR9Ve4da3veRZL5dkk7ZX
FROfc J. J. CONGLhTON ROCKDALE WORKS
TO MANAGERS DEPARTMENT HEADS SUPERINTENDENTS
1977-11-22
RE: OSHA CLOSING CONFERENCE, 1977-11-21 MONDAY 10:00 A.M. - 12 NOON ROCKDALE WORKS
Attached is a list o those people who attended and their respective function.
Attached is an item by item list of apparent safety and health hazards, associate area of the plant, and proposed abatement dates. Items marked with an asterik have been identified as hazards and a citation will be forthcoming. Those items not marked means that samples were taken and possible citations may result de pending upon the findings from the analysis of those samples.
This list of items resulted from Mr. Carl Halgren, Industrial Hygienist and Mr. Walt Cunningham, Safety Engineer from OSHA conducting an inspection of the Rockdale Works facility on:
1977-11-03 1977-11-04 1977-11-08 1977-11-09 1977-11-10 1977-11-11 1977-11-17 1977-11-18
Mr. Halgren and Mr. Cunningham conducted themselves in a very professional and competent manner throughout the inspection.
Mr. Halgren's closing conference was also conducted equally professional. The Union and the Company maintained a businesslike approach throughout the inspec tion and closing conference.
It is now a matter of applying ourselves (jointly) to final resolution of these items.
A copy of the results of the sampling and the methods used in analyzing the samples will be requested in writing from OSHA.
A follow-up report will accompany the citation upon its receipt.
J. J. CONGLETON
JJC:mj 2/1
Attachments
For Distribution See Page TVio
ARD 014553
Attachment I
Name 1. J. J. Congleton 2. E. B. Parker 3. W. G. Henson 4. J. E. Crowder 5. Joe R. Hughes 6. Fred Mabry 7. Harry W. Brooks 8. E. J. Gaas 9. A. G. Clayton
10. J. L. Roddy 11. J. W. Havins 12. Evan R. Goltra, M.D. 13. W. D. Essary 14. C. L. Green 15. Farrel H. Sutton 16. H. P. Dick 17. Thomas Williams 18. Neal Ritchey 19. Nelson Mueller 20. Jack Drake '
OSHA Closing Conference 1977-11-21 10:00 a.m. - Monday - Rockdale Works
Position Manager of Safety Environmental Superintendent Union Safety Company Chairman Potlining Safety Chairman Staff Representative USNA Staff Representative USWA Personnel Manager Potroom Safety Chairman Chief Chemist Electrode Superintendent Production Manager Medical Engineering Manager Environmental Manager Potroom Superintendent Ingot Safety Chairman Carbon Plant Chairman Potlining 8 Service Superintendent Safety 6 Health Administrator Works Manager
mj 2/1
ARD0A4555
Attachment II
Item g Brief Description______________________ 1.* Chlorine respirators not available for
emergency escape from area.
2.* Opening to the top of mixer not guarded
Area of Plant Properzi
n/a. eeP Ts
Action to be taken and Length of Abatement Period
Provide respirators - 15 days
Potlining - Building 127
/> itf. .
- 7./HO
Guarded and abated - 1977-11-10
3.^ Carbon Monoxide alarm not installed for plant air compressors that are used sometimes for breathing air.
4.* No attempt to reduce air flow from plant air system (100 psi +15 psi) - being used to blow off pots and superstructures.
Total Plant Potrooms
*7 Of.
Install alarm - 30 days
"V - ...
* * ' "
(b',rr
Use of approved blow off pipes insuring no more than 30 psi air flow - 15 days.
5.* Pot Tenders eating their lunch in Potrooms (exposure to fluorides through ingestion)
> 3) o
2 6.* Not wearing approved asbestos respirator & while handling asbestos and in addition $ question whether the provided 3M 8710
asbestos respirator is adequate protection.
Potrooms
Potlining (Cradle insulation) r l'
''.v'JW'
'.MV'
Discontinue eating lunch or working in potrooms- 30 days.
Provide proper respirator. (15 days)
Attachment II
Item fi Brief Description______________ _________ 7.* Electric fork truck No. 33-164 had non-
approved modification to overhead guard (from four post ot three post overhead guard).
8. Samples taken from Coal Tar Pitch Volatiles
Area of Plant Ingot
Carbon Plant 1. Mixer 2. Press 3. Ring Furnace
ih'-.'y I9- If
Action to be taken and Length of Abatement Period
Install proper design overhead guard - IS days.
A. Provide proper respirator (15 days)
B. Develop Plan of Abatement (30 days)
C. Final Abatement (1 year)
9. Samples for respirable dust taken of (primarily of vehicle operators)
10. Samples Taken for Fluorides > 3) O
o
&
cn
-vl
Butt crushing mill Ore Unloading Bath Crushing Skim Room
A. Provide proper respirator (15 days)
B. Develop Plan of Abatement (30 days).
C. Final Abatement (6 months)
Potrooms
A. Provide proper respirators (15 days).
B. Develop Plan of Abatement (30 days)
C. Final Abatement (1 year)
Attachment II
Item g Brief Description 11. Samples Taken for Asbestos
12. Violation of respirators standards
13. Excessive Noise
14. Excessive Noise mj 2/1
Area of Plant Potlining (Shim Pot Cradles)
Total Plant
Action to be taken and Length of Abatement Period '
A. Provide proper respirator (15 days)
B. Develop Plan of Abatement (30 days)
C. Final Abatement (1 year)
Follow the Alcoa Engineering Standard 18.1.1 - 15 days.
Rodding Room
A. Develop abatement Plan (30 days)
B. Final Abatement - 1 year.
Ingot Furnace
A. Develop Abatement Plan (30 Days)
B. Final Abatement (1 year).