CATALYTIC CRACKING/GAS DAILY TURNAROUND GUIDES
8/28/87
Operations
3
B & R Maint. 4
Shell Maint. 0
SAFETY Several lights have been installed or repaired on the slurrystructure and at the Gas Fraot/Treater areas.
Just a reminder. Remember that operators must wear the organic respirators when sampling processes for Bensene.
*v LIR
CFG is having problems with boiler 0010. If they request it, we need to stop using all JOG psi steam being used in the main tract, strippers and in. any process lines. Conti ruie to use steam for 1 he terryj-turbine and steam air
':Q Li i.Y\ {
LIR
BOARD Environmental says we do not have to call them for opacity violations. Please collect and put the computer opacity printouts in the pouch. Good old Rudy Choir will co-llect all the data and report to Environmental.
The expander train cannot withstand pumping the blower. Some of the bolts are already broken. Therefore, do not deliberately do anything which is likely to pump it.
LIR
HEiILlL_^PSEAiQE
Correction.* There is a fuo i tank located next to the steam air decoking compressor. Th-ase use this fuel to keep the enp ress or;running.
LIR
LAM 018445
DPMC-12110
,1'
R,^ FRAHT TP.?S
All hands are continuing to do a good job. Keep up the good work.. When draining or venting, be sure to use the organic vapor respirator for protection against Benzene. Continue with the steam and wash steps. Use either tanks, S-352, S-354 or S-350 for the decontamination tanks. Strive for getting the isolation blinds installed. We've had one FR-II on the Bract., with R. Bishop injuring his knee. I don't have the full details at this time, but wish him well. The lighting problems ig. being taken care of as a result.